Identification Prerequisites Language Compulsory/Elective Text books and course materials Subject Program Department Term Instructor E-mail: Phone: Classroom/hours MGT 870 Project Management 3KU/6ECTS credits Undergraduate Economics and Management Fall 2015 NarminShirinova n.shirinova@spm.az Saturday12:10-15:00, Room 306N 41 Mehseti street (Neftchilar campus), Khazar University None English Compulsory Core textbooks: Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge: (5th ed.). Project Management Institute. Harold Kerzner.(2009). Project Management: A Systems Approach to Planning, Scheduling, and Controlling Eric W.Larson, Clifford F. Gray. (2011). Project Management: The Managerial Process(5th ed.) Recommended Readings: Frigenti, Enzo; Cominos, Dennis. (2006) The Practice of Project Management (2nd edition) Morris, Peter W.G.; Pinto, Jeffrey K. (eds.). (2004)The Wiley Guide to Managing Projects, John Wiley. Teaching methods Evaluation Criteria ICB - IPMA Competence Baseline, Version 3, PMA/GPM-Eigenverlag 1999. Case analysis Group discussion Lab (Assignments) Lecture Project (with weekly essays) Others (videos) Methods Date/deadlines Percentage (%) 25 Mid term Exam 5 Case Studies 5 Class Participation Assignment and quizzes 15 Presentation/ Group discussion 10 Final exam 40 Others 100% Total Course level learning outcomes Outcome 1. Expectation Students understand the important Students can describe the core issues of a facts, project and various types of projects, terminology, concepts, principles, and theories in the area of explain the difference between projects Project Management and ongoing activities. Page 1 of 3 2. Students can explain the core issues 3. 4. Students can analyze and develop goals, of goal, scope, and baseline. scopes, and baselines The student is able to explain criteria Students can analyse and develop criteria for success and failure in projects. for success and failure The student understands the concept of Students canidentify stakeholders and their stakeholders roles and the roles of stakeholders in a project. 5. The student can explain main standards for project management. Students analyse theproject and organization characterize project organization Week and the context of a project 1 Tentative Schedule Topics Date (tentative) 19.09.2015 Introduction to Project Management 2 26.09.2015 Organization: Structure and Culture 3 3.10.2015 Project Life Cycle 4 10.10.2015 Project Management Process Groups. Knowledge Areas 5 6 17.10.2015 24.10.2015 Stakeholder Management 7 31.10.2015 Developing a Project Plan 8 07.11.2015 9 10 Definition of project Textbook/Assignments Ch1(PMBOK), group discussion Ch2 Ch3 (Larson) case study Ch2 (PMBOK) work assignments, group discussion Ch3 (PMBOK) assignments, group discussion, assignment Ch 10 (PMBOK) Ch4 (Larson) work assignment, team work(WBS) Ch 6 (Larson) case study, team work Midterm Exam Evaluation of the course Risk management Ch7.(Larson) Case study Leadership Ch 10 Case Study, Essay, assignment 14.11.2015 21.11.2015 Page 2 of 3 11 28.11.2015 12 05.12.2015 13 12.12.2015 14 19.12.2015 15 26.12.2015 16 Will be announced Teams Ch 11Case Study, Essay, assignment Managing International Projects Ch15 work assignments, Outsourcing Ch15 work assignments Project Closure Ch14 work assignments. Presentation Monitoring Progress Ch13 work assignments, Case Study Final exam Evaluation of the course Page 3 of 3