POINT-WISE COMPLIANCE OF STIPULATED ENVIRONMENTAL

advertisement
POINT-WISE COMPLIANCE OF STIPULATED ENVIRONMENTAL
CONDITIONS/ SAFEGUARDS IN THE
ENVIRONMENTAL CLEARANCE
LETTER NO. SEIAA/HR/2013/283
DATED 17thJune, 2013
Tata Center- Mixed Use Development Project,
Sector-72, Gurgaon, Haryana
Sl.
Conditions
Status of Compliance
No.
PART A – SPECIFIC CONDITIONS:
Construction Phase 1
“Consent to Establish” shall be obtained from Agreed. “Consent to Establish” has been
Haryana State Pollution Control Board under obtained from Haryana State Pollution
Air and Water Act and a copy shall be Control Board under Air and Water Act
submitted to the SEIAA, Haryana before the and has been submitted to SEIAA, Haryana
start of any construction work at site.
before the start of construction work at site.
A copy of “Consent to Establish” is
enclosed as Annexure-I.
2
A first aid room as proposed in the project Agreed. A first aid room is being provided
report
shall
be
provided
both
during during the construction phase and will be
construction and operation phase of the maintained during operation phase of the
project.
3
Adequate
project.
drinking
water
and
sanitary Agreed. Adequate drinking water and
facilities should be provided for construction sanitary facilities are being provided for
workers at the site. Provision should be made construction workers at site. Provisions are
for mobile toilets. Open defecation by there for mobile toilets. The safe disposal
laboures is strictly prohibited. The safe of waste-water and solid wastes generated
disposal of waste water and solid wastes during the construction phase is being
generated during the construction phase ensured.
should be ensured.
Page 1 of 18
4
All top soil excavated during construction Agreed. All the top soil excavated during
activities should be stored for use in the
construction
activities
has
been
horticulture/landscape development within the properly stored and shall be utilized for the
project site.
horticulture/landscape development within
the site.
5
The project proponent shall ensure that the Agreed. It is being ensured that the
building material required during construction building
material
required
during
phase is properly stored within the project construction phase is being properly stored
area and disposal of construction waste should within the project area and construction
not create any adverse effect on the waste is being used for site development
neighboring communities and should be and land filling of the project site, it will
disposed of after taking necessary precautions not create any adverse effect on the
for general safety and health aspects of neighboring communities.
people, only in approved sites with the
approval of competent authority.
6
Construction spoils, including bituminous Agreed. Construction spoils are being
material and other hazardous materials, must used for site development and land filling
not be allowed to contaminate watercourses of
the
project
site,
other
hazardous
and dump sites for such material must be materials will be disposed-off as per norms
secured so that they should not leach into the
ground water and any hazardous waste
generated during construction phase, should
be disposed off as per applicable rules and
norms with necessary approval of the Haryana
state Pollution Control Board.
7
The diesel generator sets to be used during Agreed. D.G sets are run on low sulphur
construction phase should be of ultra low diesel, conforming to Noise & National Air
sulphur diesel type and should confirm to Quality Standards.
Environment (Protection) Rules prescribed for
air and noise emission standards.
8
The diesel required for operating DG sets Agreed. The diesel required for operating
Page 2 of 18
shall be stored in underground tanks and if DG set is being stored in specific drums
required, clearance from Chief Controller of and log books are also being managed for
Explosives shall be taken.
accountability.
Storage
is
within
the
threshold limit hence clearance from chief
control of explosive is not required.
9
Ambient noise levels should confirm to the Agreed. Ambient noise levels will confirm
residential standards both during day and to the residential standards both during day
night. Incremental pollution loads on the and night. Incremental pollution loads on
ambient air and noise quality should be the ambient air and noise quality is being
closely monitored during the construction closely monitored. during the construction
phase. Adequate measures should be taken to phase. Adequate measures are being taken
reduce ambient air and noise level during to reduce ambient air and noise level during
construction phase, so as to confirm to the construction phase to confirm to the
stipulated residential standards.
stipulated
residential
standards.
Noise
quality data monitored in March’14 is
enclosed as Annexure-II.
10
Fly ash should be used as building material in Agreed. Fly ash based material/ products
the construction as per the provisions of Fly as per the provisions of fly ash notification
Ash Notification of September 1999 and as of September, 1999 and as amended on
amended on 27th August 2003.
27th August, 2003 shall be used by the
construction agency.
11
Storm water control and its re-use as CGWB Agreed. Storm water will be collected to
and BIS standards for various applications recharge the ground water, 08 RWH pits
should be ensured.
are proposed to be constructed within the
project site for this purpose
12
Water demand during construction should be Agreed. Water demand during construction
reduced by use of pre-mixed concrete, curing shall be reduced by use of pre-mixed
agents and other best practices.
concrete, curing agents and other best
practices.
13
In view of the severe constrains in water Agreed.
Page 3 of 18
No
ground
water
is
being
supply augmentation in the region and extracted during the construction as well as
sustainability
of
water
resources,
the operation phase. So, CGWB permission is
developer will submit the NOC from CGWB not required. However during construction
specifying water extraction quantities and phase water is being supplied by HUDA
assurance
from
HUDA/utility
provider (Treated Water), permission letter from
indicating source of water supply and quantity HUDA is enclosed as Annexure-III &
of water with details of intended use of water during operation phase HUDA will supply
– potable and non-potable. Assurance is fresh water, copy of acknowledgement is
required for both construction and operation enclosed as Annexure-IV.
stages separately. It shall be submitted to the
SEIAA and RO, MOEF, Chandigarh before
the start of construction.
14
Roof should meet prescriptive requirement as Agreed. During construction phase care is
per Energy Conservation Building Code by being taken that roof area meets Energy
using appropriate thermal insulation material.
Conservation Building Code requirement
by using appropriate thermal insulation
material to fulfill requirement.
15
Opaque
wall
should
meet
prescriptive Agreed. Material having appropriate R &
requirement as per Energy Conservation U value shall be used to meet prescriptive
Building Code which is proposed to be requirement of opaque wall as per energy
mandatory for all air conditioned spaces while conservation building Code.
it is aspirational for non-air-conditioned
spaces
by
use
of
appropriate
thermal
insulation material to fulfill requirement.
16
The approval of the competent authority shall Agreed. The approval of the competent
be obtained for structural safety of the authority is being obtained for structural
building on account of earthquake, adequacy safety of the building on account of
of fire-fighting equipment, etc. as per earthquake,
adequacy
of
fire-fighting
National Building Code including protection equipment, etc. as per National Building
measures from lightening etc. If any forest Code including protection measures from
land is involved in the proposal site, clearance lightening etc.
Page 4 of 18
under Forest Conservation Act shall be The project site does not fall under the
obtained from the competent authority.
Forest area. The Forest NOC has been
obtained from the Deputy commissioner. A
copy of the Forest NOC is enclosed as
Annexure-V
17
Overexploited groundwater and impending Agreed. The water reuse/recycling and
severe shortage of water supply in the region water efficiency/saving measures are being
requires the developers to redraw the water incorporated within 3 months and before
and energy conservation plan. Developer shall start of construction to SEIAA, Haryana
reduce the overall footprint of the proposed and RO, MOEF, GOI, Chandigarh.
development.
Project
proponent
shall
incorporate water efficiency/savings measures
as well as water reuse/recycling within 3
months and before start of construction to the
SEIAA, Haryana and RO, MOEF, GOI,
Chandigarh.
18
The project proponent shall construct 08 rain Agreed. 8 rain water harvesting pits for
water harvesting pits for recharging the recharging the ground water within the
ground water within the project premises. project premises shall be constructed. Rain
Rain water harvesting pits shall be designed water harvesting pits are being designed to
to make provisions for silting chamber and make provisions for silting chamber and
removal of floating matter before entering removal of floating matter before entering
harvesting pit. Maintenance budget and harvesting pit. Maintenance budget and
persons responsible for maintenance must be persons responsible for maintenance are
provided. Care shall also be taken that being provided and care shall also be taken
contaminated water do not enter any RWH that contaminated water do not enter any
pit.
RWH pit.Storm water plan showing the
RWH
pit
location
is
enclosed
as
Annexure-VI.
19
The project proponent will provide minimum Agreed, Since hydraulic ladder can be
one hydraulic ladder for escape of people in provided upto only 12m, so permanent
Page 5 of 18
case of fire.
ladder is
being provided instead of
hydraulic ladder.
20
The project proponent shall submit assurance Agreed. An application has been filled to
from the DHBVN for supply of 5016 KVA of the
Superintending
Engineer
NCR
power supply before the start of the Planning. The copy of the same is enclosed
construction. In no case project will be as Annexure VII.
operational solely on generators without any
power supply from any external power utility.
21
Detail calculation of power load and ultimate Agreed. The total power requirement is
power load of the project shall be submitted to 5016 KVA that will be supplied by
DHBVN under intimation to SEIAA Haryana DHBVN.
The
detailed
power
load
before the start of the construction. Provisions calculation has been submitted to the
shall be made for electrical infrastructure in DHBVN. An application has been filled to
the project area.
the
Superintending
Engineer
NCR
Planning. The copy of the same is enclosed
as AnnexureVII.
22
The project proponent shall obtain NOC from Agreed. NOC from the nearest fire station
the nearest fire station before start of the before the start of the construction is being
construction.
23
obtained.
The project proponent shall not raise any Agreed. The project site does not contain
construction
in
the
natural
land any natural land depression Nallah/ water
depression/Nallah/water course and shall course as well as no natural flow is
ensure that the natural flow from the obstructed by the project.
Nallah/water course is not obstructed.
24
The project proponent shall keep the plinth Agreed. The plinth level of the building
level of the building blocks sufficiently above blocks is being sufficiently above the level
the level of the approach road to the project as of the approach road to the project as per
per prescribed by-laws. Levels of the other prescribed by-laws. Levels of the other
areas in the projects shall also be kept suitably areas in the projects are also being kept
so as to avoid flooding.
suitably to avoid flooding. Section and
Elevation plan are enclosed as Annexure-
Page 6 of 18
VIII.
25
Construction shall be carried out so that Agreed. As it is a mixed use development
density of population does not exceed norms project so, population density kept as per
approved by Director General Town and the approved Building and zoning plan by
Country Department Haryana.
Director
General
Town
and
Country
Department, Haryana.
26
The project proponent shall submit an Agreed. Ground water is not being used for
affidavit with the declaration that ground the construction activity. An affidavit
water will not be used for construction and regarding the same submitted to HUDA is
only treated water should be used for enclosed here as an Annexure-IX.
construction.
27
The project proponent shall not cut any Agreed. As the project site was a vacant
existing tree and project landscaping plan land so there was no need to cut the trees.
should be modified to include those trees in Plantation will be carried out around the
green area
periphery of plot & along internal road
preferably with local species.
28
The project proponent shall provide helipad Agreed. NOC to construct the structure has
facility as required under NBC norms and been obtained from AAI. A copy of NOC is
shall seek permission of helipad from AAI enclosed as Annexure-X.
accordingly.
29
The project proponent shall ensure that ECBC Agreed. ECBC norms for composite
norms for composite climate zone are met. In climate zone, water heating, pumping,
particular building envelope, HVAC services, lighting and electrical infrastructure are
water
heating,
pumping,
lighting
and being followed.
electrical infrastructure must meet ECBC
norms.
30
The project proponent shall provide 3m high Agreed. 3m high barricade around the
barricade around the project area, dust screen project area is being provided, dust screen
for every floor above the ground, proper for every floor above the ground, proper
sprinkling and covering of stored material to sprinkling and covering of stored material
restrict
Page 7 of 18
dust
and
air
pollution
during to restrict dust and air pollution during
construction.
31
construction is being provided.
The project proponent shall construct a Agreed. Sedimentation basin constructed
sedimentation basin in the lower level of the to trap the pollutants and other wastes
project site to trap pollutant and other wastes during rains is being in lower level of the
during rains.
32
project site.
The project proponent shall provide proper Agreed. Proper roads of adequate width are
Rasta of proper width and proper strength for being provided in the project for moment of
his project before the start of construction.
vehicle within the project site. Site plan is
enclosed as an Annexure-XI.
33
The project proponent shall provide all the Agreed. All the safety measures for the
safety measures for the workers during workers during construction phase of high
construction phase of high rise building.
34
rise building will be provided.
The project proponent shall ensure that the U- Agreed. Glass having U value less than
value of the glass is less than 3.177 and 3.177 & maximum solar heat gain to
maximum solar heat gain co-efficient is 0.25 efficient 0.25 Vertical Fenestration is being
for vertical fenestration.
35
The
project
permission
of
proponent
Municipal
used.
shall
submit Agreed. Mining approval is obtained from
Commissioner the assistant mining engineer, Gurgaon,
Gurgaon for disposal of excavated soil before Haryana. The copy of same is enclosed as
the start of construction.
36
Annexure-XII.
The project proponent shall seek NOC from Agreed. NOC from Town and Country
Town and Country department regarding department regarding height of the building
height of the building allowed in the skyline allowed in the skyline of that city is being
of that city.
taken. Building plan approval from the
DTP is already obtained.
Operational phase a
“Consent to Operate” shall be obtained from Agreed. Permission will be obtained after
Haryana State Pollution Control Board under completion of construction work of the
Air and Water Act and a copy shall be project.
submitted to the SEIAA, Haryana.
Page 8 of 18
b
The STP shall be installed for the treatment of Agreed. The Sewage Treatment Plant
the sewage to the prescribed standards (STP) shall be installed for the treatment of
including odour and treated effluent will be the sewage to be prescribed standards
recycled. The installation of STP should be including odor and treated effluent shall be
certified by an independent expert and a recycled to achieve zero exit discharge.
report in this regard should be submitted to Installation
of
STP
certified
by
an
the SEIAA, Haryana before the project is independent expert will be submitted to the
commissioned
for
operation.
Tertiary SEIAA before start of operation stage of
treatment of waste water is mandatory. the mixed use project.
Plumbing plan
Discharge of treated sewage shall confirm to showing the STP location is enclosed as
norms and standards of HSPCB, Panchkula. Annexure-XIII.
Project Proponent shall implement such STP
technology which does not require filter
backwash.
c
Separation of the grey and black water should Agreed. Treatment of grey and black water
be done by the use of dual plumbing line. shall be done. Dual plumbing plan and
Treatment
of
100%
grey
water
by water balance diagram are attached as
decentralized treatment should be done Annexure –XIV.
ensuring that the re-circulated water should
have BOD maximum 10 mg/litre and the
recycled water will be used for flushing,
gardening and DG set cooling and running of
fountain in the water body to achieve zero exit
discharge.
d
For disinfection of the treated wastewater Agreed. For disinfection of the treated
ultra-violate radiation or ozonization process wastewater
should be used.
e
ultra-violet
radiation
or
ozonization process shall be used.
The solid waste generated should be properly Agreed. The solid waste generated shall be
collected and segregated. Bio-degradable properly collected and segregated. Biowaste shall be decomposed at site and degradable waste shall be decomposed at
dry/inert solid waste should be disposed-off to site and dry/inert solid waste shall be
Page 9 of 18
approved sites for land filling after recovering disposed-off to approve sites for land
recyclable material.
f
filling after recovering recyclable material.
Diesel power generating sets proposed as D.G. sets to be used for power back up are
source of back-up power for lifts, common of enclosed type and confirming to rules
area illumination and for domestic use should made under the Environment (Protection)
be enclosed type and conform to rules made Act, 1986. The D.G. sets are run on low
under the Environmental (Protection) Act, sulphur diesel.
1986. The location of the DG sets should be
in the basement as promised by the project
proponent with appropriate stack height i.e
above the roof level as per the CPCB norms.
The diesel used for DG sets should be ultra
low sulphur diesel (0.05% sulphur), instead of
low sulphur diesel.
g
Ambient Noise level should be controlled to Agreed. Ambient Noise level is being
ensure that it does not exceed the prescribed controlled to ensure that it does not exceed
standards both within and at the boundary of the prescribed standards both within and at
the Proposed Residential Complex
the boundary of the Residential Complex.
A copy of ambient noise quality data is
enclosed as Annexure-II.
h
The project proponent should maintain at least Agreed. Project proponent shall provide
22% as green cover area for tree plantation 30% as a green area. Landscape plan is
especially all around the periphery of the enclosed as Annexure –XV.
project and on the road sides preferably with
local species so as to provide protection
against particulars and noise. The 8% open
spaces inside the plot should be preferably
landscaped and covered with vegetation/grass,
herbs & shrubs. Only locally available plant
species shall be used.
i
The
Page 10 of 18
project
proponent
shall
strive
to Agreed. Minimum water shall be used in
minimum water in irrigation of landscape by irrigation of landscape by minimizing grass
minimizing grass area, using native variety, area, using native variety, xeriscaping and
xeriscaping
and
efficientirrigation
irrigation
only
mulching,
system,
after
utilizing mulching,
scheduling system,
checking
scheduling
efficient
irrigation.
irrigation
Treated
evapo- water shall be used for the landscaping
transpiration data.
j
utilizing
purposes.
Rain water harvesting for roof run-off and Agreed. Rain water harvesting for roof
surface, as per plan submitted should be run-off and surface, as per plan submitted
implemented. Before recharging the surface shall be implemented. Before recharging
run-off, pre-treatment through sedimentation the surface run-off, pre-treatment through
tanks must be done to remove suspended sedimentation tanks shall be done to
matter, oil and grease. The bore well for remove suspended matter, oil and grease.
rainwater recharging should be kept at least The bore well for rainwater recharging
5m. above the highest ground water table. shall be kept at least 5m. above the highest
Care shall be taken that contaminated water ground water table. Rain water harvesting
do not enter any RWH pit. The project plan is enclosed as Annexure-VI.
proponent shall avoid RWH of first 10
minutes of rain fall. Roof top of the building
shall be without any toxic material or paint
which can contaminate rain water. Wire mess
and filters should be used wherever required.
k
The ground water level and its quality should The ground water level and its quality will
be monitored regularly in consultation with be monitored regularly in consultation with
Central Ground Water Authority.
l
Central Ground Water Authority.
There should be no traffic congestion near the Agreed. There is no traffic congestion near
entry and exit points from the roads adjoining the entry and exit points from the roads
the proposed project site. Parking should be adjoining the project site. Parking is being
fully internalized and no space should be fully internalized and no public space shall
utilized.
be utilized. A traffic plan is enclosed as
Annexure-XVI.
m
A report on the energy conservation measures Agreed.
Page 11 of 18
A
report
on
the
energy
conforming to energy conservation norms conservation
measures
conforming
to
finalized by Bureau of Energy Efficiency energy conservation norms finalized by
should be prepared incorporating details about Bureau of Energy Efficiency is being
building materials & technology, R & U prepared
incorporating
details
about
Factors etc and submit to the SEIAA, Haryana building materials & technology, R & U
in three month time.
Factors etc has been submit to the SEIAA,
Haryana in three month time.
n
Energy
conservation
measures
like Agreed. Energy conservation measures like
installation of LED for Lighting the areas installation of CFLs/TFLs for lighting the
outside the building should be integral part of areas outside the building is integral part of
the project design and should be in place the project design and shall be in place
before project commissioning. Use of solar before
project
commissioning.
Solar
panels must be adapted to the maximum lighting is proposed for open spaces and
energy conservation.
o
signage.
The project proponent shall use zero ozone Agreed. As it is a Mixed Use Development
depleting potential material in insulation, Project, all the material going to be use like
refrigeration, air-conditioning and adhesive. refrigeration, air-conditioning etc. are of
Project proponent shall also provide Halon non-ozone depleting.
free fire suppression system.
p
The solid waste generated should be properly Agreed. Solid waste generated is being
collected
and
segregated
as
per
the collected & segregated as per MSW rule,
requirement of the MSW Rules, 2000 and as 2000. Bio degradable waste will be
amended from time to time. The bio- composed by vermin-composting.
degradable waste should be composed by
vermin-composting at the site war marked
within the project area and dry/inert solid
waste should be disposed-off to the approved
sites
for
land-filling
after
recovering
recyclable material.
q
The provision of the solar water heating Agreed. As it is a Mixed Use Development
system shall be as per norms specified by Project, solar water heating system is being
Page 12 of 18
HAREDA and shall be made operational in used as per norms by HAREDA.
each building block.
r
The traffic plan and the parking plan proposed Agreed.
The
traffic
plan
is
being
by the project proponent should be adhered to meticulously adhered to with further scope
meticulously with further scope of additional of
additional
parking
for
future
parking for future requirement. There should requirement. Parking is being completely
be no traffic congestion near the entry and internalized and no public space is being
exit points from the roads adjoining the utilized. Care is being taken to ensure that
proposed project site. Parking should be fully there will be no traffic congestion at the
internalized and no public space should be entry and exit points.
used.
s
The project shall be operationalized only Agreed.
when HUDA/public authority will provide
domestic water supply system in the areas.
t
Operation and maintenance of STP, solid Agreed. Operation and maintenance of
waste
management
and
electrical STP,
solid
waste
management
and
Infrastructure, pollution control measures electrical Infrastructure, pollution control
shall be ensured even after the completion of measures will be ensured even after the
sale.
u
completion of sale.
Different type of waste should be disposed-off Agreed. MSW is being disposed off as per
as per provisions of municipal solid waste, provisions of municipal solid waste made
biomedical waste, hazardous waste, e-waste, under Environment Protection Act, 1986.
batteries
&
Environment
plastic
rules
Protection
made
under Negligible quantity of hazardous waste, e-
Act,
1986. waste, and plastic waste generated shall be
Particularly E-Waste and Battery waste shall disposed off as per hazardous waste, ebe disposed of as per existing E-waste waste, batteries & plastic rules made under
Management
Rules
2011
Management
Rules
2001.
and
The
Batteries Environment Protection Act, 1986.
project
proponent should maintain a collection center
for E-Waste and it should be disposed of to
Page 13 of 18
only
registered
and
authorized
dismantler/recycler.
v
Standards for discharging of environmental Agreed.
pollutants as enshrined in various schedules of
rules 3 of Environment Protection Rules 1986
shall be strictly complied with.
w
Water
supply
be
metered
to
different Agreed. Water supply shall be metered to
residential units and different utilities.
x
different units and different utilities.
The project proponent shall ensure that the Agreed. Stack height of DG sets are kept 6
stack height of DG sets is as per the CPCB meter above the roof level as per the CPCB
guide lines and also ensure that the emission guide lines and also ensured that the
standards of noise and air are within the emission standards of noise and air are
CPCB prescribed limits. Noise and Emission within the CPCB prescribed limits.
level of DG sets are greater than 800KVA
shall be as per CBCB latest standards for high
capacity DG sets.
y
All electric supply exceeding 100amp, 3- Agreed. All electric supply exceeding
phase shall maintain the power factor between 100amp, 3-phase shall maintain the power
0.98 lag to 1 at the point of connection.
factor between 0.98 lag to 1 at the point of
connection.
z
The project proponent shall use only treated Agreed. Treated water from the STP will
water instead of fresh water for HVAC and be used for DG cooling. Coil type cooling
DG cooling. The project proponent shall use DG sets shall be used for saving cooling
evaporative cooling technology and double water consumption for water cooled DG
stage cooling system for HVAC in order to sets.
reduce
water
consumption.
Further
temperature, relative humidity during summer
and winter session should be kept at optimal
level. Variable speed drive, best co-efficient
Page 14 of 18
of performance, as well as optimal integrated
point load value and minimum outside fresh
air supply may be resorted for conservation of
power and water. Coil type cooling DG sets
shall be used for saving cooling water
consumption for water cooled DG sets.
PART-B GENERAL CONDITIONS :-
i
The project proponent should ensure the Agreed. All safeguards mentioned in the
commitments made in Form-1, Form-1A, application are being implemented during
EIA/EMP and other documents submitted to the
construction
phase
and
will
be
the SEIAA for protection of environment and implemented during the operation phase.
proposed
environmental
safeguards
are
complied with in letter and spirit. In case of
contradiction between two or more documents
on any point, the most environmentally
friendly commitment on the point shall be
taken as commitment by project proponent.
ii
Six monthly compliance reports should be Agreed. Six monthly compliance report is
submitted to the Haryana State Pollution being submitted to the Haryana State
Control Board and Regional Office, MoEF, Pollution Control Board and Regional
GOT, Northern Region, Chandigarh and a Office, MoEF, GOI, Northern Region,
copy to the SEIAA Panchkula, Haryana.
iii
Chandigarh, Haryana
Noise , STP outlet and stack emission shall be Agreed. Noise, STP outlet and stack
monitored
daily.
Other
environmental emission shall be monitored daily. Other
parameters shall be monitored on monthly environmental
parameters
shall
be
basis. After every 3 months the project monitored on monthly basis. After every 3
proponent shall conduct environmental audit months
environmental
audit
will
be
and shall take corrective measure, if required, conducted and corrective measure will be
without delay.
Page 15 of 18
taken, if required, without delay.
iv
The SEIAA, Haryana reserves the right to add Agreed.
additional safeguard measures subsequently,
if found necessary. Environmental Clearance
granted will be revoked if it is found that false
information has been given for getting
approval of this project. SEIAA reserves the
right to revoke the clearance if conditions
stipulated are not
implemented to
the
satisfaction of SEIAA/MOEF.
v
The project proponent shall not violate any No judicial order/ pronouncements issued
judicial orders/pronouncements issued by any by the Hon’ble Supreme Court/High Courts
Court/Tribunal.
vi
to the developers.
All other statutory clearances such as the Agreed.
All
the
required
applicable
approvals for storage of diesel from Chief clearances have been taken from the
Controller of Explosives, Fire Department, respective authority.
Civil
Aviation
Conservation
Act,
Department,
1980
and
Forest Forest NOC is enclosed as Annexure-V
Wildlife AAI NOC is enclosed as Annexure-X
(Protection) Act. 1972, Forest Act, 1927, NOC from Chief Controller of Explosive
PLPA 1900, etc. shall be obtained, as shall be taken at the appropriate stage.
applicable by project proponents from the
respective authorities prior to construction of
the project.
vii
The project proponent should inform the Agreed. A copy of advertisement will be
public that the project has be accorded submitted along with the next compliance
Environment Clearance by the SEIAA and report.
copies of the clearance letter are available
with the Haryana State Pollution Control
Board & SEIAA. This should be advertised
within 7 days from the date of issue of
clearance
Page 16 of 18
letter at
least
in
two local
newspapers that are widely circulated in the
region and the copy of the same be forwarded
to SEIAA Haryana. A copy of Environment
Clearance collections shall also be put on
project
proponent’s
website
for
public
awareness.
viii
Any appeal
against
this
Environmental Agreed.
Clearance shall lie with the National Green
Tribunal, if preferred within a period of 30
days as prescribed under Section 16 of the
National Green Tribunal Act, 2010.
ix
The project proponent shall put in place Agreed.
Corporate Environment Policy as mentioned
in MOEF, GOI, ON No. J-11013/41/2006-IA
II (I) dated 26.04.12 within 3 months period.
Latest Corporate Environment Policy should
be submitted to SEIAA within 3 months of
issuance of this letter.
x
The
fund
ear-marked
for
environment Agreed.
The
fund
ear-marked
for
protection measures should be kept in environment protection measures is being
separate account and should not be diverted kept in separate account and will not be
for other purposes and year wise expenditure diverted for other purposes and year wise
shall be reported to the SEIAA/RO MoEF expenditure
will
GOI under rules prescribed for Environment SEIAA/RO
MoEF
Audit.
xi
be
reported
GOI
under
to
the
rules
prescribed for Environment Audit.
The project proponent shall obtain NOC Agreed. Forest and Aravali NOC from
under Aravalli Notification from CEC of District Collector has been obtained. The
Hon’ble Supreme court regarding coverage copy of the same is enclosed as Annexureunder Aravalli Notification before start of V.
Page 17 of 18
construction.
xii
The project proponent shall ensure that no Agreed. It is being ensured that no vehicle
vehicle during construction/operation phase during construction/operation phase enter
enter the project premises without valid the
project
premises
without
valid
‘Pollution Under Control’ certificate from ‘Pollution Under Control’ certificate from
competent Authority.
Page 18 of 18
competent Authority.
Download