API 17N Subsea Production System Reliability and Technical Risk Management Don Wells Hess Corporation History / Status • Document released in 2009 • Specification contains: – Life Cycle Process (LCP) – Define, Plan, Implement, Feedback (DPIF) Loop – 12 Key Practices (KP) – Technology Qualification Process – Technology Readiness Level Why Change? • BSEE Wants: – Prevent Prescriptive Standards – Self-regulation by the Industry • Issues with 17N: – Operational Goals & Requirements – Unbalanced Life Cycle Processes – Technology Readiness Level Use & Implementation Plan / Path Forward • Process – Split into 5 subgroups – Industry Leaders – Common Template • Introduce IM into the scope of 17N: – Define IM – Expand the Life Cycle Processes – Reassessment through remediation – Define TRL progression Detail • Expand the LCP – Provides balance and depth to the document – Communication of goals & requirements Feasibility SIT, Installation, & Commissioning Operation Concept Selection Manufacturing & Assembly Decommissioning FEED Detailed Design 5 Detail • Change to a Dual-DPIF Loop • Define – Plan – Implement - Feedback – Add Remediation cycle – Facilitates Integrity Management Detail Detail Detail • Change to a Dual-DPIF loop – Add Remediation cycle – Facilitates Integrity Management Next • Remaining challenges: – – – – • • • • Incorporating Human Factors Decommissioning (Well Abandonment) Document Matrix Technology Qualification Appendix 17N is currently in first edition drafting Final Draft Review late-Q2 2013 Peer & Industry Review Q3 2013 Submittal Planned Q4 2013