PROPOSED GROUP HOUSING PROJECT
(“Windchants”)
at
Village Chauma, Sector-112, Gurgaon, Haryana
2nd HALF-YEARLY MONITORING COMPLIANCE (Dec, 2013) OF STIPULATED
ENVIRONMENTAL CONDITIONS/ SAFEGUARDS IN THE ENVIRONMENTAL
CLEARANCE LETTER NO. SEIAA/HR/2012/488 dtd. 27-12-2012
Sl. No.
Conditions
Status of Compliance
PART A - SPECIFIC CONDITIONS: Construction Phase:"Consent for Establishment" shall be obtained “Consent to Establish” issued by Haryana
1.
from Haryana State Pollution Control Board State Pollution Control Board vide their
under Air and Water Act and a copy shall be letter
no.
HSPCB/Consent/:
submitted to the SEIAA, Haryana before the
2821213GUNOCTE254308 dated 25-09-2013.
start of any construction work at site.
Copy enclosed as Annexure-1.
A first aid room as proposed in the project First Aid room is provided during the
2.
report shall be provided both during construction phase and will also be provided
construction and operation of the project.
during the operation phase.
Adequate drinking water and sanitary Drinking water for construction workers is
facilities
should
be
provided
for procured from HUDA. Mobile toilets are
construction workers at the site. Provision also provided at the project site. Solid waste
3.
should be made for mobile toilets. Open is disposed off through a vendor.
defecation by the labours is strictly
prohibited. The safe disposal of waste
water and solid wastes generated during
the construction phase should be ensured.
All
4.
the
topsoil
excavated
during Yes. The topsoil excavated is stored at the
construction activities should be stored for project site and will be used for horticulture/
use
in
horticulture/
landscape landscape purposes.
development within the project site.
1
Disposal of muck during construction No adverse effect on the neighboring
phase should not create any adverse effect communities and it is being disposed-off
on the neighboring communities and be properly.
5.
disposed taking the necessary precautions
for general safety and health aspects of
people, only in approved sites with the
approval of competent authority.
Construction spoils, including bituminous No bituminous & hazardous waste (except
material and other hazardous materials, DG spent oil) is being used at the moment.
must not be allowed to contaminate Spent oil from DG set will be disposed off
watercourses and the dump sites for such through Govt. authorized recycler as per
material must be secured so that they applicable Rules & norms.
6.
should not leach into the ground water
and any hazardous waste generated during
construction phase, should be disposal off
as per applicable rules and norms with
necessary approval of the Haryana State
Pollution Control Board.
The diesel generator sets to be used The diesel generator sets during construction
during construction phase should be low activities is Low Sulphur diesel type and
sulphur diesel type and should conform to enclosed with acoustic enclosure & along
7.
Environment
(Protection)
Rules with the provision of the silencer and well
prescribed for air and noise emission within air & Noise emission standards as per
standards.
E (P) A Rules
The diesel required for operating DG sets It is assured to comply this condition during
shall be stored in underground tanks and the operational phase only as the diesel
8.
if
required,
clearance
from
Chief quantity in store is to the tune of 400 to 600
Controller of Explosives shall be taken.
liters
at
present
for
which
storage/
permission is not necessary.
9.
Ambient noise levels should conform to Ambient noise levels are conforming to
residential standards both during day and standards both during day and night.
2
night. Incremental pollution loads on the Incremental pollution loads on the ambient
ambient air and noise quality should be air and noise quality is being closely
closely monitored during construction monitored
during
construction
phase.
phase. Adequate measures should be Adequate measures were made to reduce
made to reduce ambient air and noise ambient
air
and
noise
level
during
level during construction phase, so as to construction phase, so as to conform to the
conform to the stipulated residential stipulated standards. (Test reports attached
standards.
as Annexure- 15)
Fly ash should be used as building We are using fly ash based material/
material in the construction as per the products as per the provisions of fly ash
10.
provisions of Fly Ash Notification of notification of 14.09.1999 and as amended
September, 1999 and amended as on 27th on 27.08.2003
August, 2003.
Ready mixed concrete must be used in Ready mixed concrete is being used in
11.
building construction.
building construction.
Storm water control and its re-use as per Storm water control and its reuse will be
12.
CGWB and BIS standards for various maintained as per norms for various
applications should be ensured.
applications if there is heavy rain.
Water demand during construction should Water
13.
demand
during
construction
is
be reduced by use of premixed concrete, reduced by the practice of using premixed
curing agents and other best practices concrete, curing agents and other best
referred.
practices.
In view of the severe constrains in water Water supply during construction phase:
supply augmentation in the region and We have got the NOC from Administrator
sustainability of water resources, the Office, HUDA, Gurgaon for the same. We
14.
developer will submit the NOC from are collecting treated water from HUDA
CGWA
specifying
water
extraction STP’s at Dhanwapur & Behrampur through
quantities and assurance from HUDA/ tankers, which are being further treated on
utility provider indicating source of water site by us through a packaged STP in order
supply and quantity of water with details to make it fit for construction. The copy of
3
of intended use of water- potable and non- the NOC is attached as Annexure- 2.
potable. Assurance is required for both Water Supply during operational phase:
construction
and
operation
stages We got the assurance from the Office of
separately. It shall be submitted to the Executive Engineer, HUDA, Gurgaon to
SEIAA / R.O. MoEF, Chandigarh before supply the adequate water in operational
the start of construction.
phase.
The
assurance
is
enclosed
as
Annexure- 3.
Roof
should
meet
prescriptive Roof will be meeting the prescriptive
requirement as per Energy Conservation requirement as per energy conservation
15.
Building Code by using appropriate building code by using appropriate thermal
thermal insulation material to fulfill insulation material to fulfill requirement
requirement.
Opaque wall should meet prescriptive Opaque wall will be meeting prescriptive
requirement as per Energy Conservation requirement as per energy conservation
Building Code which is proposed to be building code for all air conditioned spaces
16.
mandatory for all air conditioned spaces while it is aspiration for non-air conditioned
while it is inspirational for non-air- spaces by use of appropriate thermal
conditioned spaces by use of appropriate insulation to fulfill requirement.
thermal insulation material to fulfill
requirement.
The approval of the competent authority The approval of competent authority has
shall be obtained for structural safety of been taken for structural safety of the
the building due to earthquake, adequacy building due to earthquake, adequacy of fire
of firefighting equipment, etc. as per fighting equipments etc. as per National
National
17.
Building
Code
including Building
Code
including
protection
protection measures from lighting etc. If measures from lightening etc. No forest land
any forestland is involved in the proposed is involved in the proposed project.
site, clearance under Forest Conservation
Act shall be taken from the competent No forest land is involved in the proposed
Authority.
project, forest NOC from DC, Gurgaon is
enclosed as Annexure- 4.
4
Overexploited
groundwater
and Water demand during construction phase- 50
impending severe shortage of water KLD.
supply
in
the
region
requires
the Water
efficiency
fixtures
during
developer to redraw the water and energy construction phase:
conservation plan. Developer shall submit
Fabrics such as hessian, or materials
details of good practices that have been
such as sand, can be used like a
included in the project to reduce the
‘mulch’ to maintain water on the
overall
surface of the concrete.
footprint
of
the
proposed
development including a detailed water
18.


Concrete structures will be covered
balance along-with source and quantities
with thick cloth/gunny bags and then
of
water
water will be sprayed on them. This
requirement (including water requirement
would avoid water rebound and will
during construction phase) incorporating
ensure
water efficiency/ savings measures as well
curing.
potable
and
non-potable
as water reuse/recycling within 3 months

to the SEIAA, Haryana and R.O. MoEF,
sustained
and
complete
Efficient use of water for curing of
concrete
GOI, Chandigarh before the start of During Operational Phase:
construction.
Fresh water: 303 KLD
Flushing: 130 KLD
Waste water: 380 KLD
Water
efficiency
fixtures
during
operational phase:

Efficient use of treated water for
landscaping purposes.

Interruptible Flush Cistern Fittings.

Low water consumption Urinals
(Sensor Operated)

Flow Regulator/ Push Button taps.
Detailed water balance diagram is enclosed
5
as Annexure- 5.
The Project Proponent shall construct 24 Yes. We will construct 24 nos. rain water
nos. rain water harvesting pits for harvesting pits for recharging the ground
recharging the ground water within the water within the project premises. Rain
project premises. Rain water harvesting water harvesting pits will be designed to
pits shall be designed to make provisions make provisions for silting chamber and
for silting chamber and removal of removal of floating matter before entering
19.
floating matter before entering harvesting harvesting pit. Maintenance budget and
pit. Maintenance budget and persons persons responsible for maintenance will be
responsible for maintenance must be provided. Care will also be taken that
provided. Care shall also be taken that contaminated water do not enter any RWH
contaminated water do not enter any pit.
RWH pit.
The Project Proponent shall provide At the moment the construction cranes are
minimum
20.
one
hydraulic
ladder
of serving the purpose of hydraulic ladder for
sufficient length for escape of people in escape of people in case of fire during
case of fire during construction phase.
construction phase.
The Project Proponent shall submit We got the assurance from DHBVN to
assurance from the DHBVN for supply of supply the required power during the
4.5 MVA of power supply before the start operational phase. The same is enclosed as
21.
of construction. In no case project will be Annexure- 6.
operational solely on generators without
any power supply from any external
power utility.
Detail calculation of power load and The
detailed
electrical
calculation
is
ultimate power load of the project shall be submitted to DHBVN and we got the NOC
submitted to DHBVN under intimation to based upon that.
22.
SEIAA, Haryana before the start of The calculation is enclosed as Annexure-7
construction provisions shall be made for for your reference. The demand has been
electrical infrastructure in the licensed revised upwards and we are in the process of
area.
obtaining another permission from DHBVN.
6
The Project Proponent shall obtain NOC Already obtained. Attached as Annexure- 8.
23.
from nearest fire station before the start of
construction.
The Project Proponent shall not raise any The proposed project is not obstructing any
construction
24.
in
the
natural
land natural Nallah/ water course.
depression/ Nallah/ water course and shall
ensure that the natural flow from the
Nallah/ water course is not obstructed.
The Project Proponent shall keep the The Project Proponent will keep the plinth
plinth level of the building blocks level of the building blocks sufficiently
sufficiently above the level of the above the level of the approach road to the
25.
approach road to the Group Housing Group Housing project as per prescribed byproject as per prescribed by-laws. Levels laws. Levels of the other areas in the Group
of the other areas in the Group housing housing projects will also be kept suitably so
projects shall also be kept suitably so as to as to avoid flooding.
avoid flooding.
Construction shall be carried out so that Yes, the construction will be carried out to
26.
density of population does not exceed as maintain the population density as per
approved by Director General Town and DGTCP norms.
Country Department Haryana.
The Project Proponent shall submit an Undertaking regarding the same is submitted
affidavit with the declaration that ground to the Superintendent Engineer, HUDA and
27.
water will not be used for construction also got the NOC to use the treated water for
and only treated water should be used for construction
construction.
purposes.
Copy
of
the
undertaking is enclosed as Annexure- 9.
The Project Proponent shall not cut any Approval from Deputy Conservator of
existing tree and project landscaping plan Forest, Gurgaon for felling 4 no of trees
should be modified to include those trees which needs to be felled for basement
28.
in green area.
construction has been received. A copy of
the approval letter is enclosed as Annexure10. We will be planting 5 times of the cut
7
trees.
The Project Proponent shall provide Noted please.
helipad facility as required under NBC As per NBC 2005 norms, the provision of
norms for towers having height more than helipad for buildings higher than 60 mtrs is
60 mtrs.
covered in Annex-C, Part-4, Chapter on Fire
and Lift Safety. The Para “C-0, General”
mentions that “In addition to the general
provision given in this part, the Authority
may insist on suitable protection measures
29.
(C-1 to C-11)in a building 15 m in height &
above”. The Para C-10 mentions that for
high rise buildings 60 m in height provision
of helipad should be made. While approving
the building plan of this group housing
colony from Fire & Life safety point of
view, the Fire department has not insisted/
asked/ directed us to provide the helipad.
The Project Proponent shall ensure that ECBC norms for composite climate zone
ECBC norms for composite climate zone will be met. In particular building envelope,
30.
is met. In particular building envelope, HVAC service, water heating, pumping,
HVAC service, water heating, pumping, lighting and electrical infrastructure will
lighting and electrical infrastructure must meet ECBC norms.
meet ECBC norms.
The Project Proponent shall install dust Yes. Being complied with.
31.
screen during construction.
The
32.
Project
Proponent
shall
obtain Permission
Airport
Authority
permission of Airport Authority regarding regarding height clearance is received.
Height clearance before the start of A copy of the same is enclosed as
construction.
33.
from
Annexure- 11.
The Project Proponent shall keep the The project is outside the influence zone of
8
plinth level of the building above the HFL Najafgarh Jheel. Still the plinth level is
(High Flood Level) of the Nazafgarh higher than HFL of Najafgarh Jheel/ drain.
Jheel/ drain attained in last 100 years.
The Project Proponent shall obtain NOC Najafgarh Jheel is far away (approx. 10 km
from
34.
HUDA
department
as
well
before
as
the
Irrigation away). Hence no effect is envisaged.
start
of Moreover, the Jheel falls in the Delhi State
construction, regarding possible adverse boundary where
HUDA
and
Haryana
effect of project proposal on the said Irrigation department is not the competent
Najafgarh Jheel.
Authority.
The Project Proponent shall provide The Project Proponent is provided mobile
mobile sulabh toilets instead of soak pit sulabh toilets instead of soak pit during
35.
during construction phase for disposal of construction phase for disposal of sludge.
sludge.
Operational Phase
a.
The Sewage Treatment Plant (STP) shall The STP will be installed for the treatment
be installed for the treatment of the of sewage generated to the prescribed
sewage
to
the
prescribed
standards standards including odour and treated
including odour and treated effluent will effluent will be recycled to the maximum
be recycled to achieve zero discharge. The extent possible to achieve Zero Discharge.
installation of STP should be certified by Feasibility report of STP is enclosed as
an independent expert and a report in this Annexure- 12.
regard should be submitted to the SEIAA,
Haryana
before
the
project
is
commissioned for operation. Tertiary
treatment of waste water is mandatory.
Discharge
of
treated
sewage
shall
conform to the norms and standards of
HSPCB, Panchkula.
b.
Separation of the grey and black water Separation of grey and black water will be
should be done by the use of dual done by the use of dual plumbing line as it is
9
plumbing line. Treatment of 100 % gray done
during
the
operational
period.
water by decentralized treatment should Treatment of 100 % grey water by
be done ensuring that the re-circulated decentralized treatment will be done.
water should have BOD maximum up-to
10 ppm and the recycled water will be
used for flushing, gardening and DG set
cooling and running of fountain in the
water
body
to
achieved
zero
exit
discharge.
c.
For disinfection of the treated waste water Ultra violate radiation or ozonization will be
ultra-violate
radiation
or
ozonization provided.
process should be used.
d.
The solid waste generated should be During the operational phase the solid waste
properly collected and segregated. Bio- will be collected & segregated as per solid
degradable waste shall be decomposted at waste management plan which is enclosed
site and dry/ insert solid waste should be as Annexure- 13. Biodegradable garbage
disposed off to approved sites for land will be sent for composting and dry/inert
filling
after
recovering
recyclable solid waste would be disposed off to
material.
approve sites for land filling after recovering
recyclable material.
e.
Diesel power generating sets proposed as DG sets has been proposed in case of power
source of backup power for lifts, common failure. Acoustic enclosures will be provided
area illumination and for domestic use to the DG Sets with adequate stack heights
should be of enclosed type and conform to as per CPCB norms. In addition these DG
rules
made
under
the
Environment sets will be run on low sulphur diesel only
(Protection) Act, 1986. The location of (Sulphur content < 0.25%).
the DG sets should be in the basement as
promised by the project proponent with
appropriate stack height as per the CPCB
norms. The diesel used for DG sets should
10
be of low sulphur contents (Maximum
0.25%)
f.
Ambient noise level should be controlled Ambient noise level will be controlled
to ensure that it does not exceed the within and at the boundaries of the project
prescribed standards both within and at ensuring compliance to regulatory norms.
the boundary of the proposed residential
complex.
g.
The project proponent should maintain at About 28470.875 m2 (30% of total plot area)
least 20% as green cover area for tree is being developed for tree plantation
plantation
especially
all-round
the purpose in which 20% under tree plantation
periphery of the project and on the road and
remaining
13%
will
be
under
sides preferably with local species so as to landscaping.
provide protection against particulates and Species used will be endemic and chosen to
noise. The 10% open spaces inside the provide protection from Dust and noise. In
plot should be preferably landscaped and addition open spaces within the boundaries
covered with vegetation/ grass, herbs & will be landscaped whenever possible and to
shrubs. Only locally available plant the maximum extent.
species shall be used.
h.
Weep holes in the compound walls shall Weep holes will be provided in the
be provided to ensure natural drainage of compound walls to ensure natural drainage
rain water in the catchments area during as per requirement.
the monsoon period.
i.
Rain water harvesting for roof run-off and Rain water Harvesting as per plan for roof
surface run-off, as per plan submitted run-off
should
be
implemented.
and
surface
run-off
will
be
Before implemented. Suspended matter, oil and
recharging the surface run-off, pre- grease will be removed by treatment before
treatment through sedimentation tanks recharging with surface run-off. The bore
must be done to remove suspended well for recharge will be kept at least 5 mts.
matter, oil and grease. The bore well for Above the highest ground water table
rain water recharging should be kept at
least 5 mts. Above the highest ground
11
water table. Care shall be taken that
contaminated water do not enter any
RWH pit.
j.
The ground water level and its quality Ground water level and its quality will be
should
be
monitored
regularly
in monitored at regular intervals during the
consultation with Central Ground water operational phase.
Authority.
k.
There should be no traffic congestion near Parking will be completely internalized and
the entry and exist points from the roads no public space will be utilized. Care will be
adjoining the proposed project site. taken to ensure that there is no traffic
Parking should be fully internalized and congestion at the entry and exit points.
no public space should be utilized.
l.
A report on the energy conservation Report on energy conservation measure
measures
conforming
to
energy conforming to energy conservation norms
conservation norms finalize by Bureau of finalized by BEE will be prepared, which
Energy Efficiency should be prepared will include details of building materials and
incorporating
details
about
building technology, R & U factors etc.
materials & technology; R & U factors
etc. and submit to the SEIAA, Haryana in
three months time.
m.
Energy
conservation
measures
like Energy
conservation
measures
like
installation of CFLs/TFLs for the lighting installation of CFLs/ TFLs for lighting the
the areas outside the building should be areas outside the building would be integral
integral part of the project design and part of the project design and would be in
should
be
in
place
before
project place before project commissioning. Used
commissioning. Used CFLs and TFLs CFLs & TFLs would be properly collected
should be properly collected and disposed and disposed off/ sent for recycling as per
off/sent for recycling as per the prevailing the prevailing rules/ guidelines of the
guidelines/rules
of
the
regulatory regulatory authority to avoid Mercury
authority to avoid mercury contamination. contamination. Use of solar panels will be
12
Use of solar panels must be adapted to the done to the extent possible. Energy saving
maximum extent possible for energy calculation is enclosed as Annexure- 14.
conservation.
n.
The solid waste generated should be The solid waste generated would be properly
properly collected and segregated as per collected
&
segregated.
Biodegradable
the requirement of the MSW Rules, 2000 garbage would be sent for compositing and
and as amended from time to time. The dry/ inert waste would be disposed off to
bio-degradable
waste
should
be Govt. approved sites for land filling.
composted by vermi-composting at the
site ear marked within the project area and
dry/inert solid waste should be disposed
off to the approved sites for land filling
after recovering recyclable material.
o.
The provision of the solar water heating Solar water heater system will be as per
system shall be as per norms specified by norms and will be made operational in each
HAREDA and shall be made operational building block.
in each building block.
p.
The traffic plan and the parking plan Parking will be completely internalized and
proposed by the PP should be adhered to no public space will be utilized. Care will be
meticulously
with
further
scope
of taken to ensure that there is no traffic
additional parking for future requirement. congestion at the entry and exit points.
There should be no traffic congestion near
the entry and exit points from the roads
adjoining the proposed project site.
Parking should be fully internalized and
no public space should be used.
q.
The project shall be operationalized only We have got the assurance from HUDA to
once HUDA will provide domestic water supply of adequate water for domestic
supply system in the area.
purpose and please refer Annexure- 3 for
the same.
13
r.
Operation and maintenance of STP, solid Operation and maintenance of STP, solid
waste
management
and
electrical waste
management
and
electrical
infrastructure shall be ensured even after infrastructure will be done.
the completion of project.
s.
Different type of wastes should be The wastes will be disposed off as per the
disposed
off
as
per
provisions
of prescribed norms of Govt.
municipal solid waste, biomedical waste,
hazardous waste, e-waste, batteries &
plastic rules made under Environment
Protection Act, 1986.
t.
Standards for discharge of environmental Standards for discharge of environmental
pollutants
as
enshrined
in
various pollutants as enshrined in various schedules
schedules of rule 3 of Environment of rule 3 of Environment Protection Rule,
Protection Rule, 1986 shall be complied 1986 will be complied with..
with.
u.
Water supply shall be metered to different Water supply will be metered to different
residential units and different utilities.
residential units and different utilities
PART-B GENERAL CONDITION
i.
The Project Proponent shall ensure the Yes. Will be ensured.
commitments made in Form- 1, Form1A, EIA/EMP and other documents
submitted to the SEIAA for the protection
of
environment
and
proposed
environmental safeguards are complied
with in letter and spirit.
ii.
Six monthly monitoring reports should be Monitoring report based on baseline data
submitted to the HSPCB and Regional collected on Sept, 2013 and Nov, 2013 is
Office. MOEF, GOI, Northern Region, enclosed as Annexure- 15. A copy of the
Chandigarh and a copy to the SEIAA same will also be submitted to Regional
Panchkula, Haryana.
Office. MOEF, GOI, Northern Region,
Chandigarh and SEIAA Panchkula, Haryana
14
iii.
The SEIAA, Haryana reserves the right to Yes. Agreed.
add
additional
subsequently,
safeguard
measures
found
necessary.
if
Environmental Clearance granted will be
revoked
if
it
is
found
that
false
information has been given for getting
approval of this project. SEIAA reserves
the right to revoke the clearance if
conditions stipulated are not implemented
to the satisfaction of SEIAA/ MoEF.
iv.
The project proponent will not violate any The project proponent will not violate any
judicial orders/ pronouncements issued by judicial orders/ pronouncements issued by
the Hon’ble Supreme Court/ High courts.
v.
the Hon’ble Supreme Court/ High courts.
All other statutory clearances such as the All other statutory clearances such as the
approvals for storage of diesel from chief approvals for storage of diesel from chief
Controller
of
Explosives,
Fire Controller of Explosives, Fire Department,
Department, Civil Aviation Department, Civil
Forest
Conservation
Act,
1980
Aviation
and Conservation
Act,
Department,
1980
and
Forest
Wildlife
Wildlife (Protection) Act, 1972, Forest (Protection) Act, 1972, Forest Act, 1972,
Act, 1972, PLPA 1900 etc. shall be PLPA 1900 etc. will be obtained, as
obtained,
Proponents
as
applicable
from
the
by
Project applicable.
respective
Authorities prior to construction of the
project.
vi.
The Project Proponent should inform the Copy enclosed as Annexure- 16.
public that the project has been accorded Public notice w.r.t. grant of Environmental
Environment Clearance by the SEIAA Clearance given in the two leading national
and copies of the clearance letter are dailies (Hindustan Times & Times of India)
available with the State Pollution Control on 17-10-2012.
Board
&
SEIAA.
This
should
be
advertised within 7 days from the date of
15
issue of the clearance letter at least in two
local
newspapers
that
are
widely
circulated in the region and the copy of
the same should be forwarded to SEIAA,
Haryana. A copy of the Environment
Clearance conditions shall also be put on
Project Proponent’s website for public
awareness.
vii.
Under the provisions of Environment Construction activity at site measuring
(Protection) Act, 1986, legal action shall 23.431 acres started as per provision after
be initiated against the Project Proponent obtaining
the
Environmental
Clearance
if it was found that construction of the dated 27-12-2012.
project has been started before obtaining The construction activity started only after
environmental clearance.
obtaining Environmental Clearance as per its
provisions and in accordance with the
provision of Licence no. 21 of 2008 dated
08-02-2008 and Licence no. 28 of 2012
dated 07-04-2012. We have not violated any
provision of EIA notification 14th Sept,
2006. The construction at site has been
initiated in accordance with various Acts,
Rules,
Regulations
and
Permissions
including the Environment Clearance issued
on 27.12.2012. The contract/ work order for
starting the construction of group housing
project “Windchants”, Sector- 112, Gurgaon
as per the approved building plans vide
DGTCP memo no. ZP-595/ JD (BS)/ 2012/
9781 dated 07-06-2012 was awarded on 0502-2013.
16
viii.
ix.
Any appeal against the this Environmental Yes. Agreed.
Clearance shall lie with the National
Green Tribunal, if preferred, within a
period of 30 days as prescribed under
Section 16 of the National Green Tribunal
Act, 2010.
The Project Proponent shall put in place The HSE policy is in place in different
Corporate
Environment
Policy
as locations of the project sites and in offices.
mentioned in MoEF, GoI OM No. J11013/41/2006-IA II (I) dated 26-04-2012
within 3 months period.
x.
The fund ear-marked for environment Fund of Rs. 221 lakhs has been created for
protection measures should be kept in environment
protection
measures.
The
separate account and should not be amount will not be diverted for other
diverted for other purposes and year-wise purposes.
expenditure shall be reported to the
SEIAA/RO
MoEF
GoI
under
rules
prescribed for Environment Audit.
xi.
The Project Proponent shall obtain NOC We got the Aravalli NOC from DC,
under Aravalli Notification from CEC of Gurgaon and a copy of the same is already
Hon’ble
Supreme
Court
regarding enclosed as Annexure- 4.
coverage under Aravalli Notification.
17