Facilities Services Weekly Update Meeting 5/6/2015 9:00am Attendance: Kelli, Jessica, Fred, Ray, Kevin T, Kevin K, Rick, Doug, Pat, Ron Current Projects a. Vangstad i. Should start insulating interior walls in the basement this week. Building 2x6 support walls down the hallway. They will be insulating next week. Concrete, besides main entrance, is complete. The other contractors continue to move forward as we continue to work on change orders. b. Student Center Upper Lounge i. Meeting scheduled for 5/6 with Student Center staff. c. Flood Wall i. College Street will be closed on Thursday to replace the water line in the street. Will be reopened for Graduation (along with Viking Drive). ii. BEK will finish transferring their lines tomorrow. iii. Will need to plan a backup idea for Foss Hall to protect their equipment when the power is shut off. They have many items that need to be kept in a heat and humidity controlled area (grand pianos, etc). iv. Parking 1. Will confirm timeline for parking lot driveways in order to send out an update email today. d. Climate Control Upgrade i. No Update ii. Fred: if we could ask Climate Control about running a system on the ipad. They currently run on Java so it’s not compatible. e. McCoy/Snoey Basketball Court i. Waiting for budget information f. Back Alley i. No update g. Hill slide Waterfall i. We will put more rock up by the basin to help drainage. Won’t work on this until after graduation. h. McFarland 1st floor Water-proofing i. No update 2. Future Projects a. Fine Arts Building i. No update b. Heat Plant i. Asbestos sampling is being done today with ONE and Legend Technologies. JLG will be the architect for this job. c. Wellness Center i. Force Main Project 1. Took down fence Monday and ripped up concrete tennis court yesterday. There will only be one entrance into the shop (west side) until the force main project is completed. 2. KLJ is out staking the alleyway currently. 3. Ron: Thank you to everybody for helping move everything out at the garage. There was a lot to move and they were successful getting it done. 3. Other Projects a. Field House 1st Floor Bathroom Ceilings i. Project completed b. Track i. Met with the HS reps and there will be a follow up meeting at the end of the month. If there are any updates to be made to the track it won’t happen until next year. c. Field House Addition i. Meeting scheduled for 5/8 to discuss with President, Exec Team and coaches d. Graichen Gym and Field House Floors i. Have been added to deferred maintenance list ii. Athletics is looking to use the puzzle-type flooring. Doug has discussed with Jack that we (FS) do not have the time or people to take it up and put it back more than once per season. 4. Events (Kelli) a. Earth Day festival is tonight. Will be moved into Rhoades due to weather. b. Will work with Pat for set up days/ times for graduation. 5. Safety | Security Crew (Jessica) a. Working on developing a Blood-borne Pathogen Exposure Plan and a Mass Casualty procedure. b. Security Training i. Will contact consulting company to schedule the training. 6. FAMIS (Jessica) a. Q & A yesterday 7. Building Services Crew (Rick) a. No update 8. Maintenance Crew (Ray) a. Ray will have the number of showers in Kolstoe on Friday. 9. Power House Crew (Fred) a. All the water heaters are switched over. Air units are on. Student Center is switched over as well. They will begin to start draining boilers to get prepared for spring maintenance. 10. Other a. Circle Hall i. Drawing of Proposal sent to Campus Beautification Committee. That group is hoping to meet within the next week or so. The project will not be completed before graduation. b. Comm. Arts- 4th floor McFarland c. d. e. f. g. h. i. i. The meeting was rescheduled to 5/8. Department Openings i. Building Services- Rhoades (Rick) 1. Closes today. The committee will meet today to go over the scoring sheets. ii. Power House position (Fred/Ron) 1. Fred got 4 applicants he received yesterday. The committee will meet soon to go over them. Ron will be working with Kevin T to get a gator ordered soon. Courtney Pedersen received Student Employee of the Month for May! Stop in the office and congratulate her. Student Employees for the summer- Jessica has gotten as many as she could from Career Services but we are still looking to fill one more. Wayne received our first Anchor Award- congratulate him when you see him next. We also need 2 more volunteers to be on the committee next month. Please email Kelli if you are willing to volunteer for it. Department meeting will be next week. We will take an updated group photo so EVERYONE should be there. Thank you to Jessica for the updating on the flood wall project. The maps are appreciated.