Monthly Management Report September 2012. Submitted By Facility Management Team Monthly Report-(Jul 2011) 1 EXECUTIVE - SUMMARY This report is a review on our performance during the last Month and is an attempt to analyse and evaluate our service delivery and make a progressive step forward with improvement plan. The following points are put forward for review 1. Scope and nature of services 2. Proposed manpower distribution. 3. Availability of manpower. 4. Major incidents summary. 5. Initiative taken. 6. Initiatives planned for next month. 7. Power failure analysis 8. Monthly HSD consumption. 9. DG- Generated power KWH. 10. EB power consumption. 11. Average power consumption EB+DG. 12. Liquid nitrogen consumption. 13. Suggestions and requirements. 14. Transition pending works. 15. Help desk, Complaint register 2 1.Scope & Nature of Services Electrical BMS Ultra pure water system CeNSE-Facility ETP RO Plant Management HVAC 3 Plumbing Help desk 2.PROPOSED MANPOWER DISTRIBUTION 1 1 2 4 1 3 3 4 FM TECHNOLOGIST CHILLER OPERATOR PLUMBER ELECTRICIAN BMS OPERATOR ASST.TECHNICIAN 3.Availability of Manpower DESIG NATIO N P l a n e d Jul- Aug 11 -11 Sep -11 Oct -11 No v11 De c11 Jan -12 Feb -12 Ma r12 Ap r12 Ma y12 Jun -12 Jul -12 Au g12 Sep -12 Facility Manag er 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Techno logist 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Electric ian 4 0 2 3 3 4 4 4 4 4 4 4 4 4 4 4 Chiller operat ors 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 BMS operat or 3 0 1 1 1 1 1 1 1 1 1 1 1 1 3 2 Plumbe 5 rs 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 4.Major Incidents Summary Date Location Failure details Action taken & Status 04-09-12 DGYard DG coolant water leakage. Informed to DG vendor, They rectify the issue. 08-09-12 SF-16 A/C not working Voltas people attended the complaint & resolve it. 18-09-12 Cleanroom GMS alarm activated Due to low exhaust,Reset the alarm. 29-09-12 Cleanroom Fire alarm activated False alarm, resetted. 6 5.Initiatives taken 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 7 Litho-2 extra power point provided. Vacuum cleaner shifted from Litho-2 to corridor area. AHU-3 Hepa filters changed. AHU-1&2 filters cleaned. DG- PPM done. Electrical oven shifted to litho-1 AHU -2 aluminum beading fixed for heaters. PCW pump PPM done. PA system at fab building – problem rectified. 20 KVA UPS load shifted to Centralized UPS. 6.Initiatives Planned for next month ETP painting works. DG “B” check. Chiller 1 circuit fault – to be resolved. New bore well water tap connection for chiller cleaning. Electrical system taking over- CeNSE. Shifting of pipes . Partition of utility 2nd floor area. A/C works at UPS area 2nd floor utility. General exhaust PPM. AHU all- filters changing. 8 7.POWER FAILURE ANALYSIS 9 SL Date 1 From To Total 02-09-12 11:30 11:40 10 Min 2 03-09-12 08:30 09:00 30 Min 3 04-09-12 07:40,8:15,9:00 07:50,8:35,14:50 6:20 Hrs 4 08-09-12 8:50,14:30 10:00,14:45 1:25 Hrs 5 15-09-12 11:10,15:00 11:20,15:10 20 Min 6 17-09-12 11:30,14:00 12:35,14:55 2 Hrs 7 23-09-12 13:15,20:20 13:30,20:35 30 Min 8 29-09-12 7:00,11:20,16:25 7:10,11:30,16:35 30 Min TOTAL HRS 11:35 Hrs 8.MONTHLY HSD CONSUMPTION 10 9.DG Generated Power KWH 11 10. EB Power Consumption 12 11.AVERAGE POWER CONSUMPTION EB+DG 13 12.LIQUID NITROGEN CONSUMPTION 14 13.Suggestions and Requirements •Shelters to be provided for DGs, Utility terrace & Fire pump house to avoid rain water and leaves come inside the DG cabin, utility building & Raw water tank in side. • Shelter with closed fencing can make on the Fire tank & this area use as storage place. •Uniform & Safety shoes to be provided for all maintenance staffs. •Walky-talky to provided for maintenance staff. •Dg-1&2 (CeNSE Building) B-Check pending. •A/C for UPS to be provided. •Chemical & Gas cabinet exhaust to be provided. 15 14.Transition – Pending works • 16 15.Help desk, Complaints register 17 Thanks 18 by, Facility Management Team