Monthly Management Report March 2012. Submitted By Facility Management Team Monthly Report-(Jul 2011) 1 EXECUTIVE - SUMMARY This report is a review on our performance during the last Month and is an attempt to analyse and evaluate our service delivery and make a progressive step forward with improvement plan. The following points are put forward for review 1. Scope and nature of services 2. Proposed manpower distribution. 3. Availability of manpower. 4. Major incidents summary. 5. Initiative taken. 6. Initiatives planned for next month. 7. Power failure analysis 8. Monthly HSD consumption. 9. DG- Generated power KWH. 10. EB power consumption. 11. Average power consumption EB+DG. 12. Liquid nitrogen consumption. 13. Suggestions and requirements. 14. Transition pending works. 15. Help desk, Complaint register 2 1.Scope & Nature of Services BMS ETP & Ultra Pure water system Electrical CeNSE-Facility Management Help desk HVAC Plumbing 3 2.PROPOSED MANPOWER DISTRIBUTION 1 1 2 4 1 3 3 4 FM TECHNOLOGIST CHILLER OPERATOR PLUMBER ELECTRICIAN BMS OPERATOR ASST.TECHNICIAN 3.Availability of Manpower DESIGNA TION Plan ed July11 August -11 Facility Manager 1 1 1 1 Technolog ist 3 3 3 Electricia n 4 0 Chiller operators 1 BMS operator 5 Septem Octob ber-11 er-11 Nove mber11 Dece mber11 Janua ry-12 Febru ary-12 Marc h-12 1 1 1 1 1 1 3 3 3 3 3 3 3 2 3 3 4 4 4 4 4 0 1 1 1 1 1 1 1 1 3 0 1 1 1 1 1 1 1 1 Plumbers 1 0 0 0 0 1 1 1 1 1 Asst.Tech nician 2 0 2 2 2 2 1 2 2 2 Total 15 4 10 11 11 13 12 13 13 13 4.Major Incidents Summary 6 Date Location Details Failure analysis 20-32012 Clean room At 15:00 Hrs Raw power failed and hooted activated. Raw power failed due to ACB trip at LT panel room 20-32012 Utility room MSB-2 10.00pm Capacitor bank contactors burst and connecting wires were burned Capacitor bank contactors burst and connecting wires were burned 5.Initiatives taken 12-3-12 – Compressor maintenance done. 12-3-12 – Compressor maintenance done. 14-3-12 – Along with CCMD people checked LT panel electrical 7 system for power fluctuation. 14-3-12- Old clean room electrical cables removed. 15-3-12- FF-05 UPS connection given as per Mr.Adinarayana murthi’s request. 19-3-12- ETP plant leakage arrested. 20-3-12- FF -16 Fax machine room light fitting fixed. 26-3-12- SF-04& SF-29 Raw power connection changed to UPS as requested by Mr.AN Murthy. 27-3-12- Timer fixed at Utility terrace lighting. 28-3-12- Sf-29 UPS power point extended. 28-3-12- Raysways connected at cafetaria 2nd floor. 6.Initiatives Planned for next month Fire evacuation training for users and staff. Signage fitting for fire exit plan for clean room. AHU planned preventive maintenance. 8 7.POWER FAILURE ANALYSIS 9 DATE FROM TO TOTAL 14-03-2012 15:20,15:40,15:45, 16:00,16:05 15:25,15:45,15:50, 16:05,16:10 25 Mins 20-03-2012 14:20,14:40,17:15, 17:50 14:30,17:10,17:40, 18:00 210 Mins 21-03-12 14:50,16:30 15:00,16:41 21mins 29-03-12 15:15,15:45 15:30,16:15 45 Mins TOTAL HRS 5:01 Hrs 8.MONTHLY HSD CONSUMPTION 10 9.DG Generated Power KWH 11 10. EB Power Consumption 12 11.AVERAGE POWER CONSUMPTION EB+DG 13 12.LIQUID NITROGEN CONSUMPTION 14 13.Suggestions and Requirements •Shelters to be provided for DGs & Fire pump house to avoid rain water and leaves come inside the DG cabin & Raw water tank in side. •FPS & FAS system to be commissioned as early as possible to face any crisis in the building. •PC with internet connection and telephone to be provided for maintenance team. •Chemical storage area to be separated with partition. •Safety shoes to be provided for all maintenance staffs. 15 14.Transition – Pending works • 16 15.Help desk, Complaints register 17 Thanks 18 by, Facility Management Team