HALF – YEARLY COMPLIANCE OF STIPULATED

advertisement
HALF – YEARLY COMPLIANCE OF STIPULATED EVNIRONMENTAL
CONDITIONS / SAFEGUARDS IN THE ENVIRONMENTAL CLEARANCE
REF. LETTER NO. SEIAA/HR/2010 DATED – 25.11.2010 FOR GROUP HOUSING
PROJECT AT SECTOR – 108, DISTT. GURGAON, HARYANA.
M/s CHINTELS INDIA LIMITED
S. No.
CONDITIONS
STATUS OF COMPLIANCE
PART A - SPECIFIC CONDITIONS: Construction Phase
I
A first aid room as proposed in the project Agreed. First aid room will be provided both
report will be provided in both during during construction and operation phase of the
construction and operation phase of the project.
project.
II
Adequate
drinking
water
and
sanitary Agreed. Adequate drinking water facility and
facilities should be provided for construction community toilets will be providing on-site.
workers at the site. Provision should be made Mostly local labors will be employed during the
for mobile toilets. Open defecation by the construction phase so negligible quantity of
labors is strictly prohibited. The safe disposal organic waste would be generated, inorganic
of waste water and solid wastes generated waste will be segregated and recyclable waste
during the construction phase should be will be sold off to government approved vendors
ensured.
and non-recyclable waste will be transported to
local solid waste dumping site; wastewater
generated will be sent to septic tanks.
III
All the topsoil excavated during construction All
the
topsoil
excavated
during
early
activities should be stored for use in construction activities will store and will be used
horticulture/landscape development within the for horticulture/landscape development within
project site.
IV
the project site.
Disposal of muck during construction phase Disposal of muck generated during construction
should not create any adverse effect on the phase will not create any adverse effect on
neighboring communities and be disposed off neighboring communities and it will be disposed
taking necessary precautions for general off to nearby local solid waste disposable site
safety and health aspects of people, only in from Haryana State Pollution Control Board,
approved sites with the approval of competent taking necessary precautions for general safety
authority.
and health aspects of people.
V
Construction spoils, including bituminous Agreed.
material and other hazardous materials, must bituminous
Construction
material
spoils,
will
not
including
allow
to
not be allowed to contaminate watercourses contaminating watercourses and secured that
and the dump sites for such material must be materials should not leach into the ground water.
secured so that they should not leach into the This is the group housing project so; there will
ground water and any hazardous waste be no generation of hazardous material during
generated during construction phase, should construction phase.
be disposed off as per applicable rules and
norms with necessary approval of the
Haryana State Pollution Control Board.
VI
The diesel generator sets to be used during
Agreed. DG sets will be run on low sulphur
construction phase should be of low sulphur diesel only (Sulphur content <0.25%) with the
diesel
type
and
should
conform
to provision of air and noise standards as per The
Environment (Protection) Rules prescribed Environmental (Protection) Act, 1986 norms.
for air and noise emission standards.
VII
The diesel required for operating DG sets
Agreed. The diesel required for operating DG set
shall be stored in underground tanks and if will be stored in underground tanks. The
required, clearance from Chief Controller of quantity that would be stored if increased the
Explosives shall be taken.
threshold limit specified in MSIHC rules so
necessary permission will be obtained from
Chief Controller of Explosives.
VIII
Ambient noise levels should conform to the Agreed. Ambient noise levels are conforming to
residential standards both during day and residential standards both during day and night.
night. Incremental pollution loads on the Incremental pollution loads on the ambient air
ambient air and noise quality should be and noise quality is being monitored and
closely monitored during construction phase. adequate steps will be taken so as to conform to
Adequate measures should be taken to reduce the stipulated standards during the construction
ambient
air
and
noise
level
during phase. Annexure – I.
construction phase, so as to conform to the
stipulated standards.
IX
Fly as should be used as building material in Block work bricks are used as building material.
the construction as per the provisions of Fly As the bricks contain low density that makes it
Ash Notification of September 1999 and low in Thermal Conductivity, these bricks act as
amended as on 27th August, 2003.
thermal Insulators which resist the building for
being heating.
X
XI
Ready mixed concrete must be used in Agreed. Ready mixed concrete will be used in
building construction.
building construction.
Storm water control and its re-use as per
Agreed. Storm water control and its re-use will
CGWB and BIS standards for various be maintained as per CGWB and BIS standards
applications should be ensured.
XII
for various applications.
Water demand during construction should be Agreed. Water demand during construction will
reduced by use of pre-mixed concrete, curing be reduced by use of pre-mixed concrete, curing
agents and other best practices referred.
XIII
agents and other best practices referred.
Permission from Competent Authority for Agreed. Water will be supplied by HUDA. NOC
supply of water shall be obtained prior to is under process. The application has been filled
operation of the project.
to HUDA for water supply, copy of the same is
enclosed as Annexure – II
XIV
Roof should meet prescriptive requirement as Agreed. Roof will be thermal insulated as per
per Energy Conservation Building Code by Energy Conservation Building Code.
using appropriate thermal insulation material
to fulfill requirement.
XV
Opaque
wall
should
meet
prescriptive Agreed. Opaque wall will be thermal insulated
requirement as per Energy Conservation as per Energy Conservation Building Code.
Building Code which is proposed to be
mandatory for all air conditioned spaces while
it is aspirational for non-air-conditioned
spaces
by
use
of
appropriate
thermal
insulation material to fulfill requirement.
XVI
The approval of the competent authority shall Agreed. The approval of competent authority
be obtained for structural safety of the will be taken for structural safety of the building
building due to earthquake, adequacy of due to earthquake, adequacy of firefighting
firefighting equipment, etc. as per National equipment, etc. as per National Building Code
Building Code including protection measures including protection measures from lightening
from lightening etc. If any forest land is etc. No forest land is involved in the project site.
involved in the proposed site, clearance under NOC from Dy. Conservator of Forest and
Forest Conservation Act shall be obtained Aravali clearance is enclosed as Annexure – III
from the competent Authority.
XVII
(a) & (b).
The project proponent will use water for Agreed. During construction phase treated water
construction phase through tankers. However, will be used, which will be supplied from
prior permission from CGWA will be taken HUDA as well as no ground water will be
before using the bore well water for extracted. Water will be supply by HUDA;
construction purposes.
XVIII
Application copy is enclosed as Annexure- IV.
The project proponent will construct rain Agreed. Rain water harvesting pits will construct
water harvesting pits @ 1 pit per acre for @ 1 pit per acre for recharging the ground water
recharging the ground water within the within the project premises having 400 mm bore
project premises having 400 mm bore and 200 and 200 mm slotted pipe as proposed in the
mm slotted pipe as proposed.
RWH plan showing the storm water line and
RWH pit is enclosed as Annexure – V.
XIX
The PP will provide minimum one hydraulic Agreed. Maximum Height of the Building will
ladder for escaping of people in case of fire.
be 114.57 m. Maximum height upto which
hydraulic ladder can be provided are 12m, So
permanent ladder will be provided instead of
hydraulic ladder.
XX
The project proponent shall commence Agreed. During construction phase treated water
construction
activity
only
after
getting will be used, which will be supplied from
permission of CGWA for abstraction of HUDA.
ground water from the existing bore-wells or
water supply is made available by HUDA.
PART A - SPECIFIC CONDITIONS: Operation Phase
I
The STP shall be installed for the treatment of Agreed. The STP will be installed for treatment
the sewage generated to the prescribed of sewage generated to the prescribed standards
standards including odour and treated effluent including odour and treated effluent will be
will be recycled to achieve zero exit recycled to the maximum extent possible to
discharge. The STP should be installed at the achieve zero discharge. Discharge of effluent
remotest place in the project area.
will be conforming to the norms and standards
of HSPCB, Panchkula. Schematic layout of STP
is attached as Annexure – VI.
II
Separation of the grey and black water should Agreed. Separation of gray and black water will
be done by the use of dual plumbing line. be done by the use of dual plumbing line.
Treatment
of
100%
grey
water
by Treatment of 100 % gray water by decentralized
decentralized treatment should be done treatment will be done ensuring that the reensuring that the re-circulated water should circulated water will have BOD maximum upto
have BOD maximum 10 ppm and the 10 mg/l and the recycled water will be used for
recycled water will be used for flushing, flushing, horticulture, DG cooling, HVAC,
gardening and DG set cooling and running of recreational purposes. Water balance diagram is
fountain in the water body.
III
attached as Annexure – VII.
For disinfection of the treated wastewater Agreed.
For
disinfection
of
the
treated
ultra-violate radiation or ozonization should wastewater ultra-violate radiation will be used.
be used.
STP feasibility report is enclosed as Annexure –
VI.
IV
The solid waste generated should be properly Agreed. The solid waste generated will be
collected and segregated. Bio-degradable properly
collected
and
segregated.
Bio-
waste will be decomposed at site and dry/inert degradable waste will be decomposed at site by
solid waste should be disposed off to composting and will be used as manure,
approved sites for land filling after recovering dry/inert solid waste will be disposed off in
recyclable material.
MSW disposal site. Solid waste management
plan is enclosed as Annexure-VIII.
V
Diesel power generating sets proposed as DG sets (5572 KVA) have been catering the
source of backup power for lifts, common demand during power failure and will use diesel
area illumination and for domestic use should of low sulphur contents (maximum 0.25%). Plan
be of enclosed type and conform to rules showing the DG sets location is enclosed as
made under the Environmental (Protection) Annexure-IX.
Act, 1986. The location of the DG sets should
be in the basement as promised by the project
proponent with appropriate stack height i.e.
above the roof level as per the CPCB norms.
The diesel used for DG sets should be of low
sulphur contents (maximum 0.25%).
VI
Ambient Noise level should be controlled to Agreed. Ambient noise level will be controlled
ensure that it does not exceed the prescribed to ensure that it does not exceed the prescribed
standards both within and at the boundary of standards both within and at the boundary of the
the Proposed Residential Complex.
Group Housing Colony. Annexure – I.
VII
The project proponent should maintain at Agreed. The total green cover area in the project
least 20% as green cover area for tree will be provided as 39%.
plantation especially all around the periphery

Green belt is 25%
of the project and on the road sides preferably

Organized green is 14%
with local species so as to provide protection Green area plan is enclosed as Annexure – X.
against particulates and noise. The open
spaces inside the plot should be preferably
landscaped and covered with vegetation/grass.
VIII
Weep holes in the compound front walls shall Agreed. Weep holes in the compound front walls
be provided to ensure natural drainage of rain will be provided to ensure natural drainage of
water in the catchments area during the rain water in the catchments area during the
monsoon period.
IX
monsoon period.
Rain water harvesting for roof run-off and Agreed. Rain water harvesting for roof run-off
surface run-off, as per plan submitted should and surface run-off, will be implemented. Before
be implemented. Before recharging the recharging the surface run-off, pretreatment
surface
run-off,
pretreatment
through through sedimentation tank is done to remove
sedimentation tank must be done to remove suspended matter, oil and grease. The bore well
suspended matter, oil and grease. The bore for rainwater recharging is kept at least 5 mts.
well for rainwater recharging should be kept
above the highest around water table as desired.
at least 5 mts. above the highest around water
table.
X
The ground water level and its quality should Agreed. The ground water level and its quality
be monitored periodically in consultation with will be monitored periodically in consultation
Central Ground Water Authority.
XI
with Central Ground Water Authority.
There should be no traffic congestion near the Agreed. There will be no traffic congestion near
entry and exit points from the roads adjoining the entry and exit points from the roads
the proposed project site. Parking should be adjoining the proposed project site. Parking will
fully internalized and no public space should be fully internalized and no public space should
be utilized.
be utilized. Parking plan is enclosed as
Annexure – XI.
XII
A report on the energy conservation measures Agreed. Report on the energy conservation
conforming to energy as conservation norms
measures conforming to energy as conservation
finalized by Bureau of Energy Efficiency norms finalized by Bureau of Energy Efficiency
should be prepared incorporating details is enclosed as Annexure – XII.
about building materials & technology, R &
U Factors etc. and submit to SEIAA, Haryana
in three months’ time.
XIII
Energy
conservation
measures
like Agreed. Energy conservation measures like
installation of CFLs/TFLs for lighting the installation of CFLs/TFLs for lighting the areas
areas outside the building should be integral outside the building should be integral part of
part of the project design and should be in the project design and should be in place before
place before project commissioning. Used project commissioning. Used CFLs and TFLs
CFLs and TFLs should be properly collected will be properly collected and disposed off/sent
and disposed off/sent for recycling as per the for
recycling
as
per
the
prevailing
prevailing guidelines/rules of the regulatory guidelines/rules of the regulatory authority to
authority to avoid mercury contamination. avoid mercury contamination. Solar lighting is
Use of solar panels must be adapted to proposed for open spaces and signage.
maximum
extent
possible
for
energy
conservation.
XIV
The solid waste generated should be properly Agreed. The solid waste generated will be
collected
and
segregated
as
per
the properly collected and segregated as per the
requirement of the MSW Rules, 2000 and as requirement of the MSW Rules, 2000 and as
amended from time to time. The bio- amended from time to time. The bio-degradable
degradable waste should be composted by waste will be composted by vermin-composting
vermi-composting at the site near marked at the site near marked within the project area
within the project area and dry/inert solid and dry/inert solid waste should be disposed off
waste should be disposed off to the approved to the approved sites for land filling after
sites
for
land
filling
recyclable material.
after
recovering recovering recyclable material. The solid waste
management plan is enclosed as Annexure –
VIII.
XV
The provision of the solar water heating Agreed. The provision of the solar water heating
system shall be as per norms specified by system will be as per norms specified by
HAREDA and shall be made operational in HAREDA is proposed for staff quarters.
each building block.
XVI
The project proponent will use the water from Agreed. Water will be supplied by HUDA, and
the already existing tube wells for domestic Application has been filled to HUDA office for
purposes only after getting permission from water supply copy of same is enclosed as.
CGWA or will use water supply from HUDA
Annexure –II.
whichever is earlier during operational phase.
XVII
The traffic plan and the parking plan proposed Agreed. The traffic plan and the parking plan
by the PP should be adhered to meticulously proposed by the PP will be adhered to
with further scope of additional parking for meticulously with further scope of additional
future requirement. There should be no traffic parking for future requirement. There will be no
congestion near the entry and exit points from traffic congestion near the entry and exit points
the roads adjoining the proposed project site. from the roads adjoining the project site.
Parking should be fully internalized and no Parking plan is incorporated as Annexure – XI.
public space should be used.
XVIII
The Project Proponent shall install solar panel Agreed. The Project Proponent will install solar
of 20 KW.
XIX
panel of 20 KW in the project area.
The Project Proponent shall hand over the Agreed. Project Proponent will hand over the
possession of dwelling units to the allottees possession of dwelling units to the allottees only
only after the infrastructural facilities i.e roads after the infrastructural facilities i.e roads and
and water supply network are laid down by water supply network are laid down by HUDA
HUDA in this sector.
in this sector.
PART- B GENERAL CONDITION
I
The environmental safeguards contained in Agreed. The EMP report IS enclosed as an
the EIA/EMP Report should be implemented Annexure – XIII.
in letter and spirit.
II
Six monthly compliance reports should be Agreed. Six monthly compliance reports has
submitted to the HSPCB and Regional Office, been submitted to the HSPCB and Regional
MoEF, GoI, Northern Region, Chandigarh Office,
and a copy to the SEIAA Haryana.
MoEF,
GoI,
Northern
Region,
Chandigarh and a copy to the SEIAA Haryana,
Copy of same is enclosed as Annexure-XIV.
III
The SEIAA, Haryana reserves the right to add Agreed. The SEIAA, Haryana reserves the right
additional safeguard measures subsequently, to
add
additional
safeguard
measures
if found necessary. Environmental Clearance subsequently, if found necessary. Environmental
granted will be revoked if it is found that false Clearance granted will be revoked if it is found
information has been given for getting that false information has been given for getting
approval for this project.
IV
approval for this project.
The Project Proponent will start construction Already got NOC from Forest department, Govt.
only after getting NOC from the Forest of Haryana and area under consideration is not
department that the area under consideration fall under section – 4 and 5 PLPA – 1900.
does not fall under section – 4 and 5 PLPA – Annexure – III (a).
1900.
V
All other statutory clearances such as the

Forest Clearance received from Forest
approvals for storage of diesel from Chief
department, Government of Haryana,
Controller of Explosives, Fire Department,
Letter No. is 2484-G. Annexure-III (a)
Civil
Aviation
Conservation
Act,
Department,
1980
and
Forest

Wildlife
NOC for height clearance from Airports
Authority of India. Letter No. is
(Protection) Act, 1972, PLPA, 1900, Forest
AAI/NOC/2012/72/3009.
Act, 1927 etc. shall be obtained, as applicable
XV
by project proponents from the respective
authorities prior to construction of the project.

Aravali
clearance
from
Annexure-
Tehsildar,
Gurgaon dist. Haryana. Letter No. is
3597 date 5-11-13. Annexure-III (b)
VI
The Project Proponent will not violate any Agreed. Project Proponent will not violate any
judicial orders/pronouncements issued by the judicial orders/pronouncements issued by the
Hon’ble Supreme Court/High Courts.
VII
Hon’ble Supreme Court/High Courts.
The PP should inform the public that the Agreed. The PP will be inform the public that
project has been accorded Environment the project has been accorded Environment
Clearance by the SEIAA and copies of the Clearance by the SEIAA and copies of the
clearance letter are available with 7 days from clearance letter are available with 7 days from
the date of issue of the clearance latter at least the date of issue of the clearance latter at least in
in two local newspapers that are widely two local newspapers that are widely circulated
circulated in the region and the copy of the in the region and the copy of the same should be
same
should
Haryana.
be
forwarded
to
SEIAA forwarded to SEIAA Haryana.
Download