HALF-YEARLY COMPLIANCE OF STIPULATED ENVIRONMENTAL CONDITIONS/ SAFEGUARDS IN THE ENVIRONMENTAL CLEARANCE REF. LETTER NO. SEIAA/HR/2013/149 DATED 28.05.2013 FOR “COMMERCIAL” PROJECT AT VILLAGE Bajghera, SECTOR-114, GURGAON, HARYANA. BY M/s Chintels India Ltd. Sl. No. Conditions Status of Compliance PART A - SPECIFIC CONDITIONS: Construction Phase:1. “Consent for Establishment” shall be obtained Agreed. “Consent to Establishment” has from Haryana State Pollution Control Board been obtained from the Haryana State Under Air and Water act and a copy shall be Pollution Control Board under Air and submitted to the SEIAA, Haryana before the Water act. Copy of CTE is enclosed as start of any construction work at site. 2. Annexure –I. A first aid room as proposed in the project Agreed. First aid room has been report will be provided in both during provided during construction phase same construction and operation phase of the will also be managed during operational project. 3. phase. Adequate drinking water and sanitary facilities Agreed. An adequate drinking water should be provided for construction workers at facility and community toilet has been the site. Provision should be made for mobile provided for construction workers at the toilets. Open defecation by the labors is site. Provision has been made for strictly prohibited. The safe disposal of waste mobile toilets. Open defecation by the water and solid wastes generated during the labors has been strictly prohibited. The construction phase should be ensured. wastewater generated during construction phase is being sent to septic tanks. Left over cement and mortars, cement concrete blocks, aggregate, sand and other inorganic material will be recycled and reused as granular subbase (GSB) layer of pavement. 4. All the top soil excavated during construction Agreed, Separate stock piles had been activities should be stored for use in maintained. All the top soil excavated horticulture/landscape development within the during construction activities will be project site. stored and utilized in horticulture/ landscape developments within the project site. The remaining excavated soil had been utilized in re-filling of foundation, road works, rising of site level etc. 5. The project proponent shall ensure that the Agreed, The building material required building material required during construction during construction phase have been phase is properly stored with in the project properly stored with in the project area area and disposal of construction waste should and disposal of construction waste does not create any adverse effect on the not create any adverse effects on the neighboring communities and should be neighboring communities and is being disposed of after taking necessary precautions disposed off by taking the necessary for general safety and health aspects of people, precautions for general safety and health only in approved sites with the approval of aspects of people, only in approved sites competent authority. with the approval of competent authority. 6. Construction spoils, including bituminous Agreed, Construction spoils including material and other hazardous materials, must bituminous material and other hazardous not be allowed to contaminate watercourses materials will not being allowed to and the dump sites for such material must be contaminate water courses and the dump secured so that they should not leach into the sites for such material will be secured so ground water and any hazardous waste that they should not leach into the generated during construction phase, should be ground water. Materials will be disposed disposed off as per applicable rules and norms off as per applicable rules and norms with necessary approval of the Haryana State with necessary approval of the Haryana Pollution Control Board. State Pollution Control Board. 7. The diesel generator sets to be used during Agreed. During construction phase DG construction phase should be low sulphur sets has been used for office lighting and diesel type and should conform to site lightning. DG sets has been enclosed Environment (Protection) Rules prescribed for with acoustic enclosure. They are running on low sulphur diesel only with the air and noise emission standards. provision of air and noise emission standards as per EPA Rules, 1986. Results of the environmental monitoring carried out at the site are enclosed as Annexure – II. 8. The diesel required for operating DG sets shall Agreed. The diesel required for be stored in underground tanks and if required, operating DG set has been stored in clearance from Chief Controller of Explosives HDPE Drums and log books has been shall be taken. 9. maintained adequately. Ambient noise levels should conform to Agreed, ambient noise levels will be residential standards both during day and conformed to standards both during night. Incremental pollution loads on the day and night. ambient air and noise quality should be closely monitored during construction phase. The silent type DG set with acoustic Adequate measures should be taken to reduce enclosures has installed at project site ambient air and noise level during construction and office. phase, so as to conform to the stipulated Low sulphur fuel is being used residential standards. Exhaust provisions is conforming of to the Environment (Protection) Rules prescribed for air and noise emission standards. All vehicles entering to the site were with valid PUC certificate. All machinery used at the site is new and periodic maintenance of the machinery insured. Results of the environmental monitoring carried out at the site are enclosed as Annexure – II. Shelter belt will be provided to reduce the noise level within the site. 10. Fly ash should be used as building material in Block work bricks are used as building the construction as per the provisions of Fly material. As the bricks contain low Ash Notification of September, 1999 and density that makes it low in Thermal amended as on 27th August, 2003 Conductivity, these bricks act as thermal Insulators which resist the building for being heating. 11. Storm water control and its re-use as per Agreed. Storm water control and its CGWB and BIS standards for various reuse will be maintained as per Central applications should be ensured. Ground Water Board and BIS standards for various applications. 12. Water demand during construction should be Water demand during construction has reduced by use of premixed concrete, curing been reduced by the practice of using agents and other best practices referred. premixed concrete, curing agents and other best practices. 13. In view of severe constrains in water supply Agreed. Ground water will not be augmentation in the region and sustainability extracted for the purpose of construction of water resources, the developer will submit as well as for operation phase of the the NOC from CGWA specifying water project. Water is being supplied by extraction quantities and assurance from HUDA during construction and same HUDA / utility provider indicating source of will be during Operational phase. water supply and quantity of water with details Application has been filled to HUDA for of intended use of water potable and non water supply during operational phase, potable. Assurance is required for both the copy of same is enclosed as construction and operation stages separately. It Annexure- III shall be submitted to the SEIAA/ R.O. MoEF, Chandigarh before the start of construction. 14. Roof should meet prescriptive requirement as Agreed. Roof will be thermal insulated per Energy Conservation Building Code by as per the Energy Conservation Building using appropriate thermal insulation material Code. to fulfill requirement. 15. Opaque wall should meet prescriptive Agreed. Opaque wall will be thermal requirement as per Energy Conservation insulated as per the Energy Conservation Building Code which is proposed to be Building Code. mandatory for all air conditioned spaces while it is inspirational for non-air-conditioned spaces by use of appropriate thermal insulation material to fulfill requirement. 16. The approval of the competent authority shall Agreed, The approval of competent be obtained for structural safety of the authority will be taken for structural building on account of earthquake, adequacy safety of the building due to earthquake, of firefighting equipment, etc. as per National adequacy of firefighting equipment etc. Building Code including protection measures as per National Building Code including from lightening etc. If any forestland is protection measures from lightening etc. involved in the proposed site, clearance under Project site does not fall in Forest area. Forest Conservation Act shall be taken from Application has been filled to DCF for the competent Authority. forest NOC. The copy of same is enclosed as Annexure-IV. 17. Overexploited groundwater and impending Agreed, No ground water extraction will severe shortage of water supply in the region take place. However treated water for requires the developer to redraw the water and construction is being supplied by energy conservation plan. Developer shall HUDA. To reduce the demand in submit details of good practices that have been operation phase treated water from STP included in the project to reduce the overall will be used for horticulture, flushing, footprint of the proposed development cooling, rest will be used in nearby including a detailed water balance along with construction site. As well as efficient source and quantities of potable and non fixture will be used to minimize the potable water requirement (including water water demand for domestic purpose. requirement during incorporating water construction efficiency / phase) Saving measures as well as water reuse/ recycling within 3 months to the SEIAA, Haryana and R.O. MoEF, GOI Chandigarh before the start of construction. 18. The project proponent shall construct 03 Nos. Agreed. 03 rain water harvesting pits rain water harvesting pits for recharging the will be provided for recharging the ground water within the project premises. Rain ground water within the project Water harvesting pits shall be designed to premises. To remove silt and floating make provisions for silting chamber and matter, desilting chamber will be removal of floating matter before entering proposed with rain water harvesting pits. harvesting pit, peak rain fall intensity of Care will be taken that contaminated 45mm/hr must be kept in mind while water will not be entered in any of RWH redesigning RWH pit. Maintenance budget pits. RWH plan with showing the storm and persons responsible for maintenance must water line and RWH pit is enclosed as be provided. Care shall also be taken that Annexure-V. contaminated water do not enter any RWH pit. 19. The Project Proponent shall provide minimum Maximum height of the building will be one Hydraulic ladder of sufficient length for 59.70 m. Maximum height upto which escape of people in case of fire. hydraulic ladder can be provided are 12 m so, permanent ladder will be provided instead of hydraulic ladder. 20. The project proponent shall submit assurance Agreed, acknowledgment letter to from the DHBVN for supply of 1672 kVA of DHBVN for power supply is enclosed as power supply before the start of construction. Annexure-VI. In no case project will be operational solely on generators without any power supply from any external power utility. 21. Detail calculation of power load and ultimate Agreed. Detail calculation of power load power load of the project shall be submitted to and ultimate power load of the project DHBVN under intimation to SEIAA, Haryana shall be submitted to DHBVN, before the start of construction provision shall Application has been filled to DHBVN be made for electrical infrastructure in the copy of same is enclosed as Annexurelicensed area. 22. VI. The project proponent shall obtain NOC from Agreed. NOC from nearest fire station nearest fire station before the start of will construction. 23. be submitted in the next Compliance. The Project proponent shall not raise any Agreed, the project site does not contain construction in the natural land depression/ any natural land depression nallah/ water Nallah/ Water course and shall ensure that the course as well as no natural flow will be natural flow from the Nallah/ Water course is obstructed by the project. not obstructed. 24. The project proponent shall keep the plinth Agreed, The plinth level of the building level of the building blocks sufficiently above block will be above the level of the the level of the approach road to the Group approach road as per the prescribed bye Housing Project as per prescribed bye laws. laws. Levels will be suitably maintained Levels of the other areas in the Group Housing to avoid flooding. Projects shall also be kept suitably so as to avoid flooding. 25. Construction shall be carried out so that Agreed, population density will be as per density of population does not exceed as the approved Building plan by Director approved by Director General Town and General Town and Country Department, Country Department Haryana. 26. Haryana. The Project proponent shall submit an Agreed, Ground water will not be used affidavit with the declaration that ground for the construction activity. No ground water will not be used for construction and water extracted during construction only treated water should be used for affidavit is enclosed as Annexure-VII. construction. 27. The project proponent shall not cut any There is no need to cut the trees, Only existing tree and project landscaping plan small bushes clearing will be required should be modified to include those trees in for construction activity. green area. 28. The project proponent shall provide helipad Agreed. Maximum height of the facility as required under NBC norms and building will be 59.70 m. So there is no shall seek permission of helipad from AAI need to provide Helipad facility accordingly. 29. The project proponent shall ensure that ECBC Agreed, ECBC norms for composite norms for composite climate zone are met. In climate zone, water heating, pumping, Particular building envelope, HVAC service lighting and electrical infrastructure has water heating, pumping, lighting and electrical been followed. infrastructure must meet ECBC norms. 30. The PP shall provide 3 meter high barricade Agreed, 3 meter high barricade around around the project area, dust screen for every the project area and dust screen has been floor above the ground, proper sprinkling and installed during construction. covering of stored material to restrict dust and air pollution during construction. 31. The project proponent shall construct a Agreed. Sedimentation basin has been sedimentation basin in lower level of project constructed to trap pollutants and other site to trap pollutants and other waste during waste during rain. rain. 32. The project proponent shall provide proper Agreed. Proper Rasta of proper width Rasta of proper width and proper strength for and proper strength has been provided. each project before the start of construction. 33. The window wall ratio of the construction Agreed. The window wall ratio of the project should not exceed 40%. construction project will not be exceeded 40%. 34. The project proponent shall keep the plinth Agreed, plinth level of the building has level of the building above the HFL of the said been higher than the 213.575 m i.e. HFL Najafgarh Jheel/drain attained in the last 100 of the Najafgarh Jheel/drain attained in years. the last 100 years. 35. The project proponent shall obtain NOC from Agreed. The application will be filled to HUDA as well as Irrigation Department before HUDA as well as irrigation department. the start of construction, regarding possible adverse effect of project proposal on the said Najafgarh Jheel. 36. The project proponent shall provide all the Agreed. Safety measures for the workers safety measures for the workers during during construction phase have been construction phase of high rise building. 37. provided. The project proponent shall use better U-Value Agreed. glass. 38. The project proponent shall obtain NOC from Agreed. NOC from AAI has been AAI before the start of construction. obtained and is enclosed as AnnexureVIII. 39. The project proponent shall not restrict the Agreed. The PP will not be restrict the village Rasta and shall provide Rasta of proper village Rasta and also will be provide width Rasta of proper width. PART A- SPECIFIC CONDITIONS : Operation Phase a) “Consent to operate” shall be obtained from Agreed. “Consent to operate” will be Haryana State Pollution Control Board under obtained from Haryana State Pollution Air and water Act and a copy shall be Control Board under Air and water Act. submitted to the SEIAA. Haryana. b) The Sewage Treatment Plant (STP) shall be Agreed, The Sewage Treatment Plant installed for the treatment of the sewage to be (STP) will be installed for the treatment prescribed standards including odour and of the sewage to be prescribed standards treated effluent will be recycled to achieve including odour and treated effluent will zero exit discharge. The installation of STP be recycled and used for flushing, should be certified by an independent expert cooling, and rest will be used in nearby and a report in this regard should be submitted construction site. Report of installation to the SEIAA, Haryana before the project is of STP will be submitted to the SEIAA, commissioned for operation. Tertiary Haryana before the project is treatment of waste water is mandatory. commissioned for operation. Discharge Discharge of treated sewage shall conform to of effluent will be conforming to the the norms and standards of HSPCB, norms Panchkula. c) and standards of HSPCB, Panchkula. Separation of the grey and black water should Agreed, grey and black water will be be done by the use of dual plumbing line. separated by the use of dual plumbing Treatment of decentralized 100% treatment grey should water be by line. Agreed, recycled water will be used done for flushing, gardening, cooling and rest ensuring that the recirculated water should will be used for nearby construction site. have BOD maximum upto 10 ppm and the recycled water will be used for flushing, gardening and DG set cooling and running of fountain in the water body to achieve zero exit discharge. d) For disinfection of the treated waste water Agreed, for disinfection of the treated ultra violet radiation or ozonization process waste water ultra violet radiation process should be used. e) will be used. The solid waste generated should be properly Agreed. The solid waste generated will collected and segregated. Bio degradable be properly collected and segregated. waste shall be decomposed at site and dry/ Bio-degradable waste will be inert solid waste should be disposed off to decomposed at site by composting and approved sites for land filling after recovering used as manure, dry/inert solid waste recyclable material. will be disposed off in MSW disposal site. Solid waste management plan is enclosed as Annexure – IX. f) Diesel Power generating sets proposed as Agreed. The location of DG sets will be source of backup power for lifts, common area in basement and conform to rules made illumination and for domestic use should be of under the Environment (Protection) Act, enclosed type and conform to rules made 1986. The diesel used for DG sets will under the Environment (Protection) Act, 1986. be of low sulphur contents (maximum The location of the DG sets should be in the up to 0.25%). basement as promised by the project proponent with appropriate stack height i.e. above the roof level as per the CPCB norms. The diesel used for DG sets should be of low sulphur contents (maximum upto 0.25%) g) Ambient Noise Level should be controlled to Agreed. The Ambient noise level will be ensure that it does not exceed the prescribed controlled that it does not exceed the standards both within and at the boundary of prescribed standards both within and at the proposed residential complex. h) the boundary of the project. The project proponent should maintain at least Agreed. The project proponent is 38.35% as green cover area for tree plantation maintaining at least 38.35% as green especially all around the periphery of the cover area for tree plantation especially project and on the road sides preferably with all around the periphery of the project local species so as to provide protection and on the road sides preferably with against particulates and noise. The 10% open local species so as to provide protection spaces inside the plot should be preferably against particulates and noise. The open landscaped and covered with vegetation/grass, spaces inside the plot will be preferably Herbs& shrubs Only local available plant landscape species shall be used. and vegetation/glass. covered Landscape attached as Annexure-X. with Plan is i) The project proponent shall strive to minimize Agreed. The PP will be minimize water water in irrigation of landscape by minimizing in irrigation of landscape by minimizing grass area, using native variety, xeriscaping grass area, and mulching, utilizing efficient irrigation xeriscaping system, scheduling irrigation checking evapo-transpiration data. only using and native variety, mulching, utilizing after efficient irrigation system, scheduling irrigation only after checking evapotranspiration data. j) Rain water harvesting for roof runoff and Rainwater harvesting as per plan for roof surface runoff, as per plan submitted should be run-off and surface run-off will be implemented. Before recharging the surface implemented. Suspended matter, oil and runoff, pre treatment through sedimentation grease will be removed by treatment tanks must be done to remove suspended before recharging with surface run-off. matter, oil and grease. The bore well for rain The bore well for recharge will be kept water recharging shall be kept at least 5 m at least 5 mts. above the highest ground above the highest ground water table. Care water table. Rain water Harvesting Plan shall be taken that contaminated water do not is enclosed as Annexure-V. enter any RWH pit. k) The ground water level and its quality should Agreed. If required ground water level be monitored regularly in consultation with and its quality will be monitored Central Ground Water Authority. regularly in consultation with Central Ground Water Authority. l) There should be no traffic congestion near the Agreed. Parking will be completely entry and exist points from the roads adjoining internalized and no public space will be the proposed project site. Parking should be utilized. Care will be taken to ensure that fully internalized and no public space should there will be no traffic congestion at the be utilized. entry and exit points. Traffic circulation plan is enclosed as Annexure-XI. m) A report on the energy conservation measures Agreed. Report on energy conservation conforming to energy conservation norms measure conforming to energy finalize by Bureau of Energy Efficiency conservation norms finalized by BEE should be prepared incorporating details about which will include details of building building materials & technology; R & U materials and technology, R & U factors factors etc. and submit to the SEIAA, Haryana etc will be submitted to the SEIAA, in three months time. n) Haryana within three months time. Energy conservation measures like installation Agreed. CFL light will be used in of CFLs/TFLs for lighting the areas outside common areas like lift, corridors, the building should be integral part of the staircase and service areas. CFLs will be project design and should be in place before properly collected and disposed off/sent project commissioning. Used CFLs and TFLs for recycling as per the prevailing should be properly collected and disposed guidelines/rules off/sent for recycling as per the prevailing authority of to the regulatory avoid mercury guidelines/rules of the regulatory authority to contamination. Use of solar panels will avoid mercury contamination. Use of solar be adapted to the maximum extent panels must be adapted to the maximum extent possible for energy conservation. possible for energy conservation. o) The project proponent shall use zero ozone Agreed. The PP will be used zero ozone depleting potential material in insulation, depleting potential material in insulation, refrigeration, air-conditioning. PP shall also refrigeration, air-conditioning and also provide Halon free fire suppression system. provide Halon free fire suppression system. p) The solid waste generated should be properly Agreed, The solid waste generated will collected and segregated as per the be collected and segregated as per the requirement of the MSW Rules, 2000 and as requirement of the MSW Rules, 2000. amended from time to time. The bio- The bio-degradable waste will be degradable waste should be composted by composted at the site earmarked within vermicomposting at the site earmarked within the project area and dry/inert solid waste the project area and dry/inert solid waste will be disposed off to the approved sites should be disposed off to the approved sites for land for land filling after recovering recyclable recyclable material. filling after material. management plan recovering Solid is waste enclosed as Annexure IX. q) The provision of the solar water heating Agreed. Provision of the solar water system shall be as per norms specified by heating system will be as per norms HAREDA and shall be made operational in specified by HAREDA and will be made each building block. r) operational in open spaces and signages. The traffic plan and the parking plan proposed Agreed. The traffic plan and the parking by the PP should be adhered to meticulously plan will be adhered with further scope with further scope of additional parking for of additional parking for future future requirement. There should be no traffic requirement. Parking will be fully congestion near the entry and exit points from internalized and no public space will be the roads adjoining the proposed project site. used. Parking should be fully internalized and no public space should be used. s) The project shall be operationalized only once Agreed, Project will be operationalized HUDA will provide domestic water supply once HUDA will provide domestic water system in the area. t) supply system in the area. Operation and maintenance of STP, solid Agreed. Operation and maintenance of waste management and electrical STP, solid waste management and infrastructure shall be ensured even after the electrical completion of sell. maintained infrastructure by the will be Environment Management Cell. u) Different type of wastes should be disposed Agreed. Municipal solid waste will be off as per provisions of municipal solid waste, disposed as per the Municipal Solid biomedical waste, hazardous waste, e waste, Wastes (Management and Handling) batteries & Environment plastic rules Protection made under Rules, 2000. Biomedical waste will not Act, 1986. be generated by the project. Hazardous Particularly E-waste and Battery waste shall wastes will be handled as per the be disposed of as per existing E-waste Hazardous Waste (Management and Management Rules 2011 Management Rules 2001. and Batteries Handling) Rules 2000. E waste will be The project taken care as per E waste (management proponent should maintain a collection center and Handling) rules 2011 and Plastic for E-waste and it should be disposed of to waste will be handled as per the Plastic only registered and authorized waste (Management and Handling) dismantler/recycler. v) Standards for discharge Rules 2011. of environment Agreed. All the required standard pollutants as enshrined in various schedule of discharge will be followed for discharge rule 3 of Environment Protection Rule 1986 of environment pollutants as enshrined shall be strictly complied with. in various schedule of rule 3 of Environment Protection Rule 1986. w) The project proponent shall make provision Agreed, The PP will be provided guard for guard pond and other provisions for safety pond and safety against failure in the against failure in the operation of wastewater operation of wastewater treatment treatment facilities. The project proponent facilities. The project proponent will shall also identify acceptable outfall for treated also identify acceptable outfall for effluent. x) treated effluent. The project proponent shall ensure that the Agreed. Noise and Air Emission will be emission standards of noise and air with in the as per as CPCB latest standards. CPCB prescribed limits. Noise and Emission level of DG sets greater than 800 Kva shall be as per as CPCB latest standards for high capacity DG sets. y) The project proponent should strive to Agreed. Power factor will be maintained maintain the power factor between 0.98 to 1.0 between 0.98 to 1.0 in order to conserve in order to conserve energy. energy. PART-B GENERAL CONDITIONS I The Project proponent shall ensure the Agreed. All safeguards mentioned in the commitments made in Form-1, Form-1A, Application are implemented during the EIA/EMP and other documents submitted to construction phase and will be the SEIAA for the protection of environment implemented to the maximum possible and proposed environmental safeguards are extent. complied with in letter and spirit. II Six monthly compliance reports should be Agreed. Six monthly compliance reports submitted to the Haryana State Pollution will be submitted to Haryana State Control Board and Regional Office, MOEF, Pollution Control Board and Regional GOI, Northern Region, Chandigarh and a copy Office, MOEF, GOI, Northern Region, to the Regulatory Authority of Haryana. Chandigarh and a copy to the Regulatory Authority of Haryana. One compliance submitted to reports Northern had been Region, Chandigarh and a copy to the SEIAA Panchkula, Haryana SEIAA Panchkula, Haryana. III The SEIAA, Haryana reserves the right to add Agreed, The SEIAA Haryana have additional safeguard measure subsequently, if reserves the right to add additional found necessary. Environmental Clearance safeguard measure subsequently, if granted will be revoked if it is found that false found necessary. information has been given for getting approval of this project. SEIAA reserves the right to revoke the clearance if conditions stipulated are not implemented to the satisfaction of SEIAA/MoEF. IV The Project proponent will not violate any Agreed. There will be no violation of judicial orders/ pronouncements issued by the any judicial Hon’ble Supreme Court/High Courts. issued by order/ the pronouncements Hon’ble Supreme Court/High Courts V All other statutory clearances such as the Agreed, all the required applicable approvals for storage of diesel from Chief clearance will be taken from the Controller of Explosives, Fire Department, respective authority. Civil Aviation Conservation Act, Department, 1980 and Forest Wildlife (Protection) Act, 1972, PLPA, 1900, Forest Act, 1927 etc. shall be obtained, as applicable by project proponents from the respective authorities prior to construction of the project VI The project proponent should inform the Agreed, Advertisement copy of the public that the project has been accorded Environment clearance letter in two Environment Clearance by the SEIAA and local newspapers will be shown in next copies of the clearance letter are available with Compliance. the State Pollution Control Board & SEIAA. This should be advertised within 7 days from the date of issue of the clearance letter at least in two local newspaper that are widely circulated in the region and the copy of the same should be forwarded to SEIAA, Haryana. A copy of Environment Clearance Conditions shall also be put on project proponent web site for public awareness. VII Any appeal against this Environment Not applicable. Clearance shall lie with the National Green Tribunal, if preferred, within a period of 30 days as prescribed under Section 16 of the National Green Tribunal Act, 2010. VIII Corporate Environment The project proponent shall put in place Agreed, Responsibility as mentioned in MOEF, Corporate Environment Policy as mentioned GOI OM No. J-11013/41/2006-IA II (I) in MoEF, GOI OM No. J-11013/41/2006-IA II dated 26.4.2012 will be justified. (I) dated 26.4.2012 within 3 month periods. That the safe and hygienic working conditions have been provided for the workers during construction. That the drinking water and sanitary facilities of the type of mobile sulabh shauchalayas has been provided during construction phase. First aid facilities will be maintained at readily accessible place where necessary appliances including sterilized cotton, wool, etc have been available. Routine inspection, cleaning and maintenance of the site has been occurred. IX The fund ear marked for environment Agreed, The fund earmarked for protection measures should be kept in separate environment protection measures will be account and should not be diverted for other kept in separate account and will not be purposes and year wise expenditure shall be diverted for other purposes and year reported to the SEIAA/ RO MoEF GoI under wise expenditure will be reported to the rules prescribed for Environment Audit. SEIAA/ RO MoEF GoI under rules prescribed for Environment Audit. X The project proponent shall obtain NOC under Agreed. Aravali clearance from Deputy Aravali notification from CEC of hon’ble Commissioner, Gurgaon is enclosed as supreme court regarding coverage under Annexure-XII. Aravali notification.