93 AGENDA ITEM BACKGROUND TO: GOVERNING BOARD DATE December 5, 2011 FROM: PRESIDENT SUBJECT: Facilities Master Plan Project Status REASON FOR BOARD CONSIDERATION INFORMATION ITEM NUMBER ENCLOSURE(S) Page 1 of 4 D.3 BACKGROUND: DRAFT Major Projects under Construction (see next page) Administrator Initiating Item: Joe Nugent Victoria Lewis Academic and Professional Matter If yes, Faculty Senate Agreement Senate President Signature Yes No Yes No Final Disposition 94 PROGRESS REPORT Note: Measure D funded projects are outline in the following schedules There are references to other funding sources when the project has funding sources in addition to Measure D. E A B C D F [a+b] [d+e] Funding Project Health and Wellness Center and Sitework Allied Health Equipment Fall 2010 Building 300 Renovation Building 300 Renovation Equipment Watsonville Green Technology Center Total Measure D Funded Projects in Progress Planned Completio n Date Source Approved Original Project Budget Paid to Date Change Orders Revised Budget 10/31/2010 Encumbered Total Committed Balance to be paid Contracts Project Total & C.O. Cost G [c-f] Amount Remaining Total Cost vs Revised Budget Spring State Capital Outlay Funds Measure C Measure D Project Sub-total State Capital Outlay Funds Measure D 2012 Project Sub-total 2,290,493 0 2,290,493 1,835,555 68,076 1,903,631 386,862 Total Project State Capital Outlay Funds Measure C Measure D Project Sub-total State Capital Outlay Funds Measure D Project Sub-total Total Project EDA Funds Foundation Measure D Project Total 27,969,368 1,078,021 27,969,368 27,374,084 181,436 27,555,520 413,848 1,051,000 0 1,051,000 1,047,739 0 1,047,739 3,261 33 1,166,000 2,217,033 0 131,186 131,186 33 1,166,000 2,217,033 33 1,113,710 2,161,483 0 25,923 25,923 33 1,139,633 2,187,406 0 26,367 29,628 931,000 0 931,000 302,563 40,469 343,032 587,968 931,000 1,862,000 4,079,033 3,365,000 100,000 7,500,000 10,965,000 0 0 131,186 0 0 -163,670 -163,670 931,000 1,862,000 4,079,033 3,365,000 100,000 7,500,000 10,965,000 312,270 614,833 2,776,316 2,572,131 0 6,075,915 8,648,046 24,893 65,362 91,285 792,869 0 839,216 1,632,085 337,163 680,195 2,867,601 3,365,000 0 6,915,131 10,280,131 593,837 1,181,805 1,211,433 0 100,000 584,869 684,869 25,769,627 1,045,537 25,769,627 23,493,571 1,018,500 24,512,071 1,257,556 Fall 2011 Fall 2010 Spring 2012 Spring 2012 Totals are for Measure D Only 10,490,000 0 10,490,000 10,490,000 0 10,490,000 0 121,741 15,067,134 25,678,875 0 1,078,021 1,078,021 121,741 15,067,134 25,678,875 121,741 14,926,788 25,538,529 0 113,360 113,360 121,741 15,040,148 25,651,889 0 26,986 26,986 1,185,000 0 1,185,000 770,667 52,968 823,635 361,365 1,105,493 0 1,105,493 1,064,888 15,108 1,079,996 25,497 95 Major Projects under Construction Arts Education Classrooms Project This project is in the final closeout process with DSA. One change order remains to be approved by DSA. Staff will submit the complete closeout package to DSA for final certification upon receipt of final change order. Current Status Update: Awaiting on final change order approval to submit for final certification from DSA. Health and Wellness Project The Allied Health project consists of two buildings totaling 57,000 square feet, and is the new home for programs such as Nursing, Radiology Technology, Medical Assisting, Dental Hygiene, Health and Wellness, and the Stroke Center. RMW is the architect and Soltek Pacific is the contractor. Construction began in May 2008 and the buildings are 100% complete. Staff is in the process of closing out the project. All remaining issues have been resolved with the contractor. Current Status Update: The majority of the equipment for the building has been purchased and installed. There are additional items to be purchased. Construction of an ADA ramp and sidewalk from parking lot J to the center of the two buildings is complete. The two ADA accessible parking spaces and adjoining ramp are complete. The installation of carpet in rooms H.W. 2212 and H.W. 2214 are expected to accomplish final acoustical corrections. The project is being closed out and unused funding is reverting back to the bond fund. Building 300 Renovation On February 1, 2010 the Governing Board approved an award of bid to Tombleson Construction of Salinas in the amount of $1,560,136 to renovate the 300 building. 12,523 square feet was remodeled and reconstructed to provide ten general purpose classrooms, two large assembly/classrooms and nine BELA division offices in spring 2010. The renovation is substantially complete. Current Status Update: The building has been occupied beginning spring semester 2011. The project is being closed out and unused funding is reverting back to the bond fund. DSA is currently processing requests for project closeout they received in the month of February 2011. The District is awaiting final closeout and certification from DSA. Some of the equipment has been purchased and installed. Watsonville Green Technology Center The District and the City of Watsonville closed escrow on the purchase of the Watsonville Library on July 15, 2008. Since then, the college has demolished the building in order to construct a 14,000 square foot Community Education Center. The District received a grant for $2.5 million from Economic Development Agency for the project, and the grant was augmented by $865,000 to help fund an upgrade to a Platinum Level LEED certified “green” building. The Division of State Architect (DSA) approved the plans in June of 2010 and EDA approved the plans and specifications in July 2010. The project went to bid in August 2010. In October, the Board approved Dilbeck and Sons as well as an augmentation to 96 the budget of $517,000. A deductive change order for the value engineering items discussed at the October Board meeting was approved at the November Board Meeting. The District has received a generous donation from the Ley Family of $100,000 for construction to add back some of the items that were placed on hold. Current Status Update: The project continues to progress. Building A (the main classroom building) exterior is complete. Roofing is complete, windows are installed and stucco is complete. Interior space has all sheetrock installed, tape, mud and texture and is in the process of being painted. Building “B” (shop building) exterior is nearly complete. Roofing is complete, windows are installed and metal siding is nearly complete. PG&E has made all connections including new 21KV service. Final site improvements are taking place. Awards of Informal Bids under the Uniform Construction Cost Accounting System (UCC): At the August 2011 Governing Board meeting, the Uniform Public Construction Cost Accounting System was adopted to enable the District to increase the formal bid limits from $125,000 to $175,000. By adopting the Uniform Public Construction Cost Accounting System, the Board authorized the President or his/her designee to enter into agreements with low bidders using the informal bidding process with the provision that the successful awards would be presented to the Board as an information item. This system enables the District to 1) informally bid projects under $125,000 to prequalified contractors, 2) more efficiently and effectively manage small to medium sized projects, and 3) contract with local contractors who are deemed “qualified” bidders. Award of Bid: Building 1100 HVAC Upgrade Project There was a non-bond related bid awarded in October in the amount of $156,980 to Della Mora of Salinas. This project completes the HVAC upgrades to this building. This project is scheduled to start in early November and is scheduled to be completed by late February 2012.