FLUID DISTRIBUTION SYSTEMS SEPTEMBER 2012 CONFIRMED MINUTES CONFIRMED MINUTES 19 SEPTEMBER, 2012 HILTON BREMEN HOTEL BOETTCHERSTRASSE 2, 28195 BREMEN, GERMANY These minutes are not final until confirmed by the Task Group in writing or by vote at a subsequent meeting. Information herein does not constitute a communication or recommendation from the Task Group and shall not be considered as such by any agency. WEDENSDAY 19 SEPTEMBER, 2012 1.0 OPENING COMMENTS / INTRODUCTIONS – CLOSED 1.1 Call to Order / Quorum Check The Fluid Distribution Systems Task Group (FLU TG) was called to order at 8:45 a.m., 19-SEPT12. It was verified that only Subscriber Members were in attendance during the closed portion of the meeting. A quorum was not established, the following representatives were in attendance: Subscriber Members/Participants Present (* Indicates Voting Member) NAME * * Shweta Keith Ronald Robert Peer-Loran Ulrich Robert COMPANY NAME Aggarwal Allen Clements Hainline Milling Muller Schreiber Rolls Royce PLC Rolls Royce The Boeing Company The Boeing Company Airbus Airbus The Boeing Company Other Members/Participants Present (* Indicates Voting Member) NAME COMPANY NAME Robert John Owe Ken Roger Gary Jeff May Cynthia David Briley Brittain Carlsson Chang Christianson Contreras Daedler Danhash Eulitz Galopin Incotec Corp. Eaton Aeroquip Alcoa Fastening Systems Adel Wiggins Group Hydraflow Incotec Corp Alcoa Fastening Systems Permaswage - USA B/E Aerospace Titeflex Ted Goosen Parker Hannifin Corp. Heinrich Hackmann Cassidian 1 Chairperson Proxy for M. King, T. Chin, M. Scott, E. Oman FLUID DISTRIBUTION SYSTEMS SEPTEMBER 2012 CONFIRMED MINUTES * * Beng Steve Andrew Mike Leo Nilesh Mike Mark Helmut Lee MacDonald Mau Paveglio Perez Patel Rose Scatoloni Schreck Dennis Stinson Hans Phillip Vandervelden Wade Adel Wiggins Permaswage Parker Aerospace Titeflex Allan Aircraft Shur-Lok Aflex Hose Ltd. Faber Enterprises Inc. Orkal Ind. Rep. Germany Adel Wiggins Stinson Aerospace / National Utilities SAE International Smiths Tubular Systems – Laconia dba Titflex PRI Staff Present Keeley John Ken Keith Andrews Clatworthy Lefebvre Purnell SAE International SAE International PRI Auditor PRI Staff The Antitrust and Nadcap Personal Code of Ethics and Conflict of Interest were reviewed with the Task Group in the Closed and Open meetings. The voting membership was reviewed and proxy votes were recorded. Keith Allen of Rolls Royce requested to become a Fluids Alternate Subscriber Voting Member. K. Allen has attended four previous FLU Task Group meetings. ACTION ITEM: K. Purnell to add a vote for K. Allen to become an Alternate Voting member to the next FLU TG conference call. (Due Date: 30-Jan-13) 2.0 AUDITS & AUDITORS– CLOSED 2.1 Review Scheduled and Conducted Audits The FLU TG audit schedule for the next 6 months was reviewed and Subscribers were encouraged to observe audits. To observe an audit please contact Linda Novak (lindab@sae.org) in the Nadcap audit scheduling department. There were no issues to discuss with audits currently in staff, supplier or task group review. 2.2 Discuss Problem Audits No problem audits to discuss. 2.3 Data Analysis Review – Overall Auditor Performance FLU TG reviewed the following data to evaluate auditor consistency: Checklist paragraphs auditors are writing NCR’s against Checklist paragraphs traceable to the auditor writing the NCR Average number of major, minor and NCRs per day by Auditor This Information will be reviewed during the 2012 Nadcap FLU TG auditor conference. 2.4 Auditor Conference – Confidential Topics 2 FLUID DISTRIBUTION SYSTEMS SEPTEMBER 2012 CONFIRMED MINUTES No confidential topics were discussed. 3.0 STAFF ENGINEER DELEGATION OVERSIGHT – CLOSED The FLU TG reviewed the Delegation Tracking Form for K. Purnell. Staff Engineer K. Purnell met the minimum criteria of having at least 10% of findings reviewed by the Task Group Subscribers with at least a 90% concurrence rate. Staff Engineer maintains delegated status. Staff Engineer noted the number of Subscribers performing audit review for delegation oversight needs to increase. Three different Subscriber votes are required for quorum. 4.0 SUPPLIER CHANGE NOTIFICATION - CLOSED Since March 2012 six t-frm-11s have been submitted. The Task Group reviewed the submitted changes and no actions were required. 5.0 CLOSED MEETING ISSUES - CLOSED Meeting attendance was discussed and the next overseas meeting should be in the spring when travel restrictions are less likely. Staff Engineer reviewed the Nadcap QML Process Overview presentation that will be presented during the open meeting. Staff Engineer noted there appears to be confusion as to when the periodic test results are due to PRI. PD2001 does not include an actual submittal due date. Current process is eAuditNet sends an automated e-mail to the suppliers with a periodic test submittal due date. Auditors are not copied on this e-mail and if there is a change in supplier contacts the e-mail could be going to a dead mailbox or to the wrong person. Staff Engineer suggested adding the due date to PD2101. ACTION ITEM: K. Purnell to forward suggestion to the G3 QPG Chairperson M. Scott to include actual due date in PD2101 for periodic test result due to PRI. (Due Date: 18-Oct-12) 6.0 MEETING CLOSE OUT - CLOSED Action items were reviewed and due dates established. For specific details, please see the current FLU Rolling Action Item List posted at www.eAuditNet.com, under Public Documents. 7.0 REVIEW AGENDA - OPEN The agenda for the meeting was reviewed. Attendees were given the opportunity to identify expectations to be addressed during the week of meetings. 8.0 REVIEW AND ACCEPT PREVIOUS MEETING MINUTES The FLU meeting minutes from the March 2012 Nadcap meeting were reviewed. A quorum was not established so the minutes were not approved. Minutes will be approved during the next FLU TG conference call. ACTION ITEM: K. Purnell to add approval of March 2012 meeting minutes to next FLU TG conference call or meeting. (Due Date: 30-FEB-13). 9.0 MEMBERSHIPS STATUS- OPEN The voting records and meeting attendance for FLU TG Voting Members, Subscriber and Supplier, were reviewed for compliance to the requirements for maintaining membership. The requirements state that to maintain membership, a member must not be absent without approved alternate representation from three consecutive regular Nadcap Task Group meetings and the member, or approved alternate representation, shall not miss a vote on 2 consecutive letter ballots. The Task 3 FLUID DISTRIBUTION SYSTEMS SEPTEMBER 2012 CONFIRMED MINUTES Group Chairperson is allowed to waive these requirements if other circumstances warrant retention. All Supplier and Subscriber voting members have met the requirements for meeting attendance. All Suppler and Subscriber voting members have met the voting on letter ballot requirements. The Task Group Chairperson reviewed the meeting and ballot participation forms and approved all voting member to retain their voting privileges. 10.0 G3 – QPG AND Nadcap QML OVERVIEW R. Schreiber the Nadcap FLU Chairperson presented the G3 QPG Qualified Products List (QPL) overview (Attached). Topics addressed included: History of the PRI QPL Program Purpose of the Aerospace QPL Program Industry Managed QPL Structure Role of PRI, Qualified Products Management Council (QPMC) & Qualified Product Group (QPG) QPL Approval Process QPL Overview.ppt K. Purnell the Nadcap FLU Staff Engineer presented the Nadcap Qualified Manufacturers List (QML) process overview (Attached). Topics addressed included: Nadcap eAuditNet Process Flowchart Nadcap Operational Procedures FLU Task Group Responsibilities FLU Task Group Audit Checklists Available Training Fluids Task Group Tutorial - Sept 2012.pptx 11.0 STAFF REPORT – OPEN Staff Engineer, K. Purnell, presented the PRI Staff Report that included: Auditor Status, FLU TG Metrics, Most Common NCR’s, Latest Changes, NMC Checklist Vision / NOP-002 Compliance, Auditor Conference, Staff Delegation Metrics, Future Nadcap Meeting Dates and Locations. PRI Staff Report Fluids Sept 2012.ppt 12.0 G3 – QPG STATUS REPORT R. Schreiber the Nadcap FLU Chairperson presented the G3 QPG Status Report of the latest projects and changes the PRI G3 QPG is working on (Attached). Topics of particular interest were: Implementation of 6 month Supplier Advisory Closure Requirement eAuditNet QPG Balloting Tool 4 FLUID DISTRIBUTION SYSTEMS SEPTEMBER 2012 CONFIRMED MINUTES Standards Containing Activation Notice Leakage Panel Data from 2012 Periodic Testing Summary of Fittings G-3 QPG Status Report - 2012sep W.pptx 13.0 SUPPLIER MEETING REPORT – OPEN M. Scatoloni reported on the topics discussed during the SAE G-3 PRI-Supplier Group meeting. Topics included: Leakage Panel – No leakage information was reported by the PRI G3 FLU QPG or by the OEM/Users. PRI QPL Coverage for Partial Product Listings – Action has been initiated by PRI to incorporate notes into the QPL page in eAuditNet to communicate user responsibilities for nonlisted QPL products. PD2101 – Fire Testing in Periodic Control Tests for Hose. Since hose assembly procurement specifications are being revised to include periodic / recurring fire testing, (AS1339, etc.), PD2101 needs to be updated to define the reporting requirements on an annual basis. PD2101 requirement to perform yearly audits of subcontracted machining of threads and sealing surfaces was discussed. ACTION ITEM: K. Purnell to forward question to G3 QPG Chairperson M. Scott - which type of leak test is best for detecting sealing surface leaks? It was suggested that pneumatic tests would be better. (Due Date: 18-Oct-12) ACTION ITEM: K. Purnell to forward request to G3 QPG Chairperson M. Scott for a sub tiers merit program similar to the Nadcap QML merit program. (Due Date: 18-Oct-12) 14.0 GLOBALIZATION – OPEN The purpose of SAE G3, PRI G3-QPG and Nadcap FLU TG meeting overseas is to address the needs of as many people as possible. The Nadcap FLU TG audit checklists were developed based upon SAE Aerospace Standard requirements. Attached is a report that identifies other industry standards that should be considered when developing audit checklists. PRI will work to revise the audit checklist questions wording so they verify customer requirements beyond the AS specifications. It was suggested that the SAE Standard Style Guide be modified to include standard wording on the front page when a QML or QPL requirement is identified. P. Wade volunteered to create a list of G3 standards that have and do not have PRI QPL requirements. Document Globalization.pptx ACTION ITEM: J. Clatworthy and K. Rohall Modify SAE Standard Style Guide to include standard wording on front page when a QML or QPL requirement is included. (Due Date: 1-Oct-13) ACTION ITEM: P. Wade to provide a list of SAE G3 standards that contain QPL requirements and that do not contain QPL requirements to M. Scott and K. Purnell (Due Date: 1-Feb-13) 15.0 FIRST ARTICLE INSPECTION – OPEN Is a first article inspection report required for subcontracted machining of threads and sealing surfaces? 5 FLUID DISTRIBUTION SYSTEMS SEPTEMBER 2012 CONFIRMED MINUTES AS9120 - Aerospace First Article Inspection Requirement - The purpose of the First Article Inspection is to give objective evidence that all engineering, design and specification requirements are correctly understood, accounted for, verified, and recorded. AS9100 paragraph 7.5.1.1 Production Process Verification The organization shall use a representative item from the first production run of a new part or assembly to verify that the production processes, production documentation and tooling are capable of producing parts and assemblies that meet requirements. This process shall be repeated when changes occur that invalidate the original results (e.g., engineering changes, manufacturing process changes, tooling changes). 7.5.2 Validation of Processes for Production and Service Provision The organization shall validate any processes for production and service provision where the resulting output cannot be verified by subsequent monitoring or measurement and, as a consequence, deficiencies become apparent only after the product is in use or the service has been delivered. Based upon the above requirements suppliers are required to have on file first article inspection reports for subcontracted machining of threads and sealing surfaces? 16.0 AUDITOR CONFERENCE – OPEN FLU Specific Auditor Conference will be on Friday 19-OCT-12 from 8:00 am – 5:00 pm and on Saturday from 1:00 pm – 5:00 pm. Topics of discussion will include: Review of Initial Auditor Training Program Audit Skills NCR Writing Most Common NCRs & NCR Data Analysis for Consistency Review of Latest Checklist Changes Periodic Testing Requirements Dry Film Lube AC7108/1 Question and Answer Session 17.0 NEW BUSINESS – OPEN Nadcap FLU TG has a signed Memorandum of Understanding (MOU) with Chemical Processing (CP) for the use of their AC7108/1 checklist. FLU TG Auditors will be able to perform AC7108/1 audits for AC7112 suppliers that apply Dry Film Lube. Future actions required are the revision of AC6450 to require AC7108/1 accreditation for dry film lube application. K. Purnell to add questions to AC7112/2, /3 and /4 checklists specific to flow down requirements for subcontracted dry film lube application. ACTION ITEM: K. Purnell to revise AC7112/2, /3 & /4 to include most recent dry film lube flow down questions (Due Date: 30-Dec-12) 18.0 ACTION ITEM REVIEW – OPEN Action Items were reviewed and will be posted on the FLU TG RAIL in www.eAuditNet.com, under Public Documents. 6 FLUID DISTRIBUTION SYSTEMS SEPTEMBER 2012 CONFIRMED MINUTES ADJOURNMENT – 19-Sept-12 – Meeting was adjourned at 11:30 p.m. Minutes Prepared by: Keith Purnell, kpurnell@sae.org ***** For PRI Staff use only: ****** Are procedural/form changes required based on changes/actions approved during this meeting? (select one) YES* NO *If yes, the following information is required: Documents requiring revision: Who is responsible: 7 Due date: