: 6309.11,42 Page 1 of 3 FOREST SERVICE HANDBOOK GIFFORD PINCHOT NATIONAL FOREST (REGION 6) VANCOUVER, WA FSH 6309.11 – CONTRACT ADMINISTRATION HANDBOOK CHAPTER 40 – CONTRACT MODIFICATIONS AND TERMINATIONS Supplement No.: R6/Gifford Pinchot-6309.11-2001-1 Effective Date: March 15, 2001 Duration: Effective until superseded or removed Approved: CLAIRE LAVENDEL Date Approved: 03/15/2001 Forest Supervisor Posting Instructions: Supplements are numbered consecutively by Handbook number and calendar year. Post by document name. Remove entire document and replace with this supplement. Retain this transmittal as the first page of this document. New Document(s): Superseded Document(s): (Last supplement was 6309.11-2000-1) 6309.11,40 (6309.11-2001-1) 42.1—1 –2 (GP Supp. No. 3) Digest: Insert digest information here 42.1 Reissues supplement with no changes. 3 Pages 1 Pages R6/GIFFORD_PINCHOT_SUPPLEMENT_6309.11-2001-1 EFFECTIVE DATE: 03/15/2001 DURATION: Effective until superseded or removed 6309.11,40 Page 2 of 3 FSH 6309.11 – CONTRACT ADMINISTRATION HANDBOOK CHAPTER 40 – CONTRACT MODIFICATIONS AND TERMINATIONS 42.1 - Steps in Contract Modification 1. All Road and Bridge, Facilities, and Trails Construction Cost Adjustments shall be forwarded using Form GP-7720-1 as a cover sheet (Exhibit 1). When the preparer/reviewer is other than the Inspector/COR, the preprinted title shall be crossed out and replaced with the appropriate title of the person preparing/reviewing the cost adjustment. 2. When forwarding a cost adjustment packet, all supporting documents including the cost estimate worksheets shall be included as a part of the total adjustment packet. R6/GIFFORD_PINCHOT_SUPPLEMENT_6309.11-2001-1 EFFECTIVE DATE: 03/15/2001 DURATION: Effective until superseded or removed 6309.11,40 Page 3 of 3 FSH 6309.11 – CONTRACT ADMINISTRATION HANDBOOK CHAPTER 40 – CONTRACT MODIFICATIONS AND TERMINATIONS EXHIBIT 1 CONSTRUCTION COST ADJUSTMENTS COVER SHEET CONTRACT NAME CONTRACT NUMBER PROJECT NAME/NUMBER CHANGE NUMBER NUMBER OF PAGES __________ __________ __________ __________ __________ __________ _________________________________ X Prepared by (Inspector) Date _________________________________ X Reviewed by (ER/COR) Date _________________________________ X Recommended by (Zone E) Date _________________________________ Reviewed by (FSR) Date -->ER/COR reviews complete packet for accuracy, including calculations -->ZONE ENGINEER will check SO-E block for review when change exceeds Zone Engineer's signing authority and for all Trails/Facilities changes. -->FSR signs for Timber Sale changes. FSR reviews for contractual correctness, insures all necessary material is included, and coordination as outlined in FSH 2409.15 has been accomplished. _________________________________ Recommended by (DR/MM) Date -->DR/MM signs for changes that affect resources. _________________________________ Recommended by (SO-E) Date _________________________________ X APPROVED BY (CO) X- Signature is required Date GP-7720-1 (1/89)