Board Meeting: 3 - 4 September 2012 Agenda Number: 4 File Reference: AD0100 LORD HOWE ISLAND BOARD Business Paper Chief Executive Officer Report to September 2012 meeting of the LHI Board The following briefing provides an overview of key issues managed by the Board during the reporting period, and their status. It is intended that this document be available to the public as part of the minutes of the meeting. Matters which are subject to confidentiality, business in confidence or legal action are shaded and are not included in the public copy of the report. Number of items excluded from this public edition: Business & Corporate Service Report Reason: Business in Confidence MATTER STATUS Governance Review The Hon Murray Gleeson AC has completed a review of governance arrangements on the island. Mr Gleeson visited the island in April and submitted a report to the Premier in June 2012. The Premier is currently considering the report’s recommendations. The NSW and Australian Governments have recently announced funding for two of the island’s important environmental projects. The Minister for the Environment, Robyn Parker, has awarded $1.5m million over 3 years to the Board for continuation of the island’s weed eradication program. In July the NSW and Australian Governments jointly announced $9 million funding for the eradication of rodents from the island. The former LHI Board Chair, Mr Alistair Henchman, resigned from role in July 2012. Under the Act the Minister shall appoint a Board member representing the Office of Environment & Heritage and a new Chairperson. The Board acknowledges Mr Henchman’s important contribution to the island. The Board was directed by the Minister under section 10 of LHI Act to defer completion of Category B dwelling process until Gleeson governance review was completed. The process is still on hold pending announcement of outcomes by Premier. Progress of the Board’s new policy to guide future dwelling allocations is also on hold. Transport for NSW recently announced the State Government is calling Expressions of Interest for new air licences to connect Sydney (Kingsford Smith) Airport to regional areas in NSW including Lord Howe Island. Announcement of EOI expected in October 2012. Grant funding Chairperson Lord Howe Island Board Category B Air Service ACTION REQUIRED BY BOARD AT THIS MEETING For Information See agenda item 11 (ii) For information For Information For information 2011/12 Financial Statements The Board’s draft 2011/12 financial statements have For recorded a Net Operating Result of $2.68 million and Total information Comprehensive Income of $8.12 million. The financial statements have been submitted to the Board’s external auditors for endorsement prior tabling in parliament and presentation in Board’s Annual Report. INFRASTRUCTURE AND ENGINEERING SERVICES Includes Works, WMF and Electrical units Works Unit Building Construction, Maintenance and Management: General maintenance of Board properties ongoing in accordance with the Works Unit Maintenance plan. Minor maintenance has been undertaken on the LHIB Boatshed including protecting exposed electric cables (cables not in the required conduit). The Liquor store shed was lined as per the NSW Food Authority recommendation. Powerhouse Building construction continued (see separate paper) Replaced floor to Phasmid enclosure Slab for new glass crusher installed at WMF Visitor facilities safety audit conducted and identified actions completed. Wharf Jetty, fenders and handrails checked for loose bolts and fittings. Aluminium steps cleaned with chlorine to remove algae. Airport Landscaping, grounds maintenance and mowing of the grass apron and parking areas ongoing. Two Bird Strikes reported for the period (Plovers) Bird Hazard Management plan amended and submitted to BAHMC for endorsement. Annual Aerodrome Technical Inspection completed in July, several recommendations not affecting operational status were made, however the survey indicated the Blinky Dune needs to be lowered to bring the takeoff, approach and transition Obstacle Limitation Surface (OLS) into compliance with the Manual of Standards Part 139 as a result a Development Application has been submitted for consideration at the September Board Meeting. Builders arrived on the 28th August to install the new Qantaslink Check-in counter and associated storage facilities. A contract has been awarded to James Thompson for the provision of daily Aerodrome serviceability inspections. 2 - yearly Aviation emergency exercise conducted Tuesday 14th August, the exercise WAS carried out to ensure compliance with CASR 139. Roads, Parks and Visitor Facilities: Mowing and general maintenance of public space and picnic areas ongoing. Mowing plan prepared and under review by LHIB management Ongoing wet weather has resulted in significant damage to roads due to poor subgrade conditions. Additional potholing and resealing has been undertaken however failures continue to occur due to very wet subgrade. Emergency Management: No incidents reported for the period. Air Ambulance retrievals YTD total 29, the total for calendar year 2011 was 14 General items Telehandler, tractor and elevating work platform competency training undertaken week commencing 24th July. Board personnel assisted with the funeral arrangements for Gary Petherick and Judy Maddrill. Beach nourishment Pinetrees Boatshed to Windy Point undertaken August Waste Management Facility Wastewater filters cleaned and irrigation lines flushed out Re-use shed cleaned out, loose waste removed Monthly maintenance check performed on all WMF machinery Douse Fire Protection carried the annual fire extinguisher inspection. Accreditation training on Merlo Panoramic completed. JSA’s for WMF daily procedures completed. New interpretive signs for the WMF have been purchased. LHIB field operations 6 monthly OHS risk checklist completed. The annual low season Waste Audit was conducted. WMF staff have been working with some of the larger island businesses to help them reduce the amount of waste they generate (i.e. on site composting, minimize the use of bin liners and staff education). A septic and grease trap year plan has been established and all parties involved with pumping and delivering septic/grease waste have been informed in writing of the arrangements that must be made before delivery. A new vertical feed auger on the VCU have has been installed and the VCU is operating normally again. A new top feed auger was purchased along with the vertical auger; this will be installed when the old one wears out (probable in the near future). The new Andela Glass Crusher has been installed and began operating on 28th July. Between the 28th July and 11th August the crusher operated for approximately 10 hours crushing approximately 12 ton of glass. On the 11th August an electrical fault caused the crusher to stop operating. At the time of this report the SEO is investigating the issue. Total waste volumes received at WMF for 2011/12 are presented below. Electrical Services Unit Overview of Activities Routine maintenance on Generating Units 1, 2 and 3 was completed. Routine maintenance on Generating Unit No.1 air circuit breaker was completed. Routine maintenance on Generator No.2, 3 and control board battery chargers was completed. Routine maintenance on Genset 2 and 3 day fuel tanks and pump gear was completed. Routine maintenance Generator 1, 2 &3 battery banks was completed. Routine maintenance on Substations No.6 Middle Beach Road and associated distribution pillars was completed. Supply load surveys were carried out on Substations No. 6 and associated distribution pillars. Distribution pillars were monitored for their voltage levels. All voltage levels in the surveyed areas were within acceptable limits Information for Board Members Energy demand for the reporting period was 566 400 kWh compared to 585 600 kWh last year. A decrease of 3.27 % Fuel consumption for the reporting period was 145 100 litres compared to 149 200 litres last year. A decrease of 2.74 %. Fuel energy efficiency for the period was 3.90 kWh / litre compared to 3.92 kWh / litre for the same period last year. A decrease of 0.5 %. The Series 60 diesel engines continue to provide excellent fuel efficiency during operation. Maximum demand for the period was 417 kW compared to 465 kW for the same period last year. This maximum demand was recorded at 7.10 pm on 12th June. There were two powerhouse supply interruptions during the period. The first at 1.10 am on 22nd June was caused by a cracked fuel line fitting on Genset 3. This resulted in a loss of supply for approx. 30 minutes whilst the faulty fitting was replaced. The second outage occurred at 8.05 pm on 5th August and was caused by a fuel level shutdown alarm on Genset 1. This resulted in a loss of supply for approx. 7 minutes whilst the shutdown alarm was reset. There were no localized supply interruption during the period. The construction of the new powerhouse is continuing with all major building construction works now being completed. Installation of the new exhaust systems have been completed. Installation of ventilation system wiring is near completion and control room, plant room and partial workshop light and power wiring have also been completed. Work has begun on the installation of the new earthing system for both powerhouse, substations and standby generator installations. The new powerhouse switchboard is due for delivery on 1st September. Once installed this will allow major generator, substation and building wiring service works to be completed. There are presently 279 customers connected to the supply system. Four additional private solar array installations have been installed / commissioned on customer residences. There are now seven installations successfully feeding excess generation back into the island electrical grid in accordance with LHIB policy. WASTE MANAGEMENT ANNUL REPORT Summary WASTE VOLUMES PROCESSED WASTE VOLUMES EXPORTED MATERIALS MATERIALS FOOD/WASTE SCRAP/METAL ALUMINIUM ENGINE/OIL TYRES PAINT 20L/BUCKET WEIGHT WEIGHT M3 WEIGHT BAILS WEIGHT BAILS WEIGHT WEIGHT WEIGHT LITRES NUMBER WEIGHT BATTERIES WEIGHT CHEMICALS ST/VINIES/CLOTHS WASTE/GENERAL WEIGHT BAILS BAILS WEIGHT WEIGHT PAPER/CARD GREENWASTE GLASS PLASTIC/RECYCLE MAGAZINES WASTE/BUILDING BUILDERS RUBBLE TREAT/EFFLUENT WEIGHT LITRES 11480 133168 60966 150 74520 35 8750 845 2541 35610 800 4600 2000 0 FOOD/WASTE 1750 282506 LHI SEA FREIGHT JRR TRANSPORT & Disposal JR Richards SKIP HIRE TOTAL BUILDING WASTE FEES CHARGED M3@ $230 Whitegoods@ $30 mattress@ $20 skip hire@$95.70 TOTAL $ 7,362.84 $ 19,501.90 $ 26,981.76 $ 6,075.02 $ 59,921.52 $12,493.18 $1,410.00 $340.00 $478.80 $14,721.98 BATTERIES WEIGHT CHEMICALS ST/VINIES/CLOTHS WASTE/GENERAL WASTE/BUILDING WEIGHT BAILS BAILS WEIGHT WEIGHT BUILDERS RUBBLE WEIGHT TREAT/EFFLUENT LITRES MAGAZINES TRANSPORT AND DISPOSAL COST FOR PERIOD LHI TRANSPORT SCRAP/METAL ALUMINIUM ENGINE/OIL TYRES PAINT 20L/BUCKET WEIGHT WEIGHT M3 WEIGHT BAILS WEIGHT BAILS WEIGHT WEIGHT WEIGHT LITRES NUMBER WEIGHT PAPER/CARD GREENWASTE GLASS PLASTIC/RECYCLE 920 920 13 115 55720 25440 WASTE TRANSPORT 0 0 0 0 12400 35 8750 845 2541 35610 800 4600 2000 0 920 920 13 115 55720 25440 MATERIALS RECYCLES BUILDING WASTE RESIDUAL WASTE OTHER TOTAL SKIPS CUBIC METRES 3.5m3skip 27 23 0 0 50 175 Financial year To 30 June 2012 Direct Waste Costs $ LHIB Operations Costs $ Balance cost to LHIB $ 59,922 283,450 Sourced from Practical 343,400 Waste fees Cost recovery subtotal Net Impact (including levy from 281,974 Practical) 18,473 from practical 300,447 42,953 $ $ $ -$ 1750 0 RECYCLE PRODUCTES SOLD RATE WEIGHT PER (t) TONNE practical PRODUCT practical STEEL practical MIXED PLASTIC 7,112 varies MAGAZINES 1,369 varies ALLY/CAN 22,953 varies 800 varies BATTERIES 0 varies COPPER/BRASS 0 varies GLASS TOTAL FOR RECYCLES 0 varies 3m3 2m3 skip skip PALLET OTHER 0 0 30 6 0 1 0 0 57 0 0 0 0 0 20 6 57 1 50 12 171 2 0 0 AMOUNT $ 1,686 $ 744 $ 65 $ 320 $ $ $ $2,814.15 (cost recovery) ENVIRONMENT & COMMUNITY DEVELOPMENT General Policy and Planning Prepare draft development assessment policy and procedures Prepare draft community grants policy Finalise Operations Plan 2011-12 Prepare Operations Plan 2012-13 and associated budget Project Management of Environmental Grants (separate Board Paper) Biodiversity Management Conduct Woodhen telephone conference regarding survey methodology Liaise with Office of Environment and Heritage (OEH) Research Branch on planning Captive Management Workshop Review Little Shearwater research report Undertake surveys of threatened plant Chamaesyce psammogeton on Blinky dune for threatened species assessment Seek renewed licence for disturbance to sooty terns on Blinky dune as part of ongoing implementation of LHI Aerodrome Bird & Animal Hazard Management Plan Research The following research applications have been assessed and approved since 29 May 2012: Name Mr. Hank Bower Organisation Project LHIB To establish Birdlife Australia Atlas sites to enable visitors and residents to undertake bird surveys & submit Atlas forms to monitor bird populations on Lord Howe Island. During the above period, the research facility was used by the following persons: Name Silvia Kadrabova No. People 1 Project Volunteer Weeder Address C/O O’Reillys Guest House Lamington NP Qld. Undertake minor maintenance at the research facility Prepare feedback form for visitors Pest Management Undertake firearms audit and control of pest birds Obtain authorisations for staff as Inspectors under the Plant Diseases Act Submit grant variation with NSW Environmental Trust for African Big-headed Ant program Quarantine Two incoming international vessels without quarantine clearance sought approval to harbour at LHI. One required fuel and the other sought medical attention for a sailor. Rodent Eradication Commence planning to implement the Lord Howe Island Rodent Eradication project (see separate paper) Renew Rodent Control contract for 2012-13 financial year Undertake trial of 2 Ekomille rodent trap units to test efficacy as an addition to revised baiting protocol Weed Management Refer to Environmental Grants Progress Report Prepare Draft Work and Development Plans for Grade 4+ staff Implement on ground works at priority blocks to address weed eradication targets Support Friends of LHI and attend AGM. Northern Rivers CMA – prepare new contract for 2012-13 Review Weeds of National Significance strategic plans (Asparagus Weeds/ Madeira Vine) Undertake weed risk assessments Review Job Safety Analyses Revegetation Update LHIB revegetation and rehabilitation plan (in progress) Undertake maintenance of reveg sites in accordance with Revegetation Work Schedule Undertake infill planting Propagation of native species at LHIB Nursery Compliance Investigate unauthorised vegetation removal and damage to threatened species habitat, prepare breach report and statements Review implementation of Remediation Direction Implement Remediation Directions Follow-up with dog owners regarding registration and training requirements Assess requests for tree removal Review of plant importation applications Continue noxious weed inspections and follow-up Incident Management Assist with transfer from Endeavour Community Programs & Education Provide content for LHIB website Prepare draft Bulletin articles Prepare draft Fact Sheets on rodent eradication, quarantine (incl. phytophthora and myrtle rust), weed eradication, volunteer programs etc. Prepare draft signage on White Terns Planning for interpretative signs at Post office, Museum and Airport Assist with Transit of Venus program Cultural Heritage Follow-up progress on NSW State Heritage Inventory forms as part of Lord Howe Island Community Based Heritage Study Visitor Infrastructure Complete design of Boat Harbour walking track bridge Continue walking track upgrade at Mt Eliza Maintenance of facilities at North Bay Maintenance of walk through Phytopthora boot scrub bays (x3) at track heads Repair and maintain fences Develop feedback form and undertake general maintenance of research facility Water bottle refill stations delivered Marine Management / Moorings Monthly visual inspections and maintenance of moorings in association with Marine Parks as per the Memorandum of Understanding between the LHIB and MPA. Coordination of mooring bookings and allocations Finalise insurance claim for alleged damage to the yacht ‘Next Moment’ Human Resource Management Develop ECD Unit Staffing Strategy Coordinate workplace improvement program, Prepare evidence for NSW Industrial Relations Commission hearing Complete recruitment of Bush Regeneration Supervisor Undertake recruitment process for temporary Bush Regeneration positions in Environment Unit Training TAFE delivered training to staff in Conservation Land Management - Certificate 3 Qualification Environmental Assessment Ecological assessments for all OC / DAs Tree assessments Land Administration & Environmental Planning Refer to separate papers for OC / DAs approved under delegated authority Other: Continue LEP review process Continue with review of Significant Native Vegetation mapping Request NSW Land & Property Information to undertake LiDAR surveys Provide planning advice on proposal to reduce the height of Blinky Dune Prepare tender documents for renewal of Planning & Assessment Contract Permissive Occupancy - Telstra’s telecommunications facility on Portion 327 Permissive Occupancy – Pinetrees Boatshed Geoscience Australia - Request to replace fence at ATWS site Request to move Business Identification Sign, LHI Bowling Club Proposal to relocate antenna and cable to Cargo Shed Building Health & Building Obtain advice on relevant OC and DA regarding compliance with the Food Act and Aust Standards. Follow-up Food Safety Supervisor notifications Liaise with NSW Food Authority regarding meat / milk production. Review of Food Safety Plan for dairy facility Water Management Complete 1/4 potable water testing and treatment Complete ¼ ground water monitoring testing Continue Mosquito Surveillance & Vector Monitoring Program Management of LHIB drinking water supplies, including installation and maintenance of tanks, gutters, pipe work, first flush systems and pumps; Finalise proposal to install groundwater monitoring bores