Detector Plane Checkout List Updated October 22, 2001 Plane Number:________________ Date: ___________ Shift: ____________ Workers:_________________________ _________________________ _________________________ _________________________ Scintillator and Fiber Placement 1. Read/record barcodes on scintillator modules Module 1 Module 2 Module 3 Module 4 Module 5 Module 6 Module 7 Module 8 _________________ _________________ _________________ _________________ _________________ _________________ _________________ _________________ 2. Connecting fiber cables for readout and LI system a. Clear fiber cables connected and routed. ____________ b. Light Injection fibers inserted. ____________ (Light Injection fiber transmission will be checked before bundle is installed.) c. Double check clear fiber cable and LI fiber cable connections are correct. _____________ d. Module snouts bagged in two layers of .004” “fire retardant” black plastic. _____________ Module Checkout 3. Module Transmission Testing: Beginning 10/15/01 we will be doing transmission tests only on modules that have 2 “bad” fibers already as seen in their module maps or modules that we suspect may have been damaged in handling for some reason. Module maps must be reviewed before scintillators are placed on the steel. Module transmission test results(average transmission%): Module 1 Module 2 Module 3 Module 4 Module 5 Module 6 Module 7 Module 8 transmission______ transmission______ transmission______ transmission______ transmission______ transmission______ transmission______ transmission______ sigma_______bad fiber #________ sigma_______bad fiber #________ sigma_______bad fiber #________ sigma_______bad fiber #________ sigma_______bad fiber #________ sigma_______bad fiber #________ sigma_______bad fiber #________ sigma_______bad fiber #________ 4. Light Injection Module checkout: This test is being replaced by the direct transmission testing of the LI fiber bundle. 5. Light Leak Checkout. Module Light Leak test(noise rate Hz): East___ or West___ Module 1(3.3KHz) ______ Module 2(5.2KHz) ______ Module 3(4.2KHz) ______ Module 4(4.3KHz) ______ Module 5(4.3KHz) ______ Module 6(4.3KHz) ______ Module 7(5.2KHz) ______ Module 8(3.3KHz) ______ Leak locations(record on plane map) _______________________________ _______________________________ _______________________________ _______________________________ _______________________________ _______________________________ _______________________________ _______________________________ 6. Final tie down of clear fibers in the stay clear zone before raising module.______ 7. Final visual inspection and certification that plane is ready for hanging. Vertical Tasks/Checkout 8. Uncoil clear fiber cable and route to the cattle guard. ______________ 9. Connect clear fiber cables to appropriate MUX box. ______________ ______ Steel Plate Gaps U Module Gaps V