Detector Plane Checkout List
Updated
October 22, 2001
Plane Number:________________
Date: ___________
Shift: ____________
Workers:_________________________
_________________________
_________________________
_________________________
Scintillator and Fiber Placement
1. Read/record barcodes on scintillator modules
Module 1
Module 2
Module 3
Module 4
Module 5
Module 6
Module 7
Module 8
_________________
_________________
_________________
_________________
_________________
_________________
_________________
_________________
2. Connecting fiber cables for readout and LI system
a. Clear fiber cables connected and routed.
____________
b. Light Injection fibers inserted.
____________
(Light Injection fiber transmission will be checked before bundle is
installed.)
c. Double check clear fiber cable and LI fiber cable connections are correct.
_____________
d. Module snouts bagged in two layers of .004” “fire retardant” black
plastic.
_____________
Module Checkout
3. Module Transmission Testing:
Beginning 10/15/01 we will be doing transmission tests only on modules that
have 2 “bad” fibers already as seen in their module maps or modules that we
suspect may have been damaged in handling for some reason. Module maps
must be reviewed before scintillators are placed on the steel.
Module transmission test results(average transmission%):
Module 1
Module 2
Module 3
Module 4
Module 5
Module 6
Module 7
Module 8
transmission______
transmission______
transmission______
transmission______
transmission______
transmission______
transmission______
transmission______
sigma_______bad fiber #________
sigma_______bad fiber #________
sigma_______bad fiber #________
sigma_______bad fiber #________
sigma_______bad fiber #________
sigma_______bad fiber #________
sigma_______bad fiber #________
sigma_______bad fiber #________
4. Light Injection Module checkout:
This test is being replaced by the direct transmission testing of the LI fiber
bundle.
5. Light Leak Checkout.
Module Light Leak test(noise rate Hz):
East___ or West___
Module 1(3.3KHz)
______
Module 2(5.2KHz)
______
Module 3(4.2KHz)
______
Module 4(4.3KHz)
______
Module 5(4.3KHz)
______
Module 6(4.3KHz)
______
Module 7(5.2KHz)
______
Module 8(3.3KHz)
______
Leak locations(record on plane map)
_______________________________
_______________________________
_______________________________
_______________________________
_______________________________
_______________________________
_______________________________
_______________________________
6. Final tie down of clear fibers in the stay clear zone before raising module.______
7. Final visual inspection and certification that plane is ready for hanging.
Vertical Tasks/Checkout
8. Uncoil clear fiber cable and route to the cattle guard. ______________
9. Connect clear fiber cables to appropriate MUX box.
______________
______