POINT-WISE COMPLIANCE OF STIPULATED ENVIRONMENTAL CONDITIONS/ SAFEGUARDS IN THE ENVIRONMENTAL CLEARANCE LETTER NO. SEIAA/HR/2013/283 DATED 17thJune, 2013 Tata Center- Mixed Use Development Project, Sector-72, Gurgaon, Haryana Sl. Conditions Status of Compliance No. PART A – SPECIFIC CONDITIONS: Construction Phase 1 “Consent to Establish” shall be obtained from Agreed. “Consent to Establish” has been Haryana State Pollution Control Board under obtained from Haryana State Pollution Air and Water Act and a copy shall be Control Board under Air and Water Act submitted to the SEIAA, Haryana before the and has been submitted to SEIAA, Haryana start of any construction work at site. before the start of construction work at site. A copy of “Consent to Establish” is enclosed as Annexure-I. 2 A first aid room as proposed in the project Agreed. A first aid room is being provided report shall be provided both during during the construction phase and will be construction and operation phase of the maintained during operation phase of the project. 3 Adequate project. drinking water and sanitary Agreed. Adequate drinking water and facilities should be provided for construction sanitary facilities are being provided for workers at the site. Provision should be made construction workers at site. Provisions are for mobile toilets. Open defecation by there for mobile toilets. The safe disposal laboures is strictly prohibited. The safe of waste-water and solid wastes generated disposal of waste water and solid wastes during the construction phase is being generated during the construction phase ensured. should be ensured. Page 1 of 18 4 All top soil excavated during construction Agreed. All the top soil excavated during activities should be stored for use in the construction activities has been horticulture/landscape development within the properly stored and shall be utilized for the project site. horticulture/landscape development within the site. 5 The project proponent shall ensure that the Agreed. It is being ensured that the building material required during construction building material required during phase is properly stored within the project construction phase is being properly stored area and disposal of construction waste should within the project area and construction not create any adverse effect on the waste is being used for site development neighboring communities and should be and land filling of the project site, it will disposed of after taking necessary precautions not create any adverse effect on the for general safety and health aspects of neighboring communities. people, only in approved sites with the approval of competent authority. 6 Construction spoils, including bituminous Agreed. Construction spoils are being material and other hazardous materials, must used for site development and land filling not be allowed to contaminate watercourses of the project site, other hazardous and dump sites for such material must be materials will be disposed-off as per norms secured so that they should not leach into the ground water and any hazardous waste generated during construction phase, should be disposed off as per applicable rules and norms with necessary approval of the Haryana state Pollution Control Board. 7 The diesel generator sets to be used during Agreed. D.G sets are run on low sulphur construction phase should be of ultra low diesel, conforming to Noise & National Air sulphur diesel type and should confirm to Quality Standards. Environment (Protection) Rules prescribed for air and noise emission standards. 8 The diesel required for operating DG sets Agreed. The diesel required for operating Page 2 of 18 shall be stored in underground tanks and if DG set is being stored in specific drums required, clearance from Chief Controller of and log books are also being managed for Explosives shall be taken. accountability. Storage is within the threshold limit hence clearance from chief control of explosive is not required. 9 Ambient noise levels should confirm to the Agreed. Ambient noise levels will confirm residential standards both during day and to the residential standards both during day night. Incremental pollution loads on the and night. Incremental pollution loads on ambient air and noise quality should be the ambient air and noise quality is being closely monitored during the construction closely monitored. during the construction phase. Adequate measures should be taken to phase. Adequate measures are being taken reduce ambient air and noise level during to reduce ambient air and noise level during construction phase, so as to confirm to the construction phase to confirm to the stipulated residential standards. stipulated residential standards. Noise quality data monitored in March’14 is enclosed as Annexure-II. 10 Fly ash should be used as building material in Agreed. Fly ash based material/ products the construction as per the provisions of Fly as per the provisions of fly ash notification Ash Notification of September 1999 and as of September, 1999 and as amended on amended on 27th August 2003. 27th August, 2003 shall be used by the construction agency. 11 Storm water control and its re-use as CGWB Agreed. Storm water will be collected to and BIS standards for various applications recharge the ground water, 08 RWH pits should be ensured. are proposed to be constructed within the project site for this purpose 12 Water demand during construction should be Agreed. Water demand during construction reduced by use of pre-mixed concrete, curing shall be reduced by use of pre-mixed agents and other best practices. concrete, curing agents and other best practices. 13 In view of the severe constrains in water Agreed. Page 3 of 18 No ground water is being supply augmentation in the region and extracted during the construction as well as sustainability of water resources, the operation phase. So, CGWB permission is developer will submit the NOC from CGWB not required. However during construction specifying water extraction quantities and phase water is being supplied by HUDA assurance from HUDA/utility provider (Treated Water), permission letter from indicating source of water supply and quantity HUDA is enclosed as Annexure-III & of water with details of intended use of water during operation phase HUDA will supply – potable and non-potable. Assurance is fresh water, copy of acknowledgement is required for both construction and operation enclosed as Annexure-IV. stages separately. It shall be submitted to the SEIAA and RO, MOEF, Chandigarh before the start of construction. 14 Roof should meet prescriptive requirement as Agreed. During construction phase care is per Energy Conservation Building Code by being taken that roof area meets Energy using appropriate thermal insulation material. Conservation Building Code requirement by using appropriate thermal insulation material to fulfill requirement. 15 Opaque wall should meet prescriptive Agreed. Material having appropriate R & requirement as per Energy Conservation U value shall be used to meet prescriptive Building Code which is proposed to be requirement of opaque wall as per energy mandatory for all air conditioned spaces while conservation building Code. it is aspirational for non-air-conditioned spaces by use of appropriate thermal insulation material to fulfill requirement. 16 The approval of the competent authority shall Agreed. The approval of the competent be obtained for structural safety of the authority is being obtained for structural building on account of earthquake, adequacy safety of the building on account of of fire-fighting equipment, etc. as per earthquake, adequacy of fire-fighting National Building Code including protection equipment, etc. as per National Building measures from lightening etc. If any forest Code including protection measures from land is involved in the proposal site, clearance lightening etc. Page 4 of 18 under Forest Conservation Act shall be The project site does not fall under the obtained from the competent authority. Forest area. The Forest NOC has been obtained from the Deputy commissioner. A copy of the Forest NOC is enclosed as Annexure-V 17 Overexploited groundwater and impending Agreed. The water reuse/recycling and severe shortage of water supply in the region water efficiency/saving measures are being requires the developers to redraw the water incorporated within 3 months and before and energy conservation plan. Developer shall start of construction to SEIAA, Haryana reduce the overall footprint of the proposed and RO, MOEF, GOI, Chandigarh. development. Project proponent shall incorporate water efficiency/savings measures as well as water reuse/recycling within 3 months and before start of construction to the SEIAA, Haryana and RO, MOEF, GOI, Chandigarh. 18 The project proponent shall construct 08 rain Agreed. 8 rain water harvesting pits for water harvesting pits for recharging the recharging the ground water within the ground water within the project premises. project premises shall be constructed. Rain Rain water harvesting pits shall be designed water harvesting pits are being designed to to make provisions for silting chamber and make provisions for silting chamber and removal of floating matter before entering removal of floating matter before entering harvesting pit. Maintenance budget and harvesting pit. Maintenance budget and persons responsible for maintenance must be persons responsible for maintenance are provided. Care shall also be taken that being provided and care shall also be taken contaminated water do not enter any RWH that contaminated water do not enter any pit. RWH pit.Storm water plan showing the RWH pit location is enclosed as Annexure-VI. 19 The project proponent will provide minimum Agreed, Since hydraulic ladder can be one hydraulic ladder for escape of people in provided upto only 12m, so permanent Page 5 of 18 case of fire. ladder is being provided instead of hydraulic ladder. 20 The project proponent shall submit assurance Agreed. An application has been filled to from the DHBVN for supply of 5016 KVA of the Superintending Engineer NCR power supply before the start of the Planning. The copy of the same is enclosed construction. In no case project will be as Annexure VII. operational solely on generators without any power supply from any external power utility. 21 Detail calculation of power load and ultimate Agreed. The total power requirement is power load of the project shall be submitted to 5016 KVA that will be supplied by DHBVN under intimation to SEIAA Haryana DHBVN. The detailed power load before the start of the construction. Provisions calculation has been submitted to the shall be made for electrical infrastructure in DHBVN. An application has been filled to the project area. the Superintending Engineer NCR Planning. The copy of the same is enclosed as AnnexureVII. 22 The project proponent shall obtain NOC from Agreed. NOC from the nearest fire station the nearest fire station before start of the before the start of the construction is being construction. 23 obtained. The project proponent shall not raise any Agreed. The project site does not contain construction in the natural land any natural land depression Nallah/ water depression/Nallah/water course and shall course as well as no natural flow is ensure that the natural flow from the obstructed by the project. Nallah/water course is not obstructed. 24 The project proponent shall keep the plinth Agreed. The plinth level of the building level of the building blocks sufficiently above blocks is being sufficiently above the level the level of the approach road to the project as of the approach road to the project as per per prescribed by-laws. Levels of the other prescribed by-laws. Levels of the other areas in the projects shall also be kept suitably areas in the projects are also being kept so as to avoid flooding. suitably to avoid flooding. Section and Elevation plan are enclosed as Annexure- Page 6 of 18 VIII. 25 Construction shall be carried out so that Agreed. As it is a mixed use development density of population does not exceed norms project so, population density kept as per approved by Director General Town and the approved Building and zoning plan by Country Department Haryana. Director General Town and Country Department, Haryana. 26 The project proponent shall submit an Agreed. Ground water is not being used for affidavit with the declaration that ground the construction activity. An affidavit water will not be used for construction and regarding the same submitted to HUDA is only treated water should be used for enclosed here as an Annexure-IX. construction. 27 The project proponent shall not cut any Agreed. As the project site was a vacant existing tree and project landscaping plan land so there was no need to cut the trees. should be modified to include those trees in Plantation will be carried out around the green area periphery of plot & along internal road preferably with local species. 28 The project proponent shall provide helipad Agreed. NOC to construct the structure has facility as required under NBC norms and been obtained from AAI. A copy of NOC is shall seek permission of helipad from AAI enclosed as Annexure-X. accordingly. 29 The project proponent shall ensure that ECBC Agreed. ECBC norms for composite norms for composite climate zone are met. In climate zone, water heating, pumping, particular building envelope, HVAC services, lighting and electrical infrastructure are water heating, pumping, lighting and being followed. electrical infrastructure must meet ECBC norms. 30 The project proponent shall provide 3m high Agreed. 3m high barricade around the barricade around the project area, dust screen project area is being provided, dust screen for every floor above the ground, proper for every floor above the ground, proper sprinkling and covering of stored material to sprinkling and covering of stored material restrict Page 7 of 18 dust and air pollution during to restrict dust and air pollution during construction. 31 construction is being provided. The project proponent shall construct a Agreed. Sedimentation basin constructed sedimentation basin in the lower level of the to trap the pollutants and other wastes project site to trap pollutant and other wastes during rains is being in lower level of the during rains. 32 project site. The project proponent shall provide proper Agreed. Proper roads of adequate width are Rasta of proper width and proper strength for being provided in the project for moment of his project before the start of construction. vehicle within the project site. Site plan is enclosed as an Annexure-XI. 33 The project proponent shall provide all the Agreed. All the safety measures for the safety measures for the workers during workers during construction phase of high construction phase of high rise building. 34 rise building will be provided. The project proponent shall ensure that the U- Agreed. Glass having U value less than value of the glass is less than 3.177 and 3.177 & maximum solar heat gain to maximum solar heat gain co-efficient is 0.25 efficient 0.25 Vertical Fenestration is being for vertical fenestration. 35 The project permission of proponent Municipal used. shall submit Agreed. Mining approval is obtained from Commissioner the assistant mining engineer, Gurgaon, Gurgaon for disposal of excavated soil before Haryana. The copy of same is enclosed as the start of construction. 36 Annexure-XII. The project proponent shall seek NOC from Agreed. NOC from Town and Country Town and Country department regarding department regarding height of the building height of the building allowed in the skyline allowed in the skyline of that city is being of that city. taken. Building plan approval from the DTP is already obtained. Operational phase a “Consent to Operate” shall be obtained from Agreed. Permission will be obtained after Haryana State Pollution Control Board under completion of construction work of the Air and Water Act and a copy shall be project. submitted to the SEIAA, Haryana. Page 8 of 18 b The STP shall be installed for the treatment of Agreed. The Sewage Treatment Plant the sewage to the prescribed standards (STP) shall be installed for the treatment of including odour and treated effluent will be the sewage to be prescribed standards recycled. The installation of STP should be including odor and treated effluent shall be certified by an independent expert and a recycled to achieve zero exit discharge. report in this regard should be submitted to Installation of STP certified by an the SEIAA, Haryana before the project is independent expert will be submitted to the commissioned for operation. Tertiary SEIAA before start of operation stage of treatment of waste water is mandatory. the mixed use project. Plumbing plan Discharge of treated sewage shall confirm to showing the STP location is enclosed as norms and standards of HSPCB, Panchkula. Annexure-XIII. Project Proponent shall implement such STP technology which does not require filter backwash. c Separation of the grey and black water should Agreed. Treatment of grey and black water be done by the use of dual plumbing line. shall be done. Dual plumbing plan and Treatment of 100% grey water by water balance diagram are attached as decentralized treatment should be done Annexure –XIV. ensuring that the re-circulated water should have BOD maximum 10 mg/litre and the recycled water will be used for flushing, gardening and DG set cooling and running of fountain in the water body to achieve zero exit discharge. d For disinfection of the treated wastewater Agreed. For disinfection of the treated ultra-violate radiation or ozonization process wastewater should be used. e ultra-violet radiation or ozonization process shall be used. The solid waste generated should be properly Agreed. The solid waste generated shall be collected and segregated. Bio-degradable properly collected and segregated. Biowaste shall be decomposed at site and degradable waste shall be decomposed at dry/inert solid waste should be disposed-off to site and dry/inert solid waste shall be Page 9 of 18 approved sites for land filling after recovering disposed-off to approve sites for land recyclable material. f filling after recovering recyclable material. Diesel power generating sets proposed as D.G. sets to be used for power back up are source of back-up power for lifts, common of enclosed type and confirming to rules area illumination and for domestic use should made under the Environment (Protection) be enclosed type and conform to rules made Act, 1986. The D.G. sets are run on low under the Environmental (Protection) Act, sulphur diesel. 1986. The location of the DG sets should be in the basement as promised by the project proponent with appropriate stack height i.e above the roof level as per the CPCB norms. The diesel used for DG sets should be ultra low sulphur diesel (0.05% sulphur), instead of low sulphur diesel. g Ambient Noise level should be controlled to Agreed. Ambient Noise level is being ensure that it does not exceed the prescribed controlled to ensure that it does not exceed standards both within and at the boundary of the prescribed standards both within and at the Proposed Residential Complex the boundary of the Residential Complex. A copy of ambient noise quality data is enclosed as Annexure-II. h The project proponent should maintain at least Agreed. Project proponent shall provide 22% as green cover area for tree plantation 30% as a green area. Landscape plan is especially all around the periphery of the enclosed as Annexure –XV. project and on the road sides preferably with local species so as to provide protection against particulars and noise. The 8% open spaces inside the plot should be preferably landscaped and covered with vegetation/grass, herbs & shrubs. Only locally available plant species shall be used. i The Page 10 of 18 project proponent shall strive to Agreed. Minimum water shall be used in minimum water in irrigation of landscape by irrigation of landscape by minimizing grass minimizing grass area, using native variety, area, using native variety, xeriscaping and xeriscaping and efficientirrigation irrigation only mulching, system, after utilizing mulching, scheduling system, checking scheduling efficient irrigation. irrigation Treated evapo- water shall be used for the landscaping transpiration data. j utilizing purposes. Rain water harvesting for roof run-off and Agreed. Rain water harvesting for roof surface, as per plan submitted should be run-off and surface, as per plan submitted implemented. Before recharging the surface shall be implemented. Before recharging run-off, pre-treatment through sedimentation the surface run-off, pre-treatment through tanks must be done to remove suspended sedimentation tanks shall be done to matter, oil and grease. The bore well for remove suspended matter, oil and grease. rainwater recharging should be kept at least The bore well for rainwater recharging 5m. above the highest ground water table. shall be kept at least 5m. above the highest Care shall be taken that contaminated water ground water table. Rain water harvesting do not enter any RWH pit. The project plan is enclosed as Annexure-VI. proponent shall avoid RWH of first 10 minutes of rain fall. Roof top of the building shall be without any toxic material or paint which can contaminate rain water. Wire mess and filters should be used wherever required. k The ground water level and its quality should The ground water level and its quality will be monitored regularly in consultation with be monitored regularly in consultation with Central Ground Water Authority. l Central Ground Water Authority. There should be no traffic congestion near the Agreed. There is no traffic congestion near entry and exit points from the roads adjoining the entry and exit points from the roads the proposed project site. Parking should be adjoining the project site. Parking is being fully internalized and no space should be fully internalized and no public space shall utilized. be utilized. A traffic plan is enclosed as Annexure-XVI. m A report on the energy conservation measures Agreed. Page 11 of 18 A report on the energy conforming to energy conservation norms conservation measures conforming to finalized by Bureau of Energy Efficiency energy conservation norms finalized by should be prepared incorporating details about Bureau of Energy Efficiency is being building materials & technology, R & U prepared incorporating details about Factors etc and submit to the SEIAA, Haryana building materials & technology, R & U in three month time. Factors etc has been submit to the SEIAA, Haryana in three month time. n Energy conservation measures like Agreed. Energy conservation measures like installation of LED for Lighting the areas installation of CFLs/TFLs for lighting the outside the building should be integral part of areas outside the building is integral part of the project design and should be in place the project design and shall be in place before project commissioning. Use of solar before project commissioning. Solar panels must be adapted to the maximum lighting is proposed for open spaces and energy conservation. o signage. The project proponent shall use zero ozone Agreed. As it is a Mixed Use Development depleting potential material in insulation, Project, all the material going to be use like refrigeration, air-conditioning and adhesive. refrigeration, air-conditioning etc. are of Project proponent shall also provide Halon non-ozone depleting. free fire suppression system. p The solid waste generated should be properly Agreed. Solid waste generated is being collected and segregated as per the collected & segregated as per MSW rule, requirement of the MSW Rules, 2000 and as 2000. Bio degradable waste will be amended from time to time. The bio- composed by vermin-composting. degradable waste should be composed by vermin-composting at the site war marked within the project area and dry/inert solid waste should be disposed-off to the approved sites for land-filling after recovering recyclable material. q The provision of the solar water heating Agreed. As it is a Mixed Use Development system shall be as per norms specified by Project, solar water heating system is being Page 12 of 18 HAREDA and shall be made operational in used as per norms by HAREDA. each building block. r The traffic plan and the parking plan proposed Agreed. The traffic plan is being by the project proponent should be adhered to meticulously adhered to with further scope meticulously with further scope of additional of additional parking for future parking for future requirement. There should requirement. Parking is being completely be no traffic congestion near the entry and internalized and no public space is being exit points from the roads adjoining the utilized. Care is being taken to ensure that proposed project site. Parking should be fully there will be no traffic congestion at the internalized and no public space should be entry and exit points. used. s The project shall be operationalized only Agreed. when HUDA/public authority will provide domestic water supply system in the areas. t Operation and maintenance of STP, solid Agreed. Operation and maintenance of waste management and electrical STP, solid waste management and Infrastructure, pollution control measures electrical Infrastructure, pollution control shall be ensured even after the completion of measures will be ensured even after the sale. u completion of sale. Different type of waste should be disposed-off Agreed. MSW is being disposed off as per as per provisions of municipal solid waste, provisions of municipal solid waste made biomedical waste, hazardous waste, e-waste, under Environment Protection Act, 1986. batteries & Environment plastic rules Protection made under Negligible quantity of hazardous waste, e- Act, 1986. waste, and plastic waste generated shall be Particularly E-Waste and Battery waste shall disposed off as per hazardous waste, ebe disposed of as per existing E-waste waste, batteries & plastic rules made under Management Rules 2011 Management Rules 2001. and The Batteries Environment Protection Act, 1986. project proponent should maintain a collection center for E-Waste and it should be disposed of to Page 13 of 18 only registered and authorized dismantler/recycler. v Standards for discharging of environmental Agreed. pollutants as enshrined in various schedules of rules 3 of Environment Protection Rules 1986 shall be strictly complied with. w Water supply be metered to different Agreed. Water supply shall be metered to residential units and different utilities. x different units and different utilities. The project proponent shall ensure that the Agreed. Stack height of DG sets are kept 6 stack height of DG sets is as per the CPCB meter above the roof level as per the CPCB guide lines and also ensure that the emission guide lines and also ensured that the standards of noise and air are within the emission standards of noise and air are CPCB prescribed limits. Noise and Emission within the CPCB prescribed limits. level of DG sets are greater than 800KVA shall be as per CBCB latest standards for high capacity DG sets. y All electric supply exceeding 100amp, 3- Agreed. All electric supply exceeding phase shall maintain the power factor between 100amp, 3-phase shall maintain the power 0.98 lag to 1 at the point of connection. factor between 0.98 lag to 1 at the point of connection. z The project proponent shall use only treated Agreed. Treated water from the STP will water instead of fresh water for HVAC and be used for DG cooling. Coil type cooling DG cooling. The project proponent shall use DG sets shall be used for saving cooling evaporative cooling technology and double water consumption for water cooled DG stage cooling system for HVAC in order to sets. reduce water consumption. Further temperature, relative humidity during summer and winter session should be kept at optimal level. Variable speed drive, best co-efficient Page 14 of 18 of performance, as well as optimal integrated point load value and minimum outside fresh air supply may be resorted for conservation of power and water. Coil type cooling DG sets shall be used for saving cooling water consumption for water cooled DG sets. PART-B GENERAL CONDITIONS :- i The project proponent should ensure the Agreed. All safeguards mentioned in the commitments made in Form-1, Form-1A, application are being implemented during EIA/EMP and other documents submitted to the construction phase and will be the SEIAA for protection of environment and implemented during the operation phase. proposed environmental safeguards are complied with in letter and spirit. In case of contradiction between two or more documents on any point, the most environmentally friendly commitment on the point shall be taken as commitment by project proponent. ii Six monthly compliance reports should be Agreed. Six monthly compliance report is submitted to the Haryana State Pollution being submitted to the Haryana State Control Board and Regional Office, MoEF, Pollution Control Board and Regional GOT, Northern Region, Chandigarh and a Office, MoEF, GOI, Northern Region, copy to the SEIAA Panchkula, Haryana. iii Chandigarh, Haryana Noise , STP outlet and stack emission shall be Agreed. Noise, STP outlet and stack monitored daily. Other environmental emission shall be monitored daily. Other parameters shall be monitored on monthly environmental parameters shall be basis. After every 3 months the project monitored on monthly basis. After every 3 proponent shall conduct environmental audit months environmental audit will be and shall take corrective measure, if required, conducted and corrective measure will be without delay. Page 15 of 18 taken, if required, without delay. iv The SEIAA, Haryana reserves the right to add Agreed. additional safeguard measures subsequently, if found necessary. Environmental Clearance granted will be revoked if it is found that false information has been given for getting approval of this project. SEIAA reserves the right to revoke the clearance if conditions stipulated are not implemented to the satisfaction of SEIAA/MOEF. v The project proponent shall not violate any No judicial order/ pronouncements issued judicial orders/pronouncements issued by any by the Hon’ble Supreme Court/High Courts Court/Tribunal. vi to the developers. All other statutory clearances such as the Agreed. All the required applicable approvals for storage of diesel from Chief clearances have been taken from the Controller of Explosives, Fire Department, respective authority. Civil Aviation Conservation Act, Department, 1980 and Forest Forest NOC is enclosed as Annexure-V Wildlife AAI NOC is enclosed as Annexure-X (Protection) Act. 1972, Forest Act, 1927, NOC from Chief Controller of Explosive PLPA 1900, etc. shall be obtained, as shall be taken at the appropriate stage. applicable by project proponents from the respective authorities prior to construction of the project. vii The project proponent should inform the Agreed. A copy of advertisement will be public that the project has be accorded submitted along with the next compliance Environment Clearance by the SEIAA and report. copies of the clearance letter are available with the Haryana State Pollution Control Board & SEIAA. This should be advertised within 7 days from the date of issue of clearance Page 16 of 18 letter at least in two local newspapers that are widely circulated in the region and the copy of the same be forwarded to SEIAA Haryana. A copy of Environment Clearance collections shall also be put on project proponent’s website for public awareness. viii Any appeal against this Environmental Agreed. Clearance shall lie with the National Green Tribunal, if preferred within a period of 30 days as prescribed under Section 16 of the National Green Tribunal Act, 2010. ix The project proponent shall put in place Agreed. Corporate Environment Policy as mentioned in MOEF, GOI, ON No. J-11013/41/2006-IA II (I) dated 26.04.12 within 3 months period. Latest Corporate Environment Policy should be submitted to SEIAA within 3 months of issuance of this letter. x The fund ear-marked for environment Agreed. The fund ear-marked for protection measures should be kept in environment protection measures is being separate account and should not be diverted kept in separate account and will not be for other purposes and year wise expenditure diverted for other purposes and year wise shall be reported to the SEIAA/RO MoEF expenditure will GOI under rules prescribed for Environment SEIAA/RO MoEF Audit. xi be reported GOI under to the rules prescribed for Environment Audit. The project proponent shall obtain NOC Agreed. Forest and Aravali NOC from under Aravalli Notification from CEC of District Collector has been obtained. The Hon’ble Supreme court regarding coverage copy of the same is enclosed as Annexureunder Aravalli Notification before start of V. Page 17 of 18 construction. xii The project proponent shall ensure that no Agreed. It is being ensured that no vehicle vehicle during construction/operation phase during construction/operation phase enter enter the project premises without valid the project premises without valid ‘Pollution Under Control’ certificate from ‘Pollution Under Control’ certificate from competent Authority. Page 18 of 18 competent Authority.