FLUIDS SEPTEMBER 2010 UNCONFIRMED MINUTES SEPTEMBER 8, 2010 DELTA CENTRE-VILLE 777 RUE UNIVERSITY MONTREAL, QUEBEC These minutes are not final until confirmed by the Task Group in writing or by vote at a subsequent meeting. Information herein does not constitute a communication or recommendation from the Task Group and shall not be considered as such by any agency. WEDNESDAY, SEPTEMBER 8, 2010 1.0 OPENING COMMENTS – (CLOSED) 1.1 Call to Order / Quorum Check / Introductions / Routing of Attendance / Confirmed Voting Membership The FLUIDS TASK GROUP was called to order at 9:15 a.m., 8-Sept-10 It was verified that only SUBSCRIBER MEMBERS were in attendance during the closed portion of the meeting. A quorum was established with the following representatives in attendance: Subscriber Members/Participants Present (* Indicates Voting Member) NAME COMPANY NAME * Samuel Buri The Boeing Company Vice Chairperson Ron Clements The Boeing Company Perry Freemen Boeing David Griffith Boeing Oliver Harten Airbus * Kevin Heck Lockheed Martin * Mike King Northrop Grumman Logan Kraft NAVAIR Mario Leclerc Bombardier NMC Auditor Fred Meyer Cessna * Erwin Oman Bombardier * Mark Paul Rolls-Royce Tom Ryan Boeing * Robert Schreiber The Boeing Company Chairperson * Mark Scott The Boeing Company * Dan Smith GE Aviation Tom Smoots Boeing Renatas Stanislovaitis GE Aviation Other Members/Participants Present (* Indicates Voting Member) NAME COMPANY NAME John Binford B & E Mfg. John Brittain Eaton Lee Bullock Permaswage USA Bryan Caton Parker Dan Choisser Esterline Engineered Materials * Roger Christianson Hydraflow May Danhash Permaswage / DMC 1 FLUIDS SEPTEMBER 2010 Al Wayne Samson Abiy Carlos Dale Mike Steve Joe Steve Andrew Kevin Mansoor Nilesh Mike James Mark Dave Joseph Tim Dick Hans Philip Mark Devile DeWatt D’Mekuria Eshetu Garfias Gordon Howlett Hudlet Klamar MacDonald Mau Metcalf Motavvef Patel Paveglio Robellnrd Scatoloni Sherwood Stanek Storm Tomsic Vandervelden Wade Wilson Shur-Lok Pamco PFW Aero STS Laconia Nelson Aerospace Aerofit Inc. Airdrome Jetseal NUCO Permaswage Parker Nelson Aerospace Esterline TA Aerospace Shur-Lok STS Laconia Plymouth Tube Co. Faber Emprises Inc. Eaton Aerospace Wyman Gordon NUCO Voss SAE STS Laconia Alcoa Fastening Systems PRI Staff Present Keith Ken Purnell Lefebvre Staff Engineer Nadcap Auditor Nadcap Code of Ethics – (CLOSED / OPEN) The Antitrust and Nadcap Personal Code of Ethics and Conflict of Interest were reviewed with the Task Group. 1.2 Approval of Previous Meeting Minutes / RAIL Review – (OPEN) The minutes from the 8-Mar-10 Fluids Distribution Systems Task Group meeting were reviewed and approved as written. 2.0 17025 Laboratory Accreditations (CLOSED / OPEN) PRI has made a decision to discontinue affiliation as a NACLA accreditation body because of requirements of ISO/IEC17011 that require PRI business structure to be set up in a specific manner. Resolving this issue would have required PRI to change the way in which it conducts business while not enhancing any of the services that PRI provides nor is it a quality improvement. Thus, PRI will no longer issue ISO/IEC 17025 certificates. PRI will continue to perform audits to the requirements of AC7006 which is equivalent to ISO/IEC 17025 and will provide certification within the Nadcap scope. These audits will continue to be recognized by the MTL Task Group as an approved Quality System. There was discussion with the SAE G3, PRI QPG and Nadcap Fluid Distribution Systems Chairpersons concerning the amount of work required to revise the applicable SAE G3 standards that specify ISO 17025 to also accept AC7006. It was determined that only three Fluids accredited suppliers were impacted by this change and it would be easier for those suppliers to obtain an ISO 17025 accreditation when their AC7006 accreditation expires than to revise the numerous SAE G3 2 FLUIDS SEPTEMBER 2010 standards that reference ISO 17025. Also taken into consideration was that some subscribers flow down ISO 17025. 3.0 STAFF ENGINEER DELEGATION OVERSIGHT (CLOSED) The Task Group reviewed the Fluids Distribution Systems Delegation Tracking Form for K. Purnell. Staff Engineer met the minimum criteria of having at least 10% of findings reviewed by the Task Group Primes with at least a 90% concurrence rate. Staff Engineer maintains delegated status. 4.0 AUDITOR TRAINING OUTLINE FOR 2010 - AUDIT OBSERVERS– (CLOSED) Auditor Training has been scheduled for the Nadcap meeting in Pittsburgh for one half day on Friday October 15th. Topics to be addresses included, Time Management, Most Common NCR’s, Review of Latest Document Changes, Question / Answer and Discussion Session, Suggestions for Audit Handbook Clarifications and Periodic Testing Requirements. In addition, Staff Engineer will make a presentation at Nadcap Management Council to make Nadcap members aware of the Task Groups functions and responsibilities. Nadcap Fluid Task Group subscriber members have observed two Fluids audits in 2010. ACTION ITEM: Staff Engineer K. Purnell to present a Fluids Task Group Summary Report at the NMC Meeting in Pittsburgh PA. (DUE DATE: 20-Oct-10). 5.0 PERIODIC TESTING REQUIREMENTS FOR SUB-CONTRACTORS – (CLOSED) The Task Group Members discussed periodic testing requirements and how they apply to suppliers that have multiple sub-contractors. 6.0 OPENING COMMENTS – (OPEN) Call to Order / Quorum Check / Introductions / Routing of Attendance / Confirmed Voting Membership. Roster was circulated for all in attendance to sign. The Antitrust and Nadcap Personal Code of Ethics and Conflict of Interest were reviewed with the Task Group. 7.0 REVIEW AND APPROVAL OF 8-MAR-10 MEETING MINUTES – (OPEN) The minutes from the 8-Mar-10 Fluids Distribution Systems Task Group meeting were reviewed and approved as written. All of the RAIL open action items were reviewed. 8.0 PRI STAFF REPORT – (OPEN) K. Purnell presented the PRI Staff Report that included Auditor Status, Task Group Metrics, Most Common NCR’s, Auditor Training Topics, Scope of Accreditation, Future Nadcap Meeting Dates and Locations. (Attached) PRI Staff Report Fluids Sept 8 2010 9.0 STATUS OF AC7123 & AC7112/3 – (OPEN) AC7123 & AC7112/3 were balloted to Nadcap Management Council and the ballots were closed without comments. Checklists will be posted in eAuditNet by 24 Sept 2010. Audits can be conducted 90 days after the posting date in eAuditNet. ACTION ITEM: Staff Engineer to release and post AC7112/3 in eAuditNet. (DUE DATE: 23-Sept-10) 3 FLUIDS SEPTEMBER 2010 ACTION ITEM: Staff Engineer to release and post AC7123 in eAuditNet. (DUE DATE: 23-Sept-10) ACTION ITEM: Staff Engineer to incorporate Audit Handbook clarifications into AC7112/6 to create a single document then ballot to the Task Group. (DUE DATE: 16-Nov-11). 10.0 PERIODIC TEST REQUIREMNTS FOR SUBCONTRACTORS Mark Scott QPG Chairperson Reviewed the QPG’s expectations for periodic testing. Periodic data is required to be submitted to PRI using the PRI provided spreadsheet. Suppliers are to track part counts for machine shops they subcontract part to that are subject to periodic testing. Periodic tests should include parts from these subcontractors. There were questions on how the parts are to be counted and this was referred to the G3B committee for clarification. M. Scott agreed to begin the next revision of PD2101 to incorporate the revised sub tier auditing requirements previously agreed upon. 11.0 SUPPLIER MEETING REPORT OUT – (OPEN) Suppliers presented a summary of their morning discussion that included: Periodic Control Testing – AS18280 Requirements/Clarifications Sub-Contracting Requirements Proposed Change to PD2101/AC7112 Gauging Requirements for Nadcap Accredited Processors (See Attached Minutes) Minutes - SAE G3 PRI-Suppliers Group Montreal Sept 8 2010 ACTION ITEM: M. Scataloni to provide a copy of the Supplier Meeting Minutes to the Staff Engineer so they can be incorporated in the Nadcap Task Groups Meeting Minutes. (DUE DATE: 20-Sept-10) 12.0 NEW BUSINESS – (OPEN) M Scott QPG Chairperson reviewed the QPG 4 square chart. A qualification matrix was created by the QPG and members were encouraged to modify the matrix to address requirements of other specifications. To obtain a copy of the Qualification Matrix contact Deb Adrian at PRI. (G3-QPG Report attached) G-3 QPG RPT draft ADJOURNMENT – 8-Sept-10 – Meeting was adjourned at 12:00 p.m. Minutes Prepared by: Keith Purnell kpurnell@sae.org 4 FLUIDS SEPTEMBER 2010 ***** For PRI Staff use only: ****** Are procedural/form changes required based on changes/actions approved during this meeting? (select one) YES* NO *If yes, the following information is required: Documents requiring revision: Who is responsible: AC7112/6 K. Purnell Due date: 16-Nov-2011 5