Construction continues for Charlotte-Mecklenburg Storm Water
Services’ Eastburn Storm Drainage Improvement Project. Work along
Fairheath Road and in the backyards of Hazelton Drive is progressing.
Work has been temporarily delayed at the Hazelton Drive location
due to utility issues and subsurface rock.
With the work zone that is present at Hazelton, the detour will
remain the same with detour signs in place. During the road closure,
local access to homes will be available but vehicular and pedestrian
access across the culvert area from one side to another will be
unavailable. Please plan on taking other neighborhood streets for
alternate access.
The City would like to thank all residents for their patience and
cooperation. For more information about this project, please
visit our website to view project updates and exhibits at: http://
stormwater.charmeck.org. Click on Storm Water Projects drop
down menu in the green bar, then Active Projects and Eastburn.
Large concrete junction box at Hazelton Drive
under construction.
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
Eastburn Project Update
HIGHLIGHTS
If you have any questions, please contact one of the following project
team members:
Project Manager:
On-site Construction Inspector:
Matthew Anderson: 704-336-7923
Monty Bissette: 704-400-7788
Email: mbissette@charlottenc.gov Email: manderson@charlottenc.gov
Construction Supervisor:
Gary Stansbury: 704-336-2667
E-mail: gstansbury@charlottenc.gov
A construction inspector is on site daily to address any questions or concerns.
Please note efforts are taken to minimize disruption to nearby properties.
Download