Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess) Agenda • • • • • Introduction Membership General Plans / Progress Detail Progress Integration 17 Committee/ISO Introduction • Incorporate Integrity Management into current API 17N …Subsea Reliability and Technical Risk Management • Recognize and incorporate integration with other Industry initiatives • Incorporate updates based on feedback from using existing 17N document • Respond to recent industry experiences Membership • Organized into subcommittees 1. Design and Decommission 2. Manufacture, Assembly, SIT, Installation, Commissioning 3. Operations 4. Technology Qualification 5. Regulations • Room for additional membership • Opportunity to Make a Difference Membership • • • • • • • • • • • • • • • Chairman 2012 Don Wells – Hess Co-Chairman John Allen - GE Mark Siegmund – BP Champion John Strutt - Astrimar Record Keeper Adriana Botto – Wood Group I.M. Membership Lars Buus - DNV David Valentine – NASA – United Space Alliance Denver Roopchand – Atkins Dane Tipton – National Coupling Fuad Ahmad – Petronas James Cencula – GE • • • • • • • • • • • • • • • • Graeme Davies – DNV John Fassero – ExxonMobil Karl Woods – Woodside Martha Viteri – DNV Michael Taylor – FMC Mzahid Mamot – Petronas Paul Kefford – Chevron Reza Mostofi – DNV Ronald Pechacek – NASA – United Space Alliance Stephen May – Cameron Mike Theobald – Maersk Oil Karina Vitale – Chevron Runar Østebø – Statoil Jason Strouse – National Coupling Anibal Dam – BP John Macneill – Stress Engineering Mandate / Goals • Add Integrity Management to Current Document – Incorporate into all existing KPs & Stages from Concept to Installation / Commissioning • Add an Operations Stage / Section • Change Tone from Production to Integrity – Current tine reflects maximizing production – Will add Broader Integrity • Environment, etc. • Decide on Prescriptive vs. Safety Case • Ensure Tie-in with other API documents – i.e. API 17 V General Progress • 2010 – 2011 – Storming and forming - Complete – Gap Analysis – Mostly Complete – Added Runar Østebø – Statoil & convener of ISO/TC67 WG4 • 2012 - Planned – – – – Define Tone (prescriptive / recommend) Work the Gaps Work the Interfaces Industry Peer Assist Workshop (SURF IM Forum) Detailed Progress • Define Scope _ • Define Charter _ • Divide and Conquer…..Regular Subcommittee meetings 1. Design and Decommission • New Key Process (KP) for Through Life under development • Does API want Risk Based or Safety Case Approach? (Hybrid?) Detailed Progress Divide and Conquer – cont. 2. Manufacture, Assembly, SIT, Installation, Commissioning • Matrix Developed • Where & How to test being worked • Does Verification and Validation need new KP? (Rewrite KP06?) • MOC being worked Detailed Progress Divide and Conquer – cont. 3. Operations • Reviewed and Raised issues with existing 12 KPs • Proposed 3 additional KPs – Field Modifications – Inspection and Monitoring – Remedial Intervention • Added 3 Processes to “Project Phase Guide to Processes” Detailed Progress Divide and Conquer – cont. 4. Technology Qualification • New Risks Identified – commercial obsolescence • Keep integrated as a section in API 17N • Utilize DNV RP A-203 as much as possible • Completed Activities – Received industry feedback on main challenges with Qualifying Technologies – Strawman created for TQ section • Activities in Progress – Drafting started – Defining the proper use of TRLs • Path Forward – Consolidate and review individual sections Detailed Progress Divide and Conquer – cont. 5. Regulations • Managing Committees 1-4 Interfaces • Will lead Prescriptive vs. Recommend discussions • On hold until more definition / decisions from other committees Path Forward • Path Forward – Continue Subcommittee work – Outline of Process to use as QA tool – Common Matrix to combine / review completed work – Work the idea of using SURF IM Forum to discuss with industry and gather additional input • Write • Review • Ballot – still aiming for year end 2012 Integration • API 17A, API Q1 • ISO – 14224 - Collection and exchange of reliability and maintenance data for equipment – 20815 - Production assurance and reliability management – 15663 - Life Cycle Costing – TR 12489 - Reliability modeling and calculation of safety systems • Review committee draft document • Feedback 17N specific comments • DNV RP A203/API RP 17Q? Questions?