UNDER CONSTRUCTION Dear Resident: brentwood place STORM DRAINAGE IMPROVEMENT PROJECT September 2014 Construction continues for Brentwood Place Phase I Storm Drainage Improvement Project. Due to unforeseen field conditions within the railroad rightof-way, the focus has been on installing improvements up to and across Remount Road. These improvements have been completed. Remount Road has been restored and is currently open to traffic. The project team continues to work with Norfolk Southern Railroad to determine the best solution for installation of the two drainage pipes beneath the railroad. Once a solution has been determined, work will commence within the railroad right-of-way. Construction continues for Phase II. Storm water improvements have been installed from Barringer Drive up to West Boulevard. Culvert installation will continue across West Boulevard. In addition, improvements have been completed near the intersection of West Boulevard/Remount Road, and sanitary sewer installation continues between Fordham Road and Bethel Road. Additionally, water line improvements are scheduled to commence along Camp Greene Street, just north of Wilkinson Boulevard. Partial and full road closures will be required for the installation of storm drainage improvements along West Boulevard and Camp Greene Street. Temporary construction traffic signage will direct motorists around the construction work zones. Detour signage will be provided during full road closures. For more information about this project, please visit our website to view project updates at: stormwater.charmeck.org. Click on Storm Water Projects drop down menu in the green bar, then Active Projects and Brentwood Place. Contractor installs 72-inch reinforced concrete pipe along Remount Road. If you have any questions, please contact one of the project team members: On-site Construction Inspector: Project Manager: Monty Bissette: 704-400-7788 Tom Purvis: 704-336-3660 Email: mbissette@charlottenc.gov Email: tpurvis@charlottenc.gov Construction Supervisor: Gary Stansbury: 704-336-2667 E-mail: gstansbury@charlottenc.gov A construction inspector will be on site daily to address any questions or concerns. Please note efforts are taken to minimize disruptions. Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202 Brentwood Place Project Update HIGHLIGHTS