June 2015 - Regional Office Chandigarh

advertisement
HALF-YEARLY COMPLIANCE OF STIPULATED ENVIRONMENTAL
CONDITIONS/ SAFEGUARDS IN THE ENVIRONMENTAL CLEARANCE
REF. LETTER NO. SEIAA/HR/2013/149 DATED 28.05.2013
FOR “COMMERCIAL” PROJECT
AT VILLAGE Bajghera, SECTOR-114, GURGAON, HARYANA.
BY
M/s Chintels India Ltd.
Sl. No.
Conditions
Status of Compliance
PART A - SPECIFIC CONDITIONS: Construction Phase:1.
“Consent for Establishment” shall be obtained Agreed. “Consent to Establishment” has
from Haryana State Pollution Control Board been obtained from the Haryana State
Under Air and Water act and a copy shall be Pollution Control Board under Air and
submitted to the SEIAA, Haryana before the Water act. Copy of CTE is enclosed as
start of any construction work at site.
2.
Annexure –I.
A first aid room as proposed in the project Agreed. First aid room has been
report will be provided in both during provided during construction phase same
construction and operation phase of the will also be managed during operational
project.
3.
phase.
Adequate drinking water and sanitary facilities Agreed. An adequate drinking water
should be provided for construction workers at facility and community toilet has been
the site. Provision should be made for mobile provided for construction workers at the
toilets. Open defecation by the labors is site.
Provision has been made for
strictly prohibited. The safe disposal of waste mobile toilets. Open defecation by the
water and solid wastes generated during the labors has been strictly prohibited. The
construction phase should be ensured.
wastewater
generated
during
construction phase is being sent to septic
tanks.
Left over cement and mortars, cement
concrete blocks, aggregate, sand and
other inorganic material will be recycled
and reused as granular subbase (GSB)
layer of pavement.
4.
All the top soil excavated during construction Agreed, Separate stock piles had been
activities should be stored for use in maintained. All the top soil excavated
horticulture/landscape development within the during construction activities will be
project site.
stored and utilized in horticulture/
landscape
developments
within
the
project site. The remaining excavated
soil had been utilized in re-filling of
foundation, road works, rising of site
level etc.
5.
The project proponent shall ensure that the Agreed, The building material required
building material required during construction during construction phase have been
phase is properly stored with in the project properly stored with in the project area
area and disposal of construction waste should and disposal of construction waste does
not
create
any
adverse
effect
on
the not create any adverse effects on the
neighboring communities and should be neighboring communities and is being
disposed of after taking necessary precautions disposed off by taking the necessary
for general safety and health aspects of people, precautions for general safety and health
only in approved sites with the approval of aspects of people, only in approved sites
competent authority.
with
the
approval
of
competent
authority.
6.
Construction spoils, including bituminous Agreed, Construction spoils including
material and other hazardous materials, must bituminous material and other hazardous
not be allowed to contaminate watercourses materials will not being allowed to
and the dump sites for such material must be contaminate water courses and the dump
secured so that they should not leach into the sites for such material will be secured so
ground water and any hazardous waste that they should not leach into the
generated during construction phase, should be ground water. Materials will be disposed
disposed off as per applicable rules and norms off as per applicable rules and norms
with necessary approval of the Haryana State with necessary approval of the Haryana
Pollution Control Board.
State Pollution Control Board.
7.
The diesel generator sets to be used during Agreed. During construction phase DG
construction phase should be low sulphur sets has been used for office lighting and
diesel
type
and
should
conform
to site lightning. DG sets has been enclosed
Environment (Protection) Rules prescribed for with acoustic enclosure. They are running
on low sulphur diesel only with the
air and noise emission standards.
provision
of
air
and
noise
emission
standards as per EPA Rules, 1986.
Results of the environmental monitoring
carried out at the site are enclosed as
Annexure – II.
8.
The diesel required for operating DG sets shall Agreed.
The
diesel
required
for
be stored in underground tanks and if required, operating DG set has been stored in
clearance from Chief Controller of Explosives HDPE Drums and log books has been
shall be taken.
9.
maintained adequately.
Ambient noise levels should conform to  Agreed, ambient noise levels will be
residential standards both during day and
conformed to standards both during
night. Incremental pollution loads on the
day and night.
ambient air and noise quality should be closely
monitored
during
construction
phase.  The silent type DG set with acoustic
Adequate measures should be taken to reduce
enclosures has installed at project site
ambient air and noise level during construction
and office.
phase, so as to conform to the stipulated  Low sulphur fuel is being used
residential standards.
 Exhaust
provisions
is
conforming
of
to
the
Environment
(Protection) Rules prescribed for air
and noise emission standards.
 All vehicles entering to the site were
with valid PUC certificate.
 All machinery used at the site is new
and periodic maintenance of the
machinery insured.
 Results
of
the
environmental
monitoring carried out at the site are
enclosed as Annexure – II.
 Shelter belt will be provided to reduce
the noise level within the site.
10.
Fly ash should be used as building material in Block work bricks are used as building
the construction as per the provisions of Fly material. As the bricks contain low
Ash Notification of September, 1999 and density that makes it low in Thermal
amended as on 27th August, 2003
Conductivity, these bricks act as thermal
Insulators which resist the building for
being heating.
11.
Storm water control and its re-use as per Agreed. Storm water control and its
CGWB and BIS standards for various reuse will be maintained as per Central
applications should be ensured.
Ground Water Board and BIS standards
for various applications.
12.
Water demand during construction should be Water demand during construction has
reduced by use of premixed concrete, curing been reduced by the practice of using
agents and other best practices referred.
premixed concrete, curing agents and
other best practices.
13.
In view of severe constrains in water supply Agreed. Ground water will not be
augmentation in the region and sustainability extracted for the purpose of construction
of water resources, the developer will submit as well as for operation phase of the
the NOC from CGWA specifying water project. Water is being supplied by
extraction quantities and assurance from HUDA during construction and same
HUDA / utility provider indicating source of will
be
during
Operational
phase.
water supply and quantity of water with details Application has been filled to HUDA for
of intended use of water potable and non water supply during operational phase,
potable. Assurance is required for both the copy of same is enclosed as
construction and operation stages separately. It Annexure- III
shall be submitted to the SEIAA/ R.O. MoEF,
Chandigarh before the start of construction.
14.
Roof should meet prescriptive requirement as Agreed. Roof will be thermal insulated
per Energy Conservation Building Code by as per the Energy Conservation Building
using appropriate thermal insulation material Code.
to fulfill requirement.
15.
Opaque
wall
should
meet
prescriptive Agreed. Opaque wall will be thermal
requirement as per Energy Conservation insulated as per the Energy Conservation
Building Code which is proposed to be Building Code.
mandatory for all air conditioned spaces while
it is inspirational for non-air-conditioned
spaces by use of appropriate thermal insulation
material to fulfill requirement.
16.
The approval of the competent authority shall Agreed, The approval of competent
be obtained for structural safety of the authority will be taken for structural
building on account of earthquake, adequacy safety of the building due to earthquake,
of firefighting equipment, etc. as per National adequacy of firefighting equipment etc.
Building Code including protection measures as per National Building Code including
from lightening etc. If any forestland is protection measures from lightening etc.
involved in the proposed site, clearance under Project site does not fall in Forest area.
Forest Conservation Act shall be taken from Application has been filled to DCF for
the competent Authority.
forest NOC. The copy of same is
enclosed as Annexure-IV.
17.
Overexploited groundwater and impending Agreed, No ground water extraction will
severe shortage of water supply in the region take place. However treated water for
requires the developer to redraw the water and construction
is
being
supplied
by
energy conservation plan. Developer shall HUDA. To reduce the demand in
submit details of good practices that have been operation phase treated water from STP
included in the project to reduce the overall will be used for horticulture, flushing,
footprint
of
the
proposed
development cooling, rest will be used in nearby
including a detailed water balance along with construction site. As well as efficient
source and quantities of potable and non fixture will be used to minimize the
potable water requirement (including
water water demand for domestic purpose.
requirement
during
incorporating
water
construction
efficiency
/
phase)
Saving
measures as well as water reuse/ recycling
within 3 months to the SEIAA, Haryana and
R.O. MoEF, GOI Chandigarh before the start
of construction.
18.
The project proponent shall construct 03 Nos. Agreed. 03 rain water harvesting pits
rain water harvesting pits for recharging the will be provided for recharging the
ground water within the project premises. Rain ground
water
within
the
project
Water harvesting pits shall be designed to premises. To remove silt and floating
make provisions for silting chamber and matter,
desilting
chamber
will
be
removal of floating matter before entering proposed with rain water harvesting pits.
harvesting pit, peak rain fall intensity of Care will be taken that contaminated
45mm/hr must be kept in mind while water will not be entered in any of RWH
redesigning RWH pit. Maintenance budget pits. RWH plan with showing the storm
and persons responsible for maintenance must water line and RWH pit is enclosed as
be provided. Care shall also be taken that Annexure-V.
contaminated water do not enter any RWH pit.
19.
The Project Proponent shall provide minimum Maximum height of the building will be
one Hydraulic ladder of sufficient length for 59.70 m. Maximum height upto which
escape of people in case of fire.
hydraulic ladder can be provided are 12
m so, permanent ladder will be provided
instead of hydraulic ladder.
20.
The project proponent shall submit assurance Agreed,
acknowledgment
letter
to
from the DHBVN for supply of 1672 kVA of DHBVN for power supply is enclosed as
power supply before the start of construction. Annexure-VI.
In no case project will be operational solely on
generators without any power supply from any
external power utility.
21.
Detail calculation of power load and ultimate Agreed. Detail calculation of power load
power load of the project shall be submitted to and ultimate power load of the project
DHBVN under intimation to SEIAA, Haryana shall
be
submitted
to
DHBVN,
before the start of construction provision shall Application has been filled to DHBVN
be made for electrical infrastructure in the copy of same is enclosed as Annexurelicensed area.
22.
VI.
The project proponent shall obtain NOC from Agreed. NOC from nearest fire station
nearest fire station before the start of will
construction.
23.
be
submitted
in
the
next
Compliance.
The Project proponent shall not raise any Agreed, the project site does not contain
construction in the natural land depression/ any natural land depression nallah/ water
Nallah/ Water course and shall ensure that the course as well as no natural flow will be
natural flow from the Nallah/ Water course is obstructed by the project.
not obstructed.
24.
The project proponent shall keep the plinth Agreed, The plinth level of the building
level of the building blocks sufficiently above block will be above the level of the
the level of the approach road to the Group approach road as per the prescribed bye
Housing Project as per prescribed bye laws. laws. Levels will be suitably maintained
Levels of the other areas in the Group Housing to avoid flooding.
Projects shall also be kept suitably so as to
avoid flooding.
25.
Construction shall be carried out so that Agreed, population density will be as per
density of population does not exceed as the approved Building plan by Director
approved by Director General Town and General Town and Country Department,
Country Department Haryana.
26.
Haryana.
The Project proponent shall submit an Agreed, Ground water will not be used
affidavit with the declaration that ground for the construction activity. No ground
water will not be used for construction and water
extracted
during
construction
only treated water should be used for affidavit is enclosed as Annexure-VII.
construction.
27.
The project proponent shall not cut any There is no need to cut the trees, Only
existing tree and project landscaping plan small bushes clearing will be required
should be modified to include those trees in for construction activity.
green area.
28.
The project proponent shall provide helipad Agreed.
Maximum
height
of
the
facility as required under NBC norms and building will be 59.70 m. So there is no
shall seek permission of helipad from AAI need to provide Helipad facility
accordingly.
29.
The project proponent shall ensure that ECBC Agreed, ECBC norms for composite
norms for composite climate zone are met. In climate zone, water heating, pumping,
Particular building envelope, HVAC service lighting and electrical infrastructure has
water heating, pumping, lighting and electrical been followed.
infrastructure must meet ECBC norms.
30.
The PP shall provide 3 meter high barricade Agreed, 3 meter high barricade around
around the project area, dust screen for every the project area and dust screen has been
floor above the ground, proper sprinkling and installed during construction.
covering of stored material to restrict dust and
air pollution during construction.
31.
The project proponent shall construct a Agreed. Sedimentation basin has been
sedimentation basin in lower level of project constructed to trap pollutants and other
site to trap pollutants and other waste during waste during rain.
rain.
32.
The project proponent shall provide proper Agreed. Proper Rasta of proper width
Rasta of proper width and proper strength for and proper strength has been provided.
each project before the start of construction.
33.
The window wall ratio of the construction Agreed. The window wall ratio of the
project should not exceed 40%.
construction project will not be exceeded
40%.
34.
The project proponent shall keep the plinth Agreed, plinth level of the building has
level of the building above the HFL of the said been higher than the 213.575 m i.e. HFL
Najafgarh Jheel/drain attained in the last 100 of the Najafgarh Jheel/drain attained in
years.
the last 100 years.
35.
The project proponent shall obtain NOC from Agreed. The application will be filled to
HUDA as well as Irrigation Department before HUDA as well as irrigation department.
the start of construction, regarding possible
adverse effect of project proposal on the said
Najafgarh Jheel.
36.
The project proponent shall provide all the Agreed. Safety measures for the workers
safety measures for the workers during during construction phase have been
construction phase of high rise building.
37.
provided.
The project proponent shall use better U-Value Agreed.
glass.
38.
The project proponent shall obtain NOC from Agreed. NOC from AAI has been
AAI before the start of construction.
obtained and is enclosed as AnnexureVIII.
39.
The project proponent shall not restrict the Agreed. The PP will not be restrict the
village Rasta and shall provide Rasta of proper village Rasta and also will be provide
width
Rasta of proper width.
PART A- SPECIFIC CONDITIONS : Operation Phase
a)
“Consent to operate” shall be obtained from Agreed. “Consent to operate” will be
Haryana State Pollution Control Board under obtained from Haryana State Pollution
Air and water Act and a copy shall be Control Board under Air and water Act.
submitted to the SEIAA. Haryana.
b)
The Sewage Treatment Plant (STP) shall be Agreed, The Sewage Treatment Plant
installed for the treatment of the sewage to be (STP) will be installed for the treatment
prescribed standards including odour and of the sewage to be prescribed standards
treated effluent will be recycled to achieve including odour and treated effluent will
zero exit discharge. The installation of STP be recycled and used for flushing,
should be certified by an independent expert cooling, and rest will be used in nearby
and a report in this regard should be submitted construction site. Report of installation
to the SEIAA, Haryana before the project is of STP will be submitted to the SEIAA,
commissioned
for
operation.
Tertiary Haryana
before
the
project
is
treatment of waste water is mandatory. commissioned for operation. Discharge
Discharge of treated sewage shall conform to of effluent will be conforming to the
the
norms
and
standards
of
HSPCB, norms
Panchkula.
c)
and
standards
of
HSPCB,
Panchkula.
Separation of the grey and black water should Agreed, grey and black water will be
be done by the use of dual plumbing line. separated by the use of dual plumbing
Treatment
of
decentralized
100%
treatment
grey
should
water
be
by line. Agreed, recycled water will be used
done for flushing, gardening, cooling and rest
ensuring that the recirculated water should will be used for nearby construction site.
have BOD maximum upto 10 ppm and the
recycled water will be used for flushing,
gardening and DG set cooling and running of
fountain in the water body to achieve zero exit
discharge.
d)
For disinfection of the treated waste water Agreed, for disinfection of the treated
ultra violet radiation or ozonization process waste water ultra violet radiation process
should be used.
e)
will be used.
The solid waste generated should be properly Agreed. The solid waste generated will
collected and segregated. Bio degradable be properly collected and segregated.
waste shall be decomposed at site and dry/ Bio-degradable
waste
will
be
inert solid waste should be disposed off to decomposed at site by composting and
approved sites for land filling after recovering used as manure, dry/inert solid waste
recyclable material.
will be disposed off in MSW disposal
site. Solid waste management plan is
enclosed as Annexure – IX.
f)
Diesel Power generating sets proposed as Agreed. The location of DG sets will be
source of backup power for lifts, common area in basement and conform to rules made
illumination and for domestic use should be of under the Environment (Protection) Act,
enclosed type and conform to rules made 1986. The diesel used for DG sets will
under the Environment (Protection) Act, 1986. be of low sulphur contents (maximum
The location of the DG sets should be in the up to 0.25%).
basement
as
promised
by
the
project
proponent with appropriate stack height i.e.
above the roof level as per the CPCB norms.
The diesel used for DG sets should be of low
sulphur contents (maximum upto 0.25%)
g)
Ambient Noise Level should be controlled to Agreed. The Ambient noise level will be
ensure that it does not exceed the prescribed controlled that it does not exceed the
standards both within and at the boundary of prescribed standards both within and at
the proposed residential complex.
h)
the boundary of the project.
The project proponent should maintain at least Agreed.
The
project
proponent
is
38.35% as green cover area for tree plantation maintaining at least 38.35% as green
especially all around the periphery of the cover area for tree plantation especially
project and on the road sides preferably with all around the periphery of the project
local species so as to provide protection and on the road sides preferably with
against particulates and noise. The 10% open local species so as to provide protection
spaces inside the plot should be preferably against particulates and noise. The open
landscaped and covered with vegetation/grass, spaces inside the plot will be preferably
Herbs& shrubs Only local available plant landscape
species shall be used.
and
vegetation/glass.
covered
Landscape
attached as Annexure-X.
with
Plan
is
i)
The project proponent shall strive to minimize Agreed. The PP will be minimize water
water in irrigation of landscape by minimizing in irrigation of landscape by minimizing
grass area, using native variety, xeriscaping grass
area,
and mulching, utilizing efficient irrigation xeriscaping
system,
scheduling
irrigation
checking evapo-transpiration data.
only
using
and
native
variety,
mulching,
utilizing
after efficient irrigation system, scheduling
irrigation only after checking evapotranspiration data.
j)
Rain water harvesting for roof runoff and Rainwater harvesting as per plan for roof
surface runoff, as per plan submitted should be run-off and surface run-off will be
implemented. Before recharging the surface implemented. Suspended matter, oil and
runoff, pre treatment through sedimentation grease will be removed by treatment
tanks must be done to remove suspended before recharging with surface run-off.
matter, oil and grease. The bore well for rain The bore well for recharge will be kept
water recharging shall be kept at least 5 m at least 5 mts. above the highest ground
above the highest ground water table. Care water table. Rain water Harvesting Plan
shall be taken that contaminated water do not is enclosed as Annexure-V.
enter any RWH pit.
k)
The ground water level and its quality should Agreed. If required ground water level
be monitored regularly in consultation with and its quality will be monitored
Central Ground Water Authority.
regularly in consultation with Central
Ground Water Authority.
l)
There should be no traffic congestion near the Agreed. Parking will be completely
entry and exist points from the roads adjoining internalized and no public space will be
the proposed project site. Parking should be utilized. Care will be taken to ensure that
fully internalized and no public space should there will be no traffic congestion at the
be utilized.
entry and exit points. Traffic circulation
plan is enclosed as Annexure-XI.
m)
A report on the energy conservation measures Agreed. Report on energy conservation
conforming to energy conservation norms measure
conforming
to
energy
finalize by Bureau of Energy Efficiency conservation norms finalized by BEE
should be prepared incorporating details about which will include details of building
building materials & technology; R & U materials and technology, R & U factors
factors etc. and submit to the SEIAA, Haryana etc will be submitted to the SEIAA,
in three months time.
n)
Haryana within three months time.
Energy conservation measures like installation Agreed. CFL light will be used in
of CFLs/TFLs for lighting the areas outside common
areas
like
lift,
corridors,
the building should be integral part of the staircase and service areas. CFLs will be
project design and should be in place before properly collected and disposed off/sent
project commissioning. Used CFLs and TFLs for recycling as per the prevailing
should be properly collected and disposed guidelines/rules
off/sent for recycling as per the prevailing authority
of
to
the
regulatory
avoid
mercury
guidelines/rules of the regulatory authority to contamination. Use of solar panels will
avoid mercury contamination. Use of solar be adapted to the maximum extent
panels must be adapted to the maximum extent possible for energy conservation.
possible for energy conservation.
o)
The project proponent shall use zero ozone Agreed. The PP will be used zero ozone
depleting potential material in insulation, depleting potential material in insulation,
refrigeration, air-conditioning. PP shall also refrigeration, air-conditioning and also
provide Halon free fire suppression system.
provide Halon free fire suppression
system.
p)
The solid waste generated should be properly Agreed, The solid waste generated will
collected
and
segregated
as
per
the be collected and segregated as per the
requirement of the MSW Rules, 2000 and as requirement of the MSW Rules, 2000.
amended from time to time. The bio- The
bio-degradable
waste
will
be
degradable waste should be composted by composted at the site earmarked within
vermicomposting at the site earmarked within the project area and dry/inert solid waste
the project area and dry/inert solid waste will be disposed off to the approved sites
should be disposed off to the approved sites for
land
for land filling after recovering recyclable recyclable
material.
filling
after
material.
management
plan
recovering
Solid
is
waste
enclosed
as
Annexure IX.
q)
The provision of the solar water heating Agreed. Provision of the solar water
system shall be as per norms specified by heating system will be as per norms
HAREDA and shall be made operational in specified by HAREDA and will be made
each building block.
r)
operational in open spaces and signages.
The traffic plan and the parking plan proposed Agreed. The traffic plan and the parking
by the PP should be adhered to meticulously plan will be adhered with further scope
with further scope of additional parking for of
additional
parking
for
future
future requirement. There should be no traffic requirement. Parking will be fully
congestion near the entry and exit points from internalized and no public space will be
the roads adjoining the proposed project site. used.
Parking should be fully internalized and no
public space should be used.
s)
The project shall be operationalized only once Agreed, Project will be operationalized
HUDA will provide domestic water supply once HUDA will provide domestic water
system in the area.
t)
supply system in the area.
Operation and maintenance of STP, solid Agreed. Operation and maintenance of
waste
management
and
electrical STP, solid waste management and
infrastructure shall be ensured even after the electrical
completion of sell.
maintained
infrastructure
by
the
will
be
Environment
Management Cell.
u)
Different type of wastes should be disposed Agreed. Municipal solid waste will be
off as per provisions of municipal solid waste, disposed as per the Municipal Solid
biomedical waste, hazardous waste, e waste, Wastes (Management and Handling)
batteries
&
Environment
plastic
rules
Protection
made
under Rules, 2000. Biomedical waste will not
Act,
1986. be generated by the project. Hazardous
Particularly E-waste and Battery waste shall wastes will be handled as per the
be disposed of as per existing E-waste Hazardous Waste (Management and
Management
Rules
2011
Management
Rules
2001.
and
Batteries Handling) Rules 2000. E waste will be
The
project taken care as per E waste (management
proponent should maintain a collection center and Handling) rules 2011 and Plastic
for E-waste and it should be disposed of to waste will be handled as per the Plastic
only
registered
and
authorized waste
(Management
and
Handling)
dismantler/recycler.
v)
Standards
for
discharge
Rules 2011.
of
environment Agreed.
All
the
required
standard
pollutants as enshrined in various schedule of discharge will be followed for discharge
rule 3 of Environment Protection Rule 1986 of environment pollutants as enshrined
shall be strictly complied with.
in various schedule of rule 3 of
Environment Protection Rule 1986.
w)
The project proponent shall make provision Agreed, The PP will be provided guard
for guard pond and other provisions for safety pond and safety against failure in the
against failure in the operation of wastewater operation
of
wastewater
treatment
treatment facilities. The project proponent facilities. The project proponent will
shall also identify acceptable outfall for treated also identify acceptable outfall for
effluent.
x)
treated effluent.
The project proponent shall ensure that the Agreed. Noise and Air Emission will be
emission standards of noise and air with in the as per as CPCB latest standards.
CPCB prescribed limits. Noise and Emission
level of DG sets greater than 800 Kva shall be
as per as CPCB latest standards for high
capacity DG sets.
y)
The project proponent should strive to Agreed. Power factor will be maintained
maintain the power factor between 0.98 to 1.0 between 0.98 to 1.0 in order to conserve
in order to conserve energy.
energy.
PART-B GENERAL CONDITIONS
I
The Project proponent shall ensure the Agreed. All safeguards mentioned in the
commitments made in Form-1, Form-1A, Application are implemented during the
EIA/EMP and other documents submitted to construction
phase
and
will
be
the SEIAA for the protection of environment implemented to the maximum possible
and proposed environmental safeguards are extent.
complied with in letter and spirit.
II
Six monthly compliance reports should be Agreed. Six monthly compliance reports
submitted to the Haryana State Pollution will be submitted to Haryana State
Control Board and Regional Office, MOEF, Pollution Control Board and Regional
GOI, Northern Region, Chandigarh and a copy Office, MOEF, GOI, Northern Region,
to the Regulatory Authority of Haryana.
Chandigarh and a copy to the Regulatory
Authority of Haryana.
One
compliance
submitted
to
reports
Northern
had
been
Region,
Chandigarh and a copy to the SEIAA
Panchkula, Haryana SEIAA Panchkula,
Haryana.
III
The SEIAA, Haryana reserves the right to add Agreed, The SEIAA Haryana have
additional safeguard measure subsequently, if reserves the right to add additional
found necessary. Environmental Clearance safeguard
measure
subsequently,
if
granted will be revoked if it is found that false found necessary.
information has been given for getting
approval of this project. SEIAA reserves the
right to revoke the clearance if conditions
stipulated
are
not
implemented
to
the
satisfaction of SEIAA/MoEF.
IV
The Project proponent will not violate any Agreed. There will be no violation of
judicial orders/ pronouncements issued by the any judicial
Hon’ble Supreme Court/High Courts.
issued
by
order/
the
pronouncements
Hon’ble
Supreme
Court/High Courts
V
All other statutory clearances such as the
Agreed, all the required applicable
approvals for storage of diesel from Chief clearance will be taken from the
Controller of Explosives, Fire Department, respective authority.
Civil
Aviation
Conservation
Act,
Department,
1980
and
Forest
Wildlife
(Protection) Act, 1972, PLPA, 1900, Forest
Act, 1927 etc. shall be obtained, as applicable
by project proponents from the respective
authorities prior to construction of the project
VI
The project proponent should inform the Agreed, Advertisement copy of the
public that the project has been accorded Environment clearance letter in two
Environment Clearance by the SEIAA and local newspapers will be shown in next
copies of the clearance letter are available with Compliance.
the State Pollution Control Board & SEIAA.
This should be advertised within 7 days from
the date of issue of the clearance letter at least
in two local newspaper that are widely
circulated in the region and the copy of the
same
should
be
forwarded
to
SEIAA,
Haryana. A copy of Environment Clearance
Conditions shall also be put on project
proponent web site for public awareness.
VII
Any
appeal
against
this
Environment Not applicable.
Clearance shall lie with the National Green
Tribunal, if preferred, within a period of 30
days as prescribed under Section 16 of the
National Green Tribunal Act, 2010.
VIII
Corporate Environment
The project proponent shall put in place Agreed,
Responsibility as mentioned in MOEF,
Corporate Environment Policy as mentioned
GOI OM No. J-11013/41/2006-IA II (I)
in MoEF, GOI OM No. J-11013/41/2006-IA II dated 26.4.2012 will be justified.
(I) dated 26.4.2012 within 3 month periods.
That
the
safe
and
hygienic
working
conditions have been provided for the
workers during construction.
That the drinking water and sanitary
facilities of the type of mobile sulabh
shauchalayas has been provided during
construction phase.
First aid facilities will be maintained at
readily accessible place where necessary
appliances including sterilized cotton, wool,
etc have been available.
Routine
inspection,
cleaning
and
maintenance of the site has been occurred.
IX
The fund
ear marked for
environment Agreed,
The
fund
earmarked
for
protection measures should be kept in separate environment protection measures will be
account and should not be diverted for other kept in separate account and will not be
purposes and year wise expenditure shall be diverted for other purposes and year
reported to the SEIAA/ RO MoEF GoI under wise expenditure will be reported to the
rules prescribed for Environment Audit.
SEIAA/ RO MoEF GoI under rules
prescribed for Environment Audit.
X
The project proponent shall obtain NOC under Agreed. Aravali clearance from Deputy
Aravali notification from CEC of hon’ble Commissioner, Gurgaon is enclosed as
supreme court regarding coverage under Annexure-XII.
Aravali notification.