December 2013 - Regional Office, Chandigarh

advertisement
SIX MONTHLY (From 1.06.2013 to 30.11.2013) (COMPLIANCES
OF PART – A SPECIFIC CONDITIONS AS PER -LETTER NO.
384/SEIAA(H)/2011-IA.III Dated 6,july 2011
Project - Town square
Gurgaon
, Sector –82A , Village Sihkohpur ,Nh 8 ,
PART A-SPECIFIC CONDITIONS
1. Constructions Phase
I
A First Aid Room will be provided at the project site both during construction and
operation of the project.
-
A first room has already been provided.
II,
Adequate drinking water facility should be provided for construction workers at
the site. The safe disposal of wastewater and solid wastes generated during the
construction phase should be ensured.
-Adequate drinking facility has already been provided. Safe disposal of
Waste Water & solid waste has been done
III
All the top soil excavated during construction activities should be stored for use
in horticulture/landscape developments within the project site.
-Soil removed is being used for horticulture, landscapes.
IV
Disposal of muck during construction phase should not create any adverse effect on the
neighbouring communities and be disposed taking the necessary precautions for general safety
and health aspects of people. Only approved sites with the approval of competent authority.
- The Excavated soil which is good for fertility is being used for
development greenery, plantation & the muck had been disposed in
proper manner without creating any adverse effect on the neighboring
communities
V
Construction spoils including bituminous material and other hazardous materials
must not be allowed to contaminate water courses and the dump sites for such
Material must be secured so that they should not leach into the ground water.
- Guide lines are being strictly followed
VI
Diesel generating sets during construction phase should be of
“enclosed type” to prevent noise and should conform to rules made under
Environment (Protection) Act 1986, prescribed for air and noise emission standards.
-Generator Sets installed are enclosed type.
VII
Monitoring Reports attached
The diesel required for operating D G Sets shall be stored in underground tanks
and if required clearance from chief controller of explosive shall be taken.,
Guide lines will be followed.
VIII
Ambient noise levels should conform to standards both during day and night
when measured at boundary wall of the premises. Incremental pollution loads on
the ambient air and noise quality should be closely monitored during
construction phase.
Noise level test is being monitored periodically and reports submitted to
regional office MOEF chandigarh. Reports Attached
IX
Fly ash should be used as building material in the construction as per fly ash
notification as amended on 27.8.2003.
- Fly Ash Notification Dated 14.9.99 as amended on 27-8-2003 is being
complied. Fly ash consumption details attached
X
Ready mixed concrete must be used in building constructions.
- Ready mix concrete is being used to conserve water.
XI
-
XII
Storm water control and its re use as per CGWA and BIS standards for various
Applications.
We shall follow CGWA guide lines and BIS standards for storm water
control and its various applications, CGWA approval received vide letter no
1089 dated 23.11.2010 .
Water demand during construction shall be reduced by use of pre mixed
concrete, curing agents and other best practices.
-Ready mix concrete is being used to conserve water
XIII
Permission to use ground water for construction shall be obtained from
competent authority prior to construction/operation of the project.
Tanker water being used during construction phase, Huda water will be
supplied by HUDA in operation phase .
XIV
Roof should meet the prospective requirement as per energy conservation building code by using
appropriate thermal insulation material to fullfil the requirement.
- We shall be using appropriate thermal insulation material to fulfill
requirement.
XV
The opaque wall requirement as per energy conservation building code which is proposed to be
mandatory for all air conditioned paces while it is aspirational for non air conditioned spaces by
use of appropriate thermal insulation to fulfill requirement.
- We shall follow NBC guidelines as applicable
XV
I approval of competent authority shall be obtained for structural safety of the buildings due to
any possible earthquake, adequacy of fire fighting equipments etc. as per National Building Code
including protect measured from lightening etc. if any forest land is involved in the proposed site
clearance under forest conservation act shall be taken from the competent authority.
- The design is being approved by HUDA / Town and Country planning
department Chandigarh. Clearance under forest conservation act received
vide letter no 823 dated 8.07.2011
XVII
project proponent will use water for construction phase through tankers, however
Permission from cgwa will be taken before using the borewells for construction purpose .
prior
- Tanker water being used during construction phase, Huda water
will be supplied by HUDA in operation phase.
XVIII
The project proponent will construct RWH pits@ one pit per acre for recharging the
ground water within project premises having 400mm bore and 20 mm slotted pipe as
proposed.
- Rain water harvesting details enclosed .
XIX
Project proponent will seek permission from air port authority
before starting construction.
- Permission Obtained
COMPLIANCES OF PART – B-, GENERAL CONDITIONS AS PER SEIAA Haryana letter
no SEAA/IIR/10/1618 dated 04-03-10
PART – B. GENERAL CONDITIONS
i)
The environmental safeguard contained in the EIA/EMP be implemented in letter and spirit.
We are implementing Environment Safe guards as specified
ii)
6 monthly monitoring reports should be submitted to the HSPCB and regional office MOEF GOI
Northen region chandigarh and a copy to the SEIA Haryana.
-
Six Monthly Monitoring Report to HSPCB and regional office MOEF
GOI Northern
region chandigarh is being submitted
-III)
The SEIA Haryana reserves the right to add additional safeguard measures subsequently
if found necessary Environment clearance granted will be revoked if it is found that the
false information has been given for getting approvals of the project.
We shall follow the guide lines.
5.
Necessary permission shall be obtained from the State Fire Department for providing fire
safety measures before allotment of premises. If any forest land is involved in the
proposed site, clearance under the Forest Conservation Act, 1980 from the Competent
Authority shall be taken.
-
Guide lines will be complied.
6.
All other statutory clearances such as the approvals for the storage of diesel from chief
controller of explosive , fire dept, civil aviation, department of forest conservation act
1980 wildlife ( protection ) act 1972 PLPA 1900 forest act 1972 etc shall be obtained as
applicable by project proponents from the respective authorities prior to the constroction
of the project.
NOC from Forest deptt received vide letter no 823 dated 8.07.2012 already submitted
The project proponent will not violate any judicial orders/ pronouncements issued by
the hon,ble supreme court/ high courts.
Guide lines will be followed.
The project Proponent should inform the public that the
project has been accorded environment clearance by the
SEIAA and copies of the clearance letter are available with the
state pollution control Board and SEIAA. This should be
advertised within 7 days from the date of issue of the
clearance letter at least in two local newspapers that are
widely circulated in the region and the copy of the same
should be forwarded to SEIAA Haryana.
Complied .