HALF YEARLY COMPLIANCE REPORT OF THE STIPULATED ENVIRONMENTAL
CONDITIONS/SAFEGUARD IN THE ENVIRONMENTAL CLEARENCE
Ref. letter No. SEIAA/HR/2013/133 DATED 28.05.13
COMMERCIAL PROJECT “DUDHMOTISAGAR DAIRY” located at plot no. 17,
Distt. Rewari, Dharuhera, Haryana
Sl. No.
Conditions
Status of Compliance
PART A - SPECIFIC CONDITIONS: Construction Phase:I.
Consent to Establish Shall be obtained from Agreed. Consent to Establish has been granted
Haryana State Pollution Control Board under vide letter no. HSPCB/TAC/2013/1176 dated
Air and Water Act and a copy shall be 27/06/13. A copy of the same is enclosed as
submitted to the SEIAA, Haryana before start
Annexure I.
of any construction work at site.
II
A first aid room as proposed in the project Agreed. A well Medicated First Aid room
shall be provided during construction and provisionally is being provided during construction
operational phase of the project.
phase and will also be provided during operation
phase.
III
Adequate
drinking
water
and
sanitary Agreed. Mostly local laborers are being hired
facilities should be provided for construction for construction phase and thus a negligible
workers at the site. Provision should be made quantity of wastes is being generated.
for mobile toilets. Open defecation by the
Inorganic waste is being generated which is
laborers strictly prohibited. The safe disposal
of waste water and solid wastes generated
during the construction phase should be
segregated and recyclable waste is sold off to
government approved vendors. Community
toilets have been provided nonetheless and the
ensured.
waste water generated is sent to septic tanks.
Solid waste generated during construction
phase is being managed properly. Adequate
facility of safe drinking water has been
provided on the site. Safety, health and
sanitary undertaking is enclosed as Annexure
II.
IV
All the topsoil excavated during construction Agreed. Excavated soil is being used in filling and
activities should be stored for use in leveling of floors and rest is being stored for
1
horticulture/ landscape development within horticulture/ landscape development within the
the project site.
V
project site.
The project proponent shall ensure that the Agreed. Disposal of muck including excavated
building material required during construction material in construction phase is not creating any
phase is properly stored within the project adverse impact on the neighboring communities
area and disposal of construction waste is and it is being disposed to nearby approved solid
properly stored should not create any adverse waste sites.
effect on the neighboring communities and
should be disposed of after taking necessary
precautions for general safety and health
aspects of people, only in approved sites with
the approval of competent authority.
VI
Construction spoils, including bituminous Agreed. During construction, hazardous materials
material and other hazardous materials, must are not being used and are not allowed to
not be allowed to contaminate watercourses contaminate watercourses. All muck disposals are
and the dump sites for such material must be taking place at proper dumping sites preventing any
secured so that they should not leach into the spoilage to water quality. Waste lubricating oil
ground water and any hazardous waste generated from maintenance of DG sets fall under
generated during construction phase should be hazardous waste category. Such wastes are being
disposed off with the help of companies with due
approval from Haryana State Pollution Control
Board.
VII
The diesel generator sets to be used during Agreed. As per serial no. 94 of Schedule I of
construction phase should be low sulphur Environment
diesel
type
and
should
conform
(Protection)
Rules,
1986
that
to prescribes noise limit, applicability and other
Environment (Protection) Rules prescribed requirements for new diesel generator sets (up to
for air and noise emission standards.
1000 KVA) manufactured on or after 1st January,
the Diesel generator sets to be used during
construction phase are running with high speed
diesel HSD that contains low sulphur taking all
necessary precautions into consideration.
VIII
The diesel required for operating DG sets
Agreed. Used oil from DG sets is being stored in
shall be stored in underground tanks and if HDPE drums in isolated covered facility. Suitable
2
required, clearance from Chief Controller of care is being taken to avoid spills/leakage.
Explosives shall be taken.
IX
Ambient noise levels should conform to Agreed. Ambient air and noise quality are being
commercial standards both during day and closely monitored. Test reports are enclosed as
night. Incremental pollution loads on the Annexure III.
ambient air and noise quality should be
closely monitored during construction phase.
Adequate measures should be made to reduce
ambient
air
and
noise
level
during
construction phase, so as to conform to the
stipulated standards.
X
Fly ash should be used as building material in Agreed. Fly ash is being used in construction phase
the construction as per the provisions of Fly as per the provisions of fly ash notification of
Ash Notification of September, 1999 and 14.09.1999 and as amended on 27.08.2003.
amended as on 27th August, 2003.
XI
Storm water control and its re-use as per Agreed. Storm water control and its reuse (for
CGWB and BIS standards for various various applications) plan has been prepared as per
applications.
BIS standards submitted to Central Ground Water
Board (CGWB). Rain Water Harvesting plan for
the operation phase is attached as Annexure IV.
XI
Water demand during construction should be Agreed. Water demand during construction is
reduced by use of premixed concrete, curing being reduced by the practice of using premixed
agents and other best practices referred.
concrete, curing agents and other best practices.
Use of ready mix concrete mix also avoids
preparation of concrete mix practices and hence
results in water as well as energy saving.
XII
Ready mixed concrete must be used in Agreed. Ready mixed concrete is being used in
building construction.
building construction that is cost effective as well
as environment friendly.
XIII
Roof should meet prescriptive requirement as Agreed.
Roof
shall
meet
the
prescriptive
per Energy Conservation Building Code by requirement as per energy conservation building
using appropriate thermal insulation material code by using appropriate thermal insulation
to fulfill requirement.
material to fulfill requirement.
3
XIV
Opaque
wall
should
meet
prescriptive Agreed. Opaque wall will meet prescribed
requirement as per Energy Conservation requirement as per Energy Conservation Building
Building Code which is proposed to be Code (ECBC), which is mandatory for all airmandatory for all air conditioned spaces while conditioned spaces. Vertical fenestration complied
it is inspirational for non-air-conditioned with the maximum area weighted U-factor as per
spaces
by
use
of
appropriate
thermal Energy Conservation Building Code which is
insulation material to fulfill requirement.
XV
mandatory for all air-conditioned spaces.
The approval of the competent authority shall Agreed. The approval of competent authority will
be obtained for structural safety of the be taken for structural safety of the building due to
building due to earthquake, adequacy of fire earthquake, adequacy of fire fighting equipments
fighting equipments, etc. If any forestland is etc. as per National Building Code including
involved in the proposed site, clearance under protection measures from lightening etc. The
Forest Conservation Act shall be taken from project site comes under HSIIDC land.
the competent Authority.
XVI
The project proponent shall setup 9 rainwater Agreed. 9 rain water harvesting pits have been
harvesting pits for recharge the Ground water
provided to recharge the ground water within
within the project premises.
project premises. Rain water harvesting Plan is
attached as Annexure IV.
XVII
The project proponent shall submit assurance Agreed. The assurance from DHBVN for power
from the DHBVN for supply of 2826.76 KVA supply has been attached as Annexure V.
of
power
supply
before
the
start
of
construction. In no case project will be
operational solely on generators without any
power supply from any external power utility.
XVIII
Detailed calculation of power load and Agreed. Detailed calculation of power load and
ultimate power of the project shall be ultimate power of the project was submitted and is
submitted to DHBVN under intimation to attached herein as Annexure VI.
SEIAA
Haryana
before
the
start
of
construction provisions shall be made for
electrical infrastructure in licensed area.
XIX
The project proponent shall obtain NOC from Agreed. The NOC for fire was taken before the
nearest fire station before the start of
start of construction and is attached as Annexure
construction.
VII.
4
XX
The project proponent shall not raise any Agreed. The plot is an industrial plot allotted in the
construction
in
the
natural
land HSIIDC land and thus there is no construction
depression/Nallah/water course and shall raised in the natural land depression/Nallah/water
ensure that natural flow from the Nallah course and it is ensured that no watercourse is
/water course is not obstructed.
XXI
obstructed.
The project proponent shall keep the plinth Agreed. To avoid flooding, the plinth level of the
level of the building block sufficiently above building block is kept sufficiently above the level
the level of the approach road to the industrial of the approach road as per the specifications.
project as prescribed by laws levels of the
other areas in the industrial projects shall also
keep suitably so as to avoid flooding.
XXII
The project proponent shall not cut any Agreed. The project did not involve any
existing tree and project landscaping plan cutting of existing trees as mostly it was a
should be modified to include those tress in vacant land. Moreover green area is being
green areas.
developed with tree plantation.
XXIII
The project proponent shall ensure that ECBC Agreed. ECBC norms for composite climate
norms for composite climate zone are met. In
zone are being met.
particular building envelope HVAC service
water
heating,
pumping,
lighting
and
electrical infrastructure must meet ECBC
norms.
XXIV
The project proponent shall provide 3 meter Agreed. During construction 3 meter high
high barricade around the project area, dust barricade around the project area is being provided.
screen for every floor above the ground, Dust screen, proper sprinkling and covering of
proper sprinkling and covering of stored stored material are also being provided.
material to restrict dust and air pollution
during construction.
XXV
The project proponent shall construct a Agreed. A sedimentation basin is being
sedimentation basin in the lower level of the constructed in the lower level of the project
project site to trap pollutant and other waste site to trap pollutant and other waste during
during rains.
XXVI
rains.
The project proponent shall meet the fresh Agreed. The fresh water requirement of 1200
water requirement of 1200 KLD from HUDA.
5
KLD is being met from HUDA augmented with
If not possible then project proponent can existing bore wells ; proper EDC and IDC
abstract ground water to the extent from the charges will be paid to the competent authority
existing bore wells only after seeking prior for the HUDA supply.
permission from the CGWA before the start
of
the
construction.
However
project
proponent shall ensure water supply from
HUDA whenever the proposed Canal based
water works of HUDA is ready and submits
assurance
of
HUDA
before
start
of
construction.
XXVII
The project proponent shall get the study of Agreed. The groundwater table/ level are
ground water table/level and quality of being taken care of and CGWA norms are
ground water every 2 years seeking fresh being conformed to.
permission from CGWA for further extraction
of ground water. It is further clarified that
CGWA in above two conditions does not
mean permission from DC Rewari.
PART A - SPECIFIC CONDITIONS: Operational Phase:-
a. Consent to operate shall be obtained from Agreed. The Consent to operate will be
Haryana State Pollution Control Board under obtained from Haryana State Pollution Control
Air and water Act and a copy shall be Board under Air and water Act and a copy will
submitted to the SEIAA, Haryana.
be submitted to the SEIAA, Haryana.
b. The STP shall be installed for the treatment of the
sewage generated to the prescribed standards
including odor and treated effluent will be
recycled
to
achieve
zero
discharge.
The
installation of STP should be certified by and
independent expert and a report in this regard
should be submitted to the SEIAA, Haryana
before the project is commissioned for operation.
Tertiary treatment of waste water is mandatory.
Discharge of treated sewage shall conform to the
norms and standards of HSPCB, Panchkula.
6
Agreed. STP of 100 KLD capacity will be installed
to treat domestic waste water up to tertiary level
during operation phase. Efforts will be made to
achieve standards including odor. Waste water will
be recycled, to the maximum possible extent to
achieve zero discharge of waste water outside
project premises. It is estimated that the project
during operational phase can generate nearly 80
KLD of waste water. The treated water will be
recycled and reused thus leading to zero exit
discharge.
c. The effluent treatment plant of 2000 KLD Agreed. This is an industrial project so effluent
capacity shall be installed for treatment of will also be generating from the project. To treat
industrial effluent. The project shall ensure that this effluent an ETP of 2,000 KLD will be installed
the waste water generation as well as values of in the operational phase. It is estimated that the
different parameters of effluent should conform project during operational phase could generate
to the standards as prescribed for dairy industry, nearly 900 KLD of industrial waste water. The RO
at Sr. no. 56 of industry specific standard in refuse/Hazardous waste generated from the site
schedule-I under a rule 3 of Environment will be disposed off as per Hazardous waste
Protection Rules, 1986. The project proponent (management and handling) rules. The effluent/
shall dispose of RO refuse/Hazardous waste RO refuse will not be discharged in the public
generated from the site as per Hazardous waste sewer/drain.
(management and handling) rules. The project
proponent shall not discharge the effluent/ RO
refuse in the public sewer/drain.
d. Separation of the gray and black water should be Agreed. Separation of the grey and black water
done by the use of dual plumbing line. Treatment will be done by the use of dual plumbing line.
of 100 % gray water by decentralized treatment Treatment of 100% grey water by decentralized
should be done ensuring that the recirculated treatment will be done ensuring that the rewater should have BOD level less than 10 ppm circulated water will have BOD maximum up to 10
and the recycled water will be used for flushing,
ppm and the recycled water will be used for
gardening and DG set cooling etc. to achieve zero flushing, gardening, DG set cooling etc. to achieve
exit discharge.
zero exit discharge.
e. For disinfections of the treated waste water ultra Agreed. For disinfection provision for ultra violet
violet radiation or Ozonization should be used.
radiation or Ozonization is kept.
f. The solid waste generated should be properly Agreed. During operational phase the solid waste
collected and segregated. Bio-degradable waste will be collected & segregated as per the MSW
shall be decomposed at site and dry/ insert solid Rules,
2000. Bio-degradable
waste
will
be
waste should be disposed off to be approved sites decomposed at site and dry/ insert solid waste will
for land filling after recovering recyclable be disposed off to approved sites for land filling.
material.
g. Diesel power generating sets proposed as source Agreed. The proposed D.G sets will be used as
of backup power for lifts, common area back up for lifts, common area illumination and
7
illumination and for domestic use should be of domestic use. These D.G sets will be placed in
enclosed type and conform to rules made under acoustic enclosures to minimize the noise pollution
the Environment (Protection) Act, 1986. The as per serial no. 94 of Schedule I of Environment
location of the DG sets should be in the basement (Protection) Rules, 1986 that prescribes noise limit,
as promised by the project proponent and applicability and other requirements for new diesel
appropriate stack height as per the CPCB norms. generator sets (up to 1000 KVA). Manufactured on
The diesel used for DG sets should be of low or after 1st January 2005. D.G sets will be fitted
sulphur contents (Maximum 0.25%).
with acoustic enclosures so that the maximum
permissible sound pressure level is within 75 dB
(A) at 1 meter from the enclosure surface. The D.G
sets shall be running on low sulphur diesel during
operational phase.
h. Ambient noise level should be controlled to Agreed. Ambient noise level will be controlled
ensure that it does not exceed the prescribed within and at the boundaries of the project ensuring
standards both within and at the boundary of the compliance to regulatory norms that is in
proposed project.
accordance to Schedule-III of The Noise Pollution
(Regulation and Control) Rules, 2000. This will be
attained through:
1)
Development and maintenance of at least
20% of the total land area for tree plantation all
around the project.
2)
Providing acoustic enclosures to DG sets.
3)
Better traffic management.
4)
Regular surveillance monitoring.
i. The project proponent should maintain at least Total green area planned to be 9,739.20 m2 (30 %
30% as green cover for tree plantation especially of the Net plot area). Landscape plan showing the
all round the periphery of the project and on the green area is attached as Annexure VIII.
road sides preferably with local species so as to
provide protection against particulates and noise.
The open spaces inside the plot should be
preferably
landscaped
and
covered
with
vegetation/ grass, herbs & shrubs. Only The
Project Proponent shall provide green cover to the
paved area.
8
j. The project proponent shall strive to minimize Agreed. It will be strived to minimize water
water in irrigation of landscape by minimizing usage in irrigation by practicing various
grass area, using native variety, xeriscaping, and scientific methods and using the latest
mulching, utilizing efficient irrigation system,
available technologies.
scheduling irrigation only after checking evapotranspiration data.
k. Rain water harvesting for roof run-off and surface Agreed. Rainwater harvesting will be followed
run-off, as per plan submitted should be and pre-treatment as desilting and oil and
implemented. Before recharging the surface run grease chamber will be provided. The bore
off, pre- treatment through desilting and oil &
grease chamber must be insured to remove
well for rainwater recharging will be kept at
least 5 m above the highest groundwater table.
suspended matter, oil and grease. The bore well
for rainwater recharging should be kept at least 5
mts. above the highest ground water table.
l. The ground water level and its quality should be Agreed. The ground water level and its quality
monitored regularly in consultation with Central have been monitored regularly in consultation with
Ground Water Authority.
Central Ground Water Authority.
m. There should be no traffic congestion near the Agreed. Fully internalized parking has been
entry and exit points of the roads adjoining the provided and no public place is being used.
proposed project site. Parking should be fully Docking yard has been designed for the project.
internalized and no public space should be used.
The parking plan is attached as Annexure IX.
n. A report on the energy conservation measures Agreed. A report on the energy conservation
conforming
to
energy
conservation
norms measures conforming to energy conservation norms
finalized by Bureau of Energy Efficiency should finalized by Bureau of Energy Efficiency has been
be prepared incorporating details about building prepared incorporating details about building
materials & technology, R & U Factors etc and materials & technology, R & U Factors etc and
submitted to the SEIAA, Haryana in three months submitted to the SEIAA, Haryana in three months
time.
time. It is attached as Annexure X.
o. Energy conservation measures like installation of Agreed. Installation of CFLs/TFLs for lighting the
CFLs/TFLs for lighting the areas outside the areas outside the building has been done. Used
building should be integral part of the project CFLs and TFLs are being properly collected and
design and should be in place before project disposed off/sent for recycling as per the prevailing
commissioning. Used CFLs and TFLs should be guidelines/rules of the regulatory authority to avoid
9
properly collected and disposed off/sent for mercury contamination. Solar lighting is being used
recycling as per the prevailing guidelines/rules of in signage and open areas.
the regulatory authority to avoid mercury
contamination. Use of solar panels must be
adopted to the maximum extent possible for
energy conservation.
p. The PP should use zero ozone depleting potential Agreed. Zero ozone depleting potential material in
material
in
insulation,
refrigeration,
air- insulation, refrigeration and air-conditioning is
conditioning. PP shall also provide Halon free being used. Halon free fire suppression system is
fire suppression system.
also being provided. Eco-friendly techniques are
used to control the use of ozone depleting
materials.
q. The solid waste generated should be properly Agreed. The solid waste generated will be properly
collected and segregated as per the requirement of collected and segregated as per the requirement of
the MSW Rules, 2000 and as amended from time the MSW Rules, 2000 and as amended from time
to time. The bio-degradable waste should be to time. Composting of the bio-degradable waste
composted by vermi-composting at the site ear will be done by vermi-composting at the site ear
marked within the project area and dry/inert solid marked within the project area and dry/inert solid
waste should be disposed off to the approved sites waste will be disposed off to the approved sites for
for land filling after recovering recyclable land filling after recovering recyclable material.
material.
r. The provision of the solar water heating system Agreed. The solar water heating system will be as
shall be as per norms specified by HAREDA and per norms specified by HAREDA and will be made
shall be made operational in each building block.
operational in each building block.
s. The traffic plan and the parking plan proposed by Agreed. The traffic and parking plan will be
the PP should be adhered to meticulously with adhered to and there is scope for additional parking
further scope of additional parking for future in case of future requirement. The entry and exit
requirement.
There
should
be
no
traffic points of the roads are kept congestion free.
congestion near the entry and exit points of the Parking is being fully internalized and no public
roads adjoining the proposed project site. Parking space is being used. Refer to Annexure IX.
should be fully internalized and no public space
should be used.
t. Operation and maintenance of STP, Solid waste Agreed. Operation and maintenance of STP, Solid
10
management
and
electrical
infrastructure, waste management and electrical infrastructure,
pollution control measures shall be ensured.
pollution control measures are being ensured.
u. Different types of wastes should be disposed off Agreed. The different types of wastes generated
as per the provisions of municipal solid waste, are being disposed off as per municipal solid waste,
hazardous waste, e-waste batteries & plastic rules hazardous waste, e-waste batteries & plastic rules
made under Environment Protection Act, 1986.
v. Standard
for
discharge
of
made under Environment Protection Act, 1986.
environmental Agreed.
The
pollutants as enshrined in various schedule of rule environmental
standards
for
pollutants
are
discharge
being
of
strictly
3 of Environment Protection Act, 1986 shall be complied with as enshrined in various schedules of
strictly complied with.
rule 3 of Environment Protection Act, 1986.
w. The PP shall make the provisions of guard pond Agreed. Provisions of guard pond and other
and other provisions for safety against failure in provisions for safety against failure in the operation
the operation of waste water treatment facilities. of waste water treatment facilities are being made.
The
project
proponent
shall
also
identify Acceptable outfall for treated effluent will also be
acceptable outfall for treated effluent.
identified.
x. The PP should strive to maintain the power factor Agreed. The power factor will be maintained
between 0.98 to 1.0 in order to conserve energy.
between 0.98 and 1.0 in order to conserve energy.
PART-B. GENERAL CONDITIONS
i.
The PP shall ensure the commitments made in Agreed. It is being ensured that the commitments
Form 1, Form 1A,
EIA/EMP and
other made in Form 1, Form 1A, EIA/EMP and other
documents submitted to the SEIAA for the documents submitted to the SEIAA for the
protection
of
environment
and
proposed protection
of
environment
and
proposed
environmental safeguards are compiled with in environmental safeguards are compiled with in
letter and spirit.
ii.
letter and spirit.
Six monthly compliance reports should be Agreed. Six monthly compliance reports are being
submitted to the HSPCB and Regional Office, submitted to the HSPCB and Regional Office,
MOEF, GOI, Northern Region, Chandigarh and a MOEF, GOI, Northern Region, Chandigarh and a
copy to the SEIAA, Haryana.
iii.
copy to the SEIAA, Haryana.
The SEIAA, Haryana reserves the right to add Agreed.
additional safeguard measures subsequently, if
found
necessary.
Environmental
Clearance
granted will be revoked if it is found that false
information has been given for getting approval
11
of this project. SEIAA reserves the right to
revoke the clearance if conditions stipulated are
not
implemented
to
the
satisfaction
of
SEIAA/MoEF.
iv.
The PP shall not violate any judicial orders/ Agreed. No judicial orders/ pronunciations issued
pronunciations issued by any court/Tribunal.
v.
by any court/Tribunal will be violated.
All other statutory clearances such as the Agreed. Used oil will be stored in the HDPE
approvals for storage of diesel from Chief drums. Since the land was allotted by HUDA as
Controller of Explosives, Fire Department, Civil part of its industrial land, therefore NOC from
Aviation Department, Forest Conservation Act, Forest Department is not required and the
1980 and Wildlife (Protection) Act, 1972, PLPA, acknowledgement for the same is attached as
1900, Forest Act, 1927 etc. shall be obtained, as Annexure XI. NOC from Fire Department is
applicable by project proponents from the attached as Annexure VII.
respective authorities prior to construction of the
project.
vi.
The PP should inform the public that the project Agreed. Advertisement informing the public about
has been accorded Environment Clearance by the accordance of Environment Clearance is in the
SEIAA and copies of the clearance letter are process.
available with State pollution Control Board &
SEIAA. This should be advertised within 7 days
from the date of issue of the clearance letter at
least in two local newspapers that are widely
circulated in the region and copy of the same
should be forwarded to SEIAA, Haryana. A copy
of Environment Clearance conditions shall also
be put on project proponent’s website for public
awareness.
vii.
Under the provisions of Environment (Protection) Agreed. Construction of the project was started
Act, 1986, legal action shall be initiated against upon receiving Consent to establish Annexure I.
the Project Proponent if it was found that
construction of the project has been started before
obtaining prior Environmental Clearance.
viii.
Any appeal against this Environmental Clearance Agreed.
12
shall lie with the National Green Tribunal, if
preferred, within a period of 30 days as
prescribed under Section 16 of the National
Green Tribunal Act, 2010.
ix.
The project proponent shall put in place Agreed. The Corporate Environment Policy has
Corporate Environment Policy as mentioned in been laid down in accordance to MoEF, so as to
MoEF, GOI OM No. J-11013/41/2006-IA II (I) conform to all the regulations w.r.t Environment
dated 26.04.2012 within 3 months period.
x.
(Protection) Act, 1986.
The fund earmarked for environment protection Agreed. This is a co-operative society and it is
measures should be kept in separate account and being ensured that all measures are taken
should not be diverted for other purposes and dedicatedly
and
the
fund
commissioned
year wise expenditure shall be reported to the efficiently utilized for environment protection.
SEIAA/ RO MoEF GOI under rules prescribed