Monthly Management Report November 2012. Submitted By Facility Management Team Monthly Report-(Jul 2011) 1 EXECUTIVE - SUMMARY This report is a review on our performance during the last Month and is an attempt to analyse and evaluate our service delivery and make a progressive step forward with improvement plan. The following points are put forward for review 1. Scope and nature of services 2. Proposed manpower distribution. 3. Availability of manpower. 4. Major incidents summary. 5. Initiative taken. 6. Initiatives planned for next month. 7. Power failure analysis 8. Monthly HSD consumption. 9. DG- Generated power KWH. 10. EB power consumption. 11. Average power consumption EB+DG. 12. Liquid nitrogen consumption. 13. Suggestions and requirements. 14. Transition pending works. 15. Help desk, Complaint register 2 1.Scope & Nature of Services Electrical BMS Ultra pure water system CeNSE-Facility ETP RO Plant Management HVAC 3 Plumbing Help desk 2.PROPOSED MANPOWER DISTRIBUTION 1 1 2 4 1 3 3 4 FM TECHNOLOGIST CHILLER OPERATOR PLUMBER ELECTRICIAN BMS OPERATOR ASST.TECHNICIAN 3.Availability of Manpower DESIGNA TION P la n e d Jul11 Aug11 Sep11 Oct -11 Nov -11 Dec -11 Jan12 Feb12 Mar -12 Apr -12 May -12 Jun -12 Jul12 Aug -12 Sep12 Oct -12 Nov -12 Facility Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Technolo gist 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Electricia n 4 0 2 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 Chiller operators 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 BMS operator 3 0 1 1 1 1 1 1 1 1 1 1 1 1 3 2 2 2 Plumbers 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 Asst.Tech nician 2 0 2 2 2 2 1 2 2 2 2 2 2 2 2 2 2 2 Total 1 5 4 10 11 11 13 12 13 13 13 13 13 13 13 15 14 14 14 5 4.Major Incidents Summary Date Location Failure details Action taken & Status 9-11-12 Cleanroom Plenum area Seepage water from ceiling from cafeteria drainage. Drain connection diverted as temporary arrangement. After that civil works done by Nano clean. 20-11-12 2nd floor Ele room CeNSE LDB MCB tripping due to MCB malfunctioning. MCB changed. 22-11-12 Characterization Lighting problem- Ballast changed 2nos ballast changed. Need to replace more damaged ballasts to complete the lighting issue. 6 5.Initiatives taken DG B check completed. CeNSE electrical system transmission done. CeNSE PA system repaired. Characterization PAC issue closed. 2Nd floor LDB tripping issue solved. Leak detector system installed. DG-4 surrounding area cleaned, bushes cut. PPM general exhaust, Wet exhaust, DG, UPS, ETP, RO, DI plants, FPS, Chiller, AHU, Pumps, PCW, Compressor, H Vacuum done. 7 6.Initiatives Planned for next month PCW water refilling with RO. CCTV old camera installation. VFD repair- PCW & Wet scrubber. New bore well water tap connection for chiller cleaning. Partition of utility 1st floor area. A/C works at UPS area 1st floor utility. AHU all- filters changing. DG-4 B check. DG-4 Exhaust extension works. PCW low level & emergency exit door alarm installation. 8 7.POWER FAILURE ANALYSIS 9 S L Date From To Total 1 3-11-12 15:30,18:20 15:40,18:30 20 Mins 2 4-11-12 15:40 15:50 10 Mins 3 15-11-12 16:20 16:40 20 Mins 4 16-11-12 11:05 11:20 15 Mins 5 30-11-12 11:15,13:10 11:25,13:20 20 Mins TOTAL HRS 1: 25 Hrs MONTHLY HSD CONSUMPTION 10 9.DG Generated Power KWH 11 10. EB Power Consumption 12 11.AVERAGE POWER CONSUMPTION EB+DG 13 12.LIQUID NITROGEN CONSUMPTION 14 13.Suggestions and Requirements •Shelters to be provided for DGs, Utility terrace & Fire pump house to avoid rain water and leaves come inside the DG cabin, utility building & Raw water tank in side. • Shelter with closed fencing can make on the Fire tank & this area use as storage place. •Uniform & Safety shoes to be provided for all maintenance staffs. •Walky-talky to provided for maintenance staff. •Dg-1&2 (CeNSE Building) B-Check pending. •A/C for UPS to be provided. •Chemical & Gas cabinet exhaust to be provided. 15 14.Transition – Pending works • 16 15.Help desk, Complaints register 17 Thanks 18 by, Facility Management Team