Air Force Operation and Maintenance, Active Forces Budget Activity: Training and Recruiting Activity Group: Basic Skills and Advanced Training Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization I. Description of Operations Financed: Facilities Sustainment, Restoration, and Modernization (FSRM) functions include sustainment, demolition, and restoration and modernization accomplished by contract and by an in-house workforce. This Subactivity group supports Air Education and Training Command’s (AETC) main operating bases. Objectives are to sustain mission capability, quality of life, and workforce productivity and to preserve AETC's physical plant. Overall adjustments to military manpower in this subactivity reflect an ongoing transition to an Expeditionary Air Force (EAF) structure, as well as a shift in support personnel positions into primary mission areas to more accurately depict the balance between “tooth” and “tail” of the Air Force. AETC's infrastructure support encompasses a variety of systems, services, and operations The most significant categories receiving this support are sustainment and restoration and modernization of: Real Property Aircraft Maintenance Complexes Aircraft Runways Roads Dormitories II. Force Structure Summary: Supports Facilities Sustainment, Restoration, and Modernization at 13 bases. 447 Air Force Operation and Maintenance, Active Forces Budget Activity: Training and Recruiting Activity Group: Basic Skills and Advanced Training Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization III. Financial Summary ($s in Thousands): FY 2001 A. Program Elements: Facility Sustainment Restoration and Modernization Demolition Total FY 2000 Actuals Budget Request Appn Current Estimate FY 2002 Estimate $109,795 4,970 2,116 $116,881 $117,863 3,409 5,845 $127,117 $118,765 3,388 5,653 $127,806 $128,290 4,006 6,757 $139,053 $129,385 10,287 8,991 $148,663 B. Reconciliation Summary: Change FY 01/01 Change FY 01/02 Baseline Funding Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) Subtotal Appropriated Amount Rescission Program Changes (CY to CY only) Subtotal Baseline Funding Reprogrammings Price Changes Functional Transfers Program Changes Current Estimate $127,117 0 0 2,800 -2,111 $127,806 -$472 -881 $126,453 12,600 0 0 0 $139,053 $139,053 448 3,158 342 6,110 $148,663 Air Force Operation and Maintenance, Active Forces Budget Activity: Training and Recruiting Activity Group: Basic Skills and Advanced Training Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization C. Reconciliation of Increases and Decreases ($s in Thousands): FY 2001 President's Budget Request ....................................................................................................................... $127,117 1. Congressional Adjustments ................................................................................................................................... $689 a) Distributed Adjustments ....................................................................................................... $0 b) Undistributed Adjustments ................................................................................................... $0 c) Adjustments to meet Congressional Intent ........................................................................... $2,800 i) Keesler AFB, Weatherproofing (Transfer from Subactivity Group Air Operations) .... $2,800 d) General Provisions ................................................................................................................ $-2,111 i) Consulting and Advisory Services (Sec 8163, P.L. 106-259, FY 2001 Appn Act) ....... $-170 ii) Headquarters and Administrative Activities (Sec 8165, P.L. 106-259, FY 2001 Appn Act) $-341 iii) DWCF Rate Stabilization (Sec 8085, P.L. 106-259, FY 2001 Appn Act ) .................... $-1,600 FY 2001 Appropriated Amount (subtotal) .............................................................................................................. $127,806 Government-Wide Rescission (Section 1403, P.L. 105-554) ............................................................................... $-472 2. Program Increases and Decreases ......................................................................................................................... $-881 449 Air Force Operation and Maintenance, Active Forces Budget Activity: Training and Recruiting Activity Group: Basic Skills and Advanced Training Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization a) Transfers ............................................................................................................................... $0 b) Program Increases ................................................................................................................. $0 c) Program Decreases ............................................................................................................... $-881 i) Program Reductions ........................................................................................................ 1) Civilian Pay Adjustment ................................................................................... The increase represents revised civilian pay funding requirements based on updated assessment of actual workyear costs to reflect the impact of changes such as FY 2000 locality pay. $-881 $-881 FY 2001 Baseline Funding (subtotal) ....................................................................................................................... $126,453 3. Reprogrammings ................................................................................................................................................... $12,600 a) WCF Transfer (Sec 8005, P.L. 106-259, FY 2001 Appn Act) ............................................. $1,600 b) Unobligated Carryover (P.L. 106-259, Title IX, FY 2001 DOD Appn Act) ........................ $11,000 Revised FY 2001 Estimate......................................................................................................................................... $139,053 4. Price Change ......................................................................................................................................................... $3,158 5. Transfers ................................................................................................................................................................ $342 a) Transfers In ........................................................................................................................... 450 $1,217 Air Force Operation and Maintenance, Active Forces Budget Activity: Training and Recruiting Activity Group: Basic Skills and Advanced Training Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization i) Competition and Privatization Realignment (AETC Realign Drayage) ......................... Funding for a previous A-76 contract award was incorrectly added to Base Operating Support. This adjustment correctly aligns funding to take care of Laughlin AFB’s operations contract. $1,217 b) Transfers Out ........................................................................................................................ $-875 i) Dorm Furnishings ............................................................................................................ Realigns funding from Facilities Sustainment, Restoration, and Modernization Subactivity Group to Base Support Subactivity Group for initial issue dormitory furnishings and scheduled replacement dormitory furnishings. Enhances airmen’s morale and quality of life to move into a new dorm with new furnishing. $-512 ii) Fire Protection Fleet ........................................................................................................ Realigns funding, within Real Property Activity Groups, to centrally advocate for replacement of fire protection vehicles. Modernization of the fleet ensures support to mission flight and contingency operations, and ensures compliance with National Fire Protection Association (NEPA) 402, Aircraft Rescue and Firefighting Operations $-363 6. Program Increases ................................................................................................................................................. $26,443 a) Onetime FY 2002 Costs.......................................................................................................... i) Rescission Restoration .................................................................................................... Restoral of FY01 Government-Wide Rescission b) Program Growth in FY 2002 ................................................................................................ 451 $472 $472 $25,971 Air Force Operation and Maintenance, Active Forces Budget Activity: Training and Recruiting Activity Group: Basic Skills and Advanced Training Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization i) Competition and Privatization Savings ........................................................................... This increase results from a change in approach to competitive sourcing and the cancellation of A-76 studies for programs such as Precision Measurement Equipment Laboratory (PMEL) and Corrosion Control. $15,684 ii) Enlisted Accessions ......................................................................................................... This funding increase supports AETC’s dorm refurbishing requirements to house an additional Basic Military Training (BMT) Squadron in order to meet Air Force Enlisted Accession goals. $10,287 7. Program Decreases ................................................................................................................................................ $-20,333 a) Onetime FY 2002 Costs.......................................................................................................... $0 b) Program Decreases in FY 2002 ............................................................................................ $-20,333 i) Civilian Pay Adjustment .................................................................................................. This represents revised civilian pay funding requirements due to newly approved special salary rates for critical skills (Air Traffic Controller (ATC) Premium Pay and Information Technology (IT) Special Salary Rates) and annualized FY01 increases in Federal Employee Health Benefits (FEHB) rates. These increases are offset by a reduction in the programmed civilian pay raise percentage and expected salary savings due to workforce restructuring. $-7,010 ii) AF Offsets ....................................................................................................................... The Air Force must meet readiness and mission requirements and was forced to use FSRM funding to meet these higher needs. FSRM funding is below the sustainment level. $-6,955 452 Air Force Operation and Maintenance, Active Forces Budget Activity: Training and Recruiting Activity Group: Basic Skills and Advanced Training Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization iii) Civilian Separation Incentives ......................................................................................... Civilian separation incentives are authorized by Section 4436 of P.L. 102-484. These costs reflect the incremental funds required in FY 2002 over and above salary savings to implement endstrength reductions programmed due to A-76 and workforce restructuring actions. DoD activities may pay up to $25,000 for separation incentives plus 15% of basic pay to OPM. The current policy is to offer incentives before a person is involuntarily separated. $-6,368 FY 2002 Budget Request ........................................................................................................................................... $148,663 IV. Performance Criteria and Evaluation Summary: A. Administration and Support Planning and Design Funds ($000) ......................................... Military E/S ............................................................................. Civilian E/S ............................................................................. Total E/S.............................................................................. FY 2000 FY 2001 FY 2002 FY 2003 $3,579 358 1,007 1,365 $4,056 264 861 1,125 $4,528 8 673 681 $3,923 0 616 616 453 Air Force Operation and Maintenance, Active Forces Budget Activity: Training and Recruiting Activity Group: Basic Skills and Advanced Training Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization V. Personnel Summary Active Military End Strength (Total) Officer Enlisted Civilian End Strength (Total) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire Active Military Average Strength (Total) Officer Enlisted Civilian FTEs (Total) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire FY 2000 FY 2001 FY 2002 Change FY 01/02 358 16 342 264 13 251 8 3 5 -256 -10 -246 1,007 1,007 0 1,007 0 861 861 0 861 0 673 673 0 673 0 -188 -188 0 -188 0 433 19 414 312 15 297 136 8 128 -176 -7 -169 1,212 1,212 0 1,212 0 922 922 0 922 0 766 766 0 766 0 -156 -156 0 -156 0 454 Air Force Operation and Maintenance, Active Forces Budget Activity: Training and Recruiting Activity Group: Basic Skills and Advanced Training Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization VII. OP-32 Line Items: FOREIGN 101 103 107 308 401 411 412 415 417 502 505 506 771 915 920 921 922 923 924 925 989 998 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION EXECUTIVE GENERAL SCHEDULE WAGE BOARD SEPARATION INCENTIVES TRAVEL OF PERSONS DFSC FUEL ARMY MANAGED SUPPLIES/MATERIALS NAVY MANAGED SUPPLIES/MATERIALS DLA MANAGED SUPPLIES/MATERIALS LOCAL PROC DWCF MANAGED SUPL MAT ARMY DWCF EQUIPMENT AIR FORCE DWCF EQUIPMENT DLA DWCF EQUIPMENT COMMERCIAL TRANSPORTATION RENTS (NON-GSA) SUPPLIES & MATERIALS (NON-DWCF) PRINTING & REPRODUCTION EQUIPMENT MAINTENANCE BY CONTRACT FACILITY MAINTENANCE BY CONTRACT MEDICAL SUPPLIES EQUIPMENT (NON-DWCF) OTHER CONTRACTS OTHER COSTS TOTAL FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION FY 2000 CURRENCY ACTUAL 41,211 5,869 0 503 276 4 1 64 64 0 -6 -6 3 795 15,313 11 101 42,442 5 852 9,418 -39 RATE DIFF 116,881 FOREIGN PRICE PROGRAM FY 2001 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 GROWTH 1,822 277 0 8 173 0 0 3 1 0 0 0 0 13 244 0 2 678 0 14 151 -1 GROWTH -8,995 -2,751 12,001 -47 146 9 3 140 150 1 24 24 7 -468 -7,520 -11 389 17 -4 -139 7,241 18,570 ESTIMATE 34,038 3,395 12,001 464 595 13 4 207 215 1 18 18 10 340 8,037 0 492 43,137 1 727 16,810 18,530 0 3,385 18,787 139,053 455 CURRENCY PRICE RATE DIFF. PROGRAM FY 2002 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 GROWTH 1,505 146 0 8 -6 0 0 1 4 0 2 0 0 6 136 0 8 734 0 13 286 315 GROWTH -9,233 2,223 -6,368 -93 -150 -8 -2 -129 -138 -1 -20 -18 31 -43 -1,281 0 -306 5,578 2 -308 1,294 15,422 ESTIMATE 26,310 5,764 5,633 379 439 5 2 79 81 0 0 0 41 303 6,892 0 194 49,449 3 432 18,390 34,267 0 3,158 6,452 148,663