Monthly Management Report October 2012. Submitted By Facility Management Team Monthly Report-(Jul 2011) 1 EXECUTIVE - SUMMARY This report is a review on our performance during the last Month and is an attempt to analyse and evaluate our service delivery and make a progressive step forward with improvement plan. The following points are put forward for review 1. Scope and nature of services 2. Proposed manpower distribution. 3. Availability of manpower. 4. Major incidents summary. 5. Initiative taken. 6. Initiatives planned for next month. 7. Power failure analysis 8. Monthly HSD consumption. 9. DG- Generated power KWH. 10. EB power consumption. 11. Average power consumption EB+DG. 12. Liquid nitrogen consumption. 13. Suggestions and requirements. 14. Transition pending works. 15. Help desk, Complaint register 2 1.Scope & Nature of Services Electrical BMS Ultra pure water system CeNSE-Facility ETP RO Plant Management HVAC 3 Plumbing Help desk 2.PROPOSED MANPOWER DISTRIBUTION 1 1 2 4 1 3 3 4 FM TECHNOLOGIST CHILLER OPERATOR PLUMBER ELECTRICIAN BMS OPERATOR ASST.TECHNICIAN 3.Availability of Manpower DESIGNA TION Pl a n e d Jul11 Aug11 Sep11 Oct11 Nov -11 Dec11 Jan12 Feb12 Mar -12 Apr12 May -12 Jun12 Jul12 Aug -12 Sep12 Oct12 Facility Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Technolo gist 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Electricia n 4 0 2 3 3 4 4 4 4 4 4 4 4 4 4 4 4 Chiller operators 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 BMS operator 3 0 1 1 1 1 1 1 1 1 1 1 1 1 3 2 2 Plumbers 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 Asst.Tech nician 2 0 2 2 2 2 1 2 2 2 2 2 2 2 2 2 2 Total 1 5 4 10 11 11 13 12 13 13 13 13 13 13 13 15 14 14 5 4.Major Incidents Summary Date Location Failure details Action taken & Status 05-10-12 Utility Di water drained out Wet bunch tap was in open position 11-10-12 Cleanroom PCW filter damaged at wet etch area. Replaced the filter. 6 1. 2. 3. 4. 5. 6. 7. 7 5.Initiatives taken FPS- pressure gauge fixed near BMS. Cleanroom wet etch area – new pipe line provided at corridor. Scrap material shifted from open area. PCW pump o-rings fixed. LT panel room cleaned.(Which is maintaining by CCMD) ETP painting work done. General exhaust, chiller, AHU, DG, UPS, FPS PPM done. 6.Initiatives Planned for next month DG “B” check. New bore well water tap connection for chiller cleaning. Electrical system taking over- CeNSE. Partition of utility 2nd floor area. A/C works at UPS area 2nd floor utility. AHU all- filters changing. 8 7.POWER FAILURE ANALYSIS 9 S L Date From To Total 1 1-10-12 11:30, 15:45 11:50,16:00 35 Mins 2 7-10-12 11:05,18:15 11:30,18:30 40 Mins 3 10-10-12 9:10, 9:20 10 Mins 4 12-10-12 9:45 9:55 10 Mins 5 13-10-12 10:50 12:10 (20 times power fluctuation) 1:20 Hrs 6 14-10-12 15:00 15:15 15 Mins 7 22-10-12 13:35,16:35 14:05,16:45 40 Mins 8 30-10-12 12:45 13:00 15 Mins TOTAL HRS 6: 05 Hrs 8.MONTHLY HSD CONSUMPTION 10 9.DG Generated Power KWH 11 10. EB Power Consumption 12 11.AVERAGE POWER CONSUMPTION EB+DG 13 12.LIQUID NITROGEN CONSUMPTION 14 13.Suggestions and Requirements •Shelters to be provided for DGs, Utility terrace & Fire pump house to avoid rain water and leaves come inside the DG cabin, utility building & Raw water tank in side. • Shelter with closed fencing can make on the Fire tank & this area use as storage place. •Uniform & Safety shoes to be provided for all maintenance staffs. •Walky-talky to provided for maintenance staff. •Dg-1&2 (CeNSE Building) B-Check pending. •A/C for UPS to be provided. •Chemical & Gas cabinet exhaust to be provided. 15 14.Transition – Pending works • 16 15.Help desk, Complaints register 17 Thanks 18 by, Facility Management Team