HALF – YEARLY COMPLIANCE OF STIPULATED EVNIRONMENTAL CONDITIONS / SAFEGUARDS IN THE ENVIRONMENTAL CLEARANCE REF. LETTER NO. SEIAA/HR/2010 DATED – 25.11.2010 FOR GROUP HOUSING PROJECT AT SECTOR – 108, DISTT. GURGAON, HARYANA. M/s CHINTELS INDIA LIMITED S. No. CONDITIONS STATUS OF COMPLIANCE PART A - SPECIFIC CONDITIONS: Construction Phase I A first aid room as proposed in the project Agreed. First aid room will be provided both report will be provided in both during during construction and operation phase of the construction and operation phase of the project. project. II Adequate drinking water and sanitary Agreed. Adequate drinking water facility and facilities should be provided for construction community toilets will be providing on-site. workers at the site. Provision should be made Mostly local labors will be employed during the for mobile toilets. Open defecation by the construction phase so negligible quantity of labors is strictly prohibited. The safe disposal organic waste would be generated, inorganic of waste water and solid wastes generated waste will be segregated and recyclable waste during the construction phase should be will be sold off to government approved vendors ensured. and non-recyclable waste will be transported to local solid waste dumping site; wastewater generated will be sent to septic tanks. III All the topsoil excavated during construction All the topsoil excavated during early activities should be stored for use in construction activities will store and will be used horticulture/landscape development within the for horticulture/landscape development within project site. IV the project site. Disposal of muck during construction phase Disposal of muck generated during construction should not create any adverse effect on the phase will not create any adverse effect on neighboring communities and be disposed off neighboring communities and it will be disposed taking necessary precautions for general off to nearby local solid waste disposable site safety and health aspects of people, only in from Haryana State Pollution Control Board, approved sites with the approval of competent taking necessary precautions for general safety authority. and health aspects of people. V Construction spoils, including bituminous Agreed. material and other hazardous materials, must bituminous Construction material spoils, will not including allow to not be allowed to contaminate watercourses contaminating watercourses and secured that and the dump sites for such material must be materials should not leach into the ground water. secured so that they should not leach into the This is the group housing project so; there will ground water and any hazardous waste be no generation of hazardous material during generated during construction phase, should construction phase. be disposed off as per applicable rules and norms with necessary approval of the Haryana State Pollution Control Board. VI The diesel generator sets to be used during Agreed. DG sets will be run on low sulphur construction phase should be of low sulphur diesel only (Sulphur content <0.25%) with the diesel type and should conform to provision of air and noise standards as per The Environment (Protection) Rules prescribed Environmental (Protection) Act, 1986 norms. for air and noise emission standards. VII The diesel required for operating DG sets Agreed. The diesel required for operating DG set shall be stored in underground tanks and if will be stored in underground tanks. The required, clearance from Chief Controller of quantity that would be stored if increased the Explosives shall be taken. threshold limit specified in MSIHC rules so necessary permission will be obtained from Chief Controller of Explosives. VIII Ambient noise levels should conform to the Agreed. Ambient noise levels are conforming to residential standards both during day and residential standards both during day and night. night. Incremental pollution loads on the Incremental pollution loads on the ambient air ambient air and noise quality should be and noise quality is being monitored and closely monitored during construction phase. adequate steps will be taken so as to conform to Adequate measures should be taken to reduce the stipulated standards during the construction ambient air and noise level during phase. Annexure – I. construction phase, so as to conform to the stipulated standards. IX Fly as should be used as building material in Block work bricks are used as building material. the construction as per the provisions of Fly As the bricks contain low density that makes it Ash Notification of September 1999 and low in Thermal Conductivity, these bricks act as amended as on 27th August, 2003. thermal Insulators which resist the building for being heating. X XI Ready mixed concrete must be used in Agreed. Ready mixed concrete will be used in building construction. building construction. Storm water control and its re-use as per Agreed. Storm water control and its re-use will CGWB and BIS standards for various be maintained as per CGWB and BIS standards applications should be ensured. XII for various applications. Water demand during construction should be Agreed. Water demand during construction will reduced by use of pre-mixed concrete, curing be reduced by use of pre-mixed concrete, curing agents and other best practices referred. XIII agents and other best practices referred. Permission from Competent Authority for Agreed. Water will be supplied by HUDA. NOC supply of water shall be obtained prior to is under process. The application has been filled operation of the project. to HUDA for water supply, copy of the same is enclosed as Annexure – II XIV Roof should meet prescriptive requirement as Agreed. Roof will be thermal insulated as per per Energy Conservation Building Code by Energy Conservation Building Code. using appropriate thermal insulation material to fulfill requirement. XV Opaque wall should meet prescriptive Agreed. Opaque wall will be thermal insulated requirement as per Energy Conservation as per Energy Conservation Building Code. Building Code which is proposed to be mandatory for all air conditioned spaces while it is aspirational for non-air-conditioned spaces by use of appropriate thermal insulation material to fulfill requirement. XVI The approval of the competent authority shall Agreed. The approval of competent authority be obtained for structural safety of the will be taken for structural safety of the building building due to earthquake, adequacy of due to earthquake, adequacy of firefighting firefighting equipment, etc. as per National equipment, etc. as per National Building Code Building Code including protection measures including protection measures from lightening from lightening etc. If any forest land is etc. No forest land is involved in the project site. involved in the proposed site, clearance under NOC from Dy. Conservator of Forest and Forest Conservation Act shall be obtained Aravali clearance is enclosed as Annexure – III from the competent Authority. XVII (a) & (b). The project proponent will use water for Agreed. During construction phase treated water construction phase through tankers. However, will be used, which will be supplied from prior permission from CGWA will be taken HUDA as well as no ground water will be before using the bore well water for extracted. Water will be supply by HUDA; construction purposes. XVIII Application copy is enclosed as Annexure- IV. The project proponent will construct rain Agreed. Rain water harvesting pits will construct water harvesting pits @ 1 pit per acre for @ 1 pit per acre for recharging the ground water recharging the ground water within the within the project premises having 400 mm bore project premises having 400 mm bore and 200 and 200 mm slotted pipe as proposed in the mm slotted pipe as proposed. RWH plan showing the storm water line and RWH pit is enclosed as Annexure – V. XIX The PP will provide minimum one hydraulic Agreed. Maximum Height of the Building will ladder for escaping of people in case of fire. be 114.57 m. Maximum height upto which hydraulic ladder can be provided are 12m, So permanent ladder will be provided instead of hydraulic ladder. XX The project proponent shall commence Agreed. During construction phase treated water construction activity only after getting will be used, which will be supplied from permission of CGWA for abstraction of HUDA. ground water from the existing bore-wells or water supply is made available by HUDA. PART A - SPECIFIC CONDITIONS: Operation Phase I The STP shall be installed for the treatment of Agreed. The STP will be installed for treatment the sewage generated to the prescribed of sewage generated to the prescribed standards standards including odour and treated effluent including odour and treated effluent will be will be recycled to achieve zero exit recycled to the maximum extent possible to discharge. The STP should be installed at the achieve zero discharge. Discharge of effluent remotest place in the project area. will be conforming to the norms and standards of HSPCB, Panchkula. Schematic layout of STP is attached as Annexure – VI. II Separation of the grey and black water should Agreed. Separation of gray and black water will be done by the use of dual plumbing line. be done by the use of dual plumbing line. Treatment of 100% grey water by Treatment of 100 % gray water by decentralized decentralized treatment should be done treatment will be done ensuring that the reensuring that the re-circulated water should circulated water will have BOD maximum upto have BOD maximum 10 ppm and the 10 mg/l and the recycled water will be used for recycled water will be used for flushing, flushing, horticulture, DG cooling, HVAC, gardening and DG set cooling and running of recreational purposes. Water balance diagram is fountain in the water body. III attached as Annexure – VII. For disinfection of the treated wastewater Agreed. For disinfection of the treated ultra-violate radiation or ozonization should wastewater ultra-violate radiation will be used. be used. STP feasibility report is enclosed as Annexure – VI. IV The solid waste generated should be properly Agreed. The solid waste generated will be collected and segregated. Bio-degradable properly collected and segregated. Bio- waste will be decomposed at site and dry/inert degradable waste will be decomposed at site by solid waste should be disposed off to composting and will be used as manure, approved sites for land filling after recovering dry/inert solid waste will be disposed off in recyclable material. MSW disposal site. Solid waste management plan is enclosed as Annexure-VIII. V Diesel power generating sets proposed as DG sets (5572 KVA) have been catering the source of backup power for lifts, common demand during power failure and will use diesel area illumination and for domestic use should of low sulphur contents (maximum 0.25%). Plan be of enclosed type and conform to rules showing the DG sets location is enclosed as made under the Environmental (Protection) Annexure-IX. Act, 1986. The location of the DG sets should be in the basement as promised by the project proponent with appropriate stack height i.e. above the roof level as per the CPCB norms. The diesel used for DG sets should be of low sulphur contents (maximum 0.25%). VI Ambient Noise level should be controlled to Agreed. Ambient noise level will be controlled ensure that it does not exceed the prescribed to ensure that it does not exceed the prescribed standards both within and at the boundary of standards both within and at the boundary of the the Proposed Residential Complex. Group Housing Colony. Annexure – I. VII The project proponent should maintain at Agreed. The total green cover area in the project least 20% as green cover area for tree will be provided as 39%. plantation especially all around the periphery Green belt is 25% of the project and on the road sides preferably Organized green is 14% with local species so as to provide protection Green area plan is enclosed as Annexure – X. against particulates and noise. The open spaces inside the plot should be preferably landscaped and covered with vegetation/grass. VIII Weep holes in the compound front walls shall Agreed. Weep holes in the compound front walls be provided to ensure natural drainage of rain will be provided to ensure natural drainage of water in the catchments area during the rain water in the catchments area during the monsoon period. IX monsoon period. Rain water harvesting for roof run-off and Agreed. Rain water harvesting for roof run-off surface run-off, as per plan submitted should and surface run-off, will be implemented. Before be implemented. Before recharging the recharging the surface run-off, pretreatment surface run-off, pretreatment through through sedimentation tank is done to remove sedimentation tank must be done to remove suspended matter, oil and grease. The bore well suspended matter, oil and grease. The bore for rainwater recharging is kept at least 5 mts. well for rainwater recharging should be kept above the highest around water table as desired. at least 5 mts. above the highest around water table. X The ground water level and its quality should Agreed. The ground water level and its quality be monitored periodically in consultation with will be monitored periodically in consultation Central Ground Water Authority. XI with Central Ground Water Authority. There should be no traffic congestion near the Agreed. There will be no traffic congestion near entry and exit points from the roads adjoining the entry and exit points from the roads the proposed project site. Parking should be adjoining the proposed project site. Parking will fully internalized and no public space should be fully internalized and no public space should be utilized. be utilized. Parking plan is enclosed as Annexure – XI. XII A report on the energy conservation measures Agreed. Report on the energy conservation conforming to energy as conservation norms measures conforming to energy as conservation finalized by Bureau of Energy Efficiency norms finalized by Bureau of Energy Efficiency should be prepared incorporating details is enclosed as Annexure – XII. about building materials & technology, R & U Factors etc. and submit to SEIAA, Haryana in three months’ time. XIII Energy conservation measures like Agreed. Energy conservation measures like installation of CFLs/TFLs for lighting the installation of CFLs/TFLs for lighting the areas areas outside the building should be integral outside the building should be integral part of part of the project design and should be in the project design and should be in place before place before project commissioning. Used project commissioning. Used CFLs and TFLs CFLs and TFLs should be properly collected will be properly collected and disposed off/sent and disposed off/sent for recycling as per the for recycling as per the prevailing prevailing guidelines/rules of the regulatory guidelines/rules of the regulatory authority to authority to avoid mercury contamination. avoid mercury contamination. Solar lighting is Use of solar panels must be adapted to proposed for open spaces and signage. maximum extent possible for energy conservation. XIV The solid waste generated should be properly Agreed. The solid waste generated will be collected and segregated as per the properly collected and segregated as per the requirement of the MSW Rules, 2000 and as requirement of the MSW Rules, 2000 and as amended from time to time. The bio- amended from time to time. The bio-degradable degradable waste should be composted by waste will be composted by vermin-composting vermi-composting at the site near marked at the site near marked within the project area within the project area and dry/inert solid and dry/inert solid waste should be disposed off waste should be disposed off to the approved to the approved sites for land filling after sites for land filling recyclable material. after recovering recovering recyclable material. The solid waste management plan is enclosed as Annexure – VIII. XV The provision of the solar water heating Agreed. The provision of the solar water heating system shall be as per norms specified by system will be as per norms specified by HAREDA and shall be made operational in HAREDA is proposed for staff quarters. each building block. XVI The project proponent will use the water from Agreed. Water will be supplied by HUDA, and the already existing tube wells for domestic Application has been filled to HUDA office for purposes only after getting permission from water supply copy of same is enclosed as. CGWA or will use water supply from HUDA Annexure –II. whichever is earlier during operational phase. XVII The traffic plan and the parking plan proposed Agreed. The traffic plan and the parking plan by the PP should be adhered to meticulously proposed by the PP will be adhered to with further scope of additional parking for meticulously with further scope of additional future requirement. There should be no traffic parking for future requirement. There will be no congestion near the entry and exit points from traffic congestion near the entry and exit points the roads adjoining the proposed project site. from the roads adjoining the project site. Parking should be fully internalized and no Parking plan is incorporated as Annexure – XI. public space should be used. XVIII The Project Proponent shall install solar panel Agreed. The Project Proponent will install solar of 20 KW. XIX panel of 20 KW in the project area. The Project Proponent shall hand over the Agreed. Project Proponent will hand over the possession of dwelling units to the allottees possession of dwelling units to the allottees only only after the infrastructural facilities i.e roads after the infrastructural facilities i.e roads and and water supply network are laid down by water supply network are laid down by HUDA HUDA in this sector. in this sector. PART- B GENERAL CONDITION I The environmental safeguards contained in Agreed. The EMP report IS enclosed as an the EIA/EMP Report should be implemented Annexure – XIII. in letter and spirit. II Six monthly compliance reports should be Agreed. Six monthly compliance reports has submitted to the HSPCB and Regional Office, been submitted to the HSPCB and Regional MoEF, GoI, Northern Region, Chandigarh Office, and a copy to the SEIAA Haryana. MoEF, GoI, Northern Region, Chandigarh and a copy to the SEIAA Haryana, Copy of same is enclosed as Annexure-XIV. III The SEIAA, Haryana reserves the right to add Agreed. The SEIAA, Haryana reserves the right additional safeguard measures subsequently, to add additional safeguard measures if found necessary. Environmental Clearance subsequently, if found necessary. Environmental granted will be revoked if it is found that false Clearance granted will be revoked if it is found information has been given for getting that false information has been given for getting approval for this project. IV approval for this project. The Project Proponent will start construction Already got NOC from Forest department, Govt. only after getting NOC from the Forest of Haryana and area under consideration is not department that the area under consideration fall under section – 4 and 5 PLPA – 1900. does not fall under section – 4 and 5 PLPA – Annexure – III (a). 1900. V All other statutory clearances such as the Forest Clearance received from Forest approvals for storage of diesel from Chief department, Government of Haryana, Controller of Explosives, Fire Department, Letter No. is 2484-G. Annexure-III (a) Civil Aviation Conservation Act, Department, 1980 and Forest Wildlife NOC for height clearance from Airports Authority of India. Letter No. is (Protection) Act, 1972, PLPA, 1900, Forest AAI/NOC/2012/72/3009. Act, 1927 etc. shall be obtained, as applicable XV by project proponents from the respective authorities prior to construction of the project. Aravali clearance from Annexure- Tehsildar, Gurgaon dist. Haryana. Letter No. is 3597 date 5-11-13. Annexure-III (b) VI The Project Proponent will not violate any Agreed. Project Proponent will not violate any judicial orders/pronouncements issued by the judicial orders/pronouncements issued by the Hon’ble Supreme Court/High Courts. VII Hon’ble Supreme Court/High Courts. The PP should inform the public that the Agreed. The PP will be inform the public that project has been accorded Environment the project has been accorded Environment Clearance by the SEIAA and copies of the Clearance by the SEIAA and copies of the clearance letter are available with 7 days from clearance letter are available with 7 days from the date of issue of the clearance latter at least the date of issue of the clearance latter at least in in two local newspapers that are widely two local newspapers that are widely circulated circulated in the region and the copy of the in the region and the copy of the same should be same should Haryana. be forwarded to SEIAA forwarded to SEIAA Haryana.