UNDER CONSTRUCTION
Dear Resident:
brentwood place
STORM DRAINAGE IMPROVEMENT PROJECT
January 2014
Construction is underway for Brentwood Place Phase 2 Storm Drainage
Improvement Project. Work commenced at the downstream end of the project
in Revolution Park with the installation of a concrete box culvert along the east
side of the synthetic turf field and a concrete pipe along the west side of the
same field. Work has continued to progress into the Barringer Drive right-of-way.
Subsequent to the installation of storm drainage facilities within the park, the
contractor will reseed disturbed areas and repave the parking lot, as culvert and
pipe installation continues across Barringer Drive.
Partial and full road closures will be utilized to facilitate the construction of the
storm drainage facilities from Revolution Park to the north side of Barringer
Drive. Temporary construction traffic signage will be utilized to direct motorists
around the construction work zones. Detour signage will be provided during
full road closures and local access to homes will be available. There will be no
vehicular and pedestrian access across the culvert. Please plan on taking other
neighborhood streets for alternative access.
Construction start date for Phase I is yet to be determined.
For more information about this project, please visit our website to view project
updates at: http://stormwater.charmeck.org. Click on Storm Water Projects drop
down menu in the green bar, then Active Projects and Brentwood Place.
Workers install a concrete junction box in
Revolution Park.
If you have any questions, please contact one of the project team members:
Project Manager:
On-site Construction Inspector:
Tom Purvis: 704-336-3660
Monty Bissette: 704-400-7788
Email: tpurvis@charlottenc.gov
Email: mbissette@charlottenc.gov
Construction Supervisor:
Gary Stansbury: 704-336-2667
E-mail: gstansbury@charlottenc.gov
A construction inspector will be on site daily to address any questions or concerns. Please
note efforts are taken to minimize disruption.
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
Brentwood Place Project Update