Air Force Operation and Maintenance, Active Forces Budget Activity: Operating Forces Activity Group: Space Operations Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization I. Description of Operations Financed: Facilities Sustainment, Restoration, and Modernization (FSRM) functions include demolition, sustainment, and restoration and modernization accomplished by contract and by an in-house workforce. This Subactivity group supports and maintains our primary space systems launch, tracking, and recovery complexes, Air Force Space Command (AFSPC) Headquarters at Peterson AFB, Colorado, the Cheyenne Mountain complex and other space tracking and support operations worldwide. Our objectives are to sustain mission capability, quality of life, and workforce productivity and to preserve our physical plant. Overall adjustments to military manpower in this Subactivity reflect an ongoing transition to an Expeditionary Air Force (EAF) structure, as well as a shift in support personnel positions into primary mission areas to more accurately depict the balance between “tooth” and “tail” of the Air Force. Infrastructure support encompasses a variety of systems, services, and operations. The most significant categories receiving this support are sustainment and restoration and modernization of: Real Property Aircraft Maintenance Complexes Aircraft Runways Roads Dormitories II. Force Structure Summary: Supports Facilities Sustainment, Restoration, and Modernization at 6 bases. 261 Air Force Operation and Maintenance, Active Forces Budget Activity: Operating Forces Activity Group: Space Operations Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization III. Financial Summary ($s in Thousands): FY 2001 A. Program Elements: Facility Sustainment Restoration and Modernization Demolition Total FY 2000 Actuals Budget Request Appn Current Estimate FY 2002 Estimate $122,407 9,844 1,091 $133,342 $125,203 7,570 1,503 $134,276 $122,901 7,449 1,449 $131,799 $124,292 7,359 1,435 $133,086 $129,039 250 2,354 $131,643 B. Reconciliation Summary: Change FY 01/01 Change FY 01/02 Baseline Funding Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) Subtotal Appropriated Amount Rescission Program Changes (CY to CY only) Subtotal Baseline Funding Reprogrammings Price Changes Functional Transfers Program Changes Current Estimate $134,276 0 0 0 -2,477 $131,799 -$557 0 $131,242 1,844 0 0 0 $133,086 $133,086 262 3,128 -908 -3,663 $131,643 Air Force Operation and Maintenance, Active Forces Budget Activity: Operating Forces Activity Group: Space Operations Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization C. Reconciliation of Increases and Decreases ($s in Thousands): FY 2001 President's Budget Request ....................................................................................................................... $134,276 1. Congressional Adjustments ................................................................................................................................... $-2,477 a) Distributed Adjustments ....................................................................................................... $0 b) Undistributed Adjustments ................................................................................................... $0 c) Adjustments to meet Congressional Intent ........................................................................... $0 d) General Provisions ................................................................................................................ $-2,477 i) DWCF Rate Stabilization (Sec 8085, P.L. 106-259, FY 2001 Appn Act ) .................... $-1,841 ii) Headquarters and Administrative Activities (Sec 8165, P.L. 106-259, FY 2001 Appn Act) $-456 iii) Consulting and Advisory Services (Sec 8163, P.L. 106-259, FY 2001 Appn Act) ....... $-180 FY 2001 Appropriated Amount (subtotal) .............................................................................................................. $131,799 Government-Wide Rescission (Section 1403, P.L. 105-554) ............................................................................... -$557 FY 2001 Baseline Funding (subtotal) ....................................................................................................................... $131,242 2. Reprogrammings .................................................................................................................................................. $1,844 a) WCF Transfer (Sec 8005, P.L. 106-259, FY 2001 Appn Act) ............................................. $1,841 b) FCFA Transfer (Sec 8006, P.L. 106-259, FY 2001 Appn Act) ............................................ $3 263 Air Force Operation and Maintenance, Active Forces Budget Activity: Operating Forces Activity Group: Space Operations Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization Revised FY 2001 Estimate......................................................................................................................................... $133,086 3. Price Change ......................................................................................................................................................... $3,128 4. Transfers ................................................................................................................................................................ $-908 a) Transfers Out ........................................................................................................................ $-908 i) Dorm Furnishings ............................................................................................................ Realigns funding from Facilities Sustainment, Restoration, and Modernization Subactivity Group to Base Support Subactivity Group for initial issue dormitory furnishings and scheduled replacement dormitory furnishings. Enhances airmen’s morale and quality of life to move into a new dorm with new furnishing. $-531 ii) Fire Protection Fleet ........................................................................................................ Realigns funding from Facilities Sustainment, Restoration, and Modernization Subactivity Group to Base Support Subactivity Group to centrally advocate for replacement of fire protection vehicles. Modernization of the fleet ensures support to mission flight and contingency operations, and ensures compliance with National Fire Protection Association (NEPA) 402, Aircraft Rescue and Firefighting Operations. $-377 5. Program Increases ................................................................................................................................................. $10,927 a) Onetime FY 2002 Costs ........................................................................................................ i) Rescission Restoration .................................................................................................... Restoral of FY01 Government-Wide Rescission b) Program Growth in FY 2002 ................................................................................................ 264 $557 $557 $10,370 Air Force Operation and Maintenance, Active Forces Budget Activity: Operating Forces Activity Group: Space Operations Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization i) FSRM Buybacks .............................................................................................................. Funding realigned, within FSRM Activity Groups, to accomplish near term infrastructure requirements and preclude further degradation, which would lead to more expensive repairs at a future time. $8,543 ii) Civilian Pay and Benefits Adjustment ............................................................................ This represents revised civilian pay funding requirements due to newly approved special salary rates for critical skills (Air Traffic Controller (ATC) Premium Pay and Information Technology (IT) Special Salary Rates) and annualized FY01 increases in Federal Employee Health Benefits (FEHB) rates. These increases are offset by a reduction in the programmed civilian pay raise percentage and expected salary savings due to workforce restructuring. $1,827 6. Program Decreases ................................................................................................................................................ a) Program Decreases in FY 2002 ............................................................................................ $-14,590 i) AF Offsets ....................................................................................................................... The Air Force must meet readiness and mission requirements and was forced to use FSRM funding to meet these higher priority needs. FSRM funding is below the sustainment level. $-9,735 ii) Facility Sustainment ....................................................................................................... This decrease realigns funding, within the Facilities Sustainment, Restoration, and Modernization Activities Groups, to the sustainment level, which will allow only necessary day-to-day recurring maintenance of real property facilities and infrastructure. Current funding only supports emergency and critical repair work. The impact of deferred maintenance is reduced productivity in maintenance shops, along the flight line and in office areas. $-4,855 265 $-14,590 Air Force Operation and Maintenance, Active Forces Budget Activity: Operating Forces Activity Group: Space Operations Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization FY 2002 Budget Request .................................................................................................... $131,643 IV. Performance Criteria and Evaluation Summary: A. Administration and Support Planning and Design Funds ($000) ......................................... Military E/S ............................................................................. Civilian E/S ............................................................................. Total E/S.............................................................................. 266 FY 2000 FY 2001 FY 2002 $2,468 259 469 728 $2,321 161 555 716 $1,893 176 556 732 Air Force Operation and Maintenance, Active Forces Budget Activity: Operating Forces Activity Group: Space Operations Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization FY 2000 FY 2001 FY 2002 Change FY 01/02 Active Military End Strength (Total) Officer Enlisted 259 19 240 161 16 145 176 25 151 15 9 6 Civilian End Strength (Total) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 469 469 0 469 0 555 555 0 555 0 556 556 0 556 0 1 1 0 1 0 Active Military Average Strength (Total) Officer Enlisted 387 25 362 211 18 193 169 21 148 -42 3 -45 Civilian FTEs (Total) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 377 377 0 377 0 530 530 0 530 0 556 556 0 556 0 26 26 0 26 0 V. Personnel Summary 267 Air Force Operation and Maintenance, Active Forces Budget Activity: Operating Forces Activity Group: Space Operations Detail by Subactivity Group: Facilities Sustainment, Restoration, and Modernization VI. OP-32 Line Items: FOREIGN 101 103 107 308 401 411 412 415 417 502 503 505 506 771 913 915 920 922 923 924 925 937 989 998 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION EXECUTIVE GENERAL SCHEDULE WAGE BOARD SEPARATION INCENTIVES TRAVEL OF PERSONS DFSC FUEL ARMY MANAGED SUPPLIES/MATERIALS NAVY MANAGED SUPPLIES/MATERIALS DLA MANAGED SUPPLIES/MATERIALS LOCAL PROC DWCF MANAGED SUPL MAT ARMY DWCF EQUIPMENT NAVY DWCF EQUIPMENT AIR FORCE DWCF EQUIPMENT DLA DWCF EQUIPMENT COMMERCIAL TRANSPORTATION PURCHASED UTILITIES (NON-DWCF) RENTS (NON-GSA) SUPPLIES & MATERIALS (NON-DWCF) EQUIPMENT MAINTENANCE BY CONTRACT FACILITY MAINTENANCE BY CONTRACT MEDICAL SUPPLIES EQUIPMENT (NON-DWCF) LOCALLY PURCHASED FUEL (NON-SF) OTHER CONTRACTS OTHER COSTS TOTAL FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION FOREIGN FY 2000 CURRENCY ACTUAL 19,009 2,250 0 647 81 25 8 397 412 17 6 292 272 4 11 31 6,796 168 94,666 7 43 0 8,072 128 RATE DIFF 133,342 PRICE PROGRAM FY 2001 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -14 0 0 0 -3 0 0 -1 -7 0 GROWTH 839 106 0 10 51 -1 1 18 7 -1 1 19 12 0 0 1 109 2 1,514 0 1 0 128 2 GROWTH 11,101 256 150 -597 8 6 1 47 63 -14 -7 -289 -264 5 14 -2 -883 -152 -15,291 -5 -32 1 630 2,204 ESTIMATE 30,949 2,612 150 60 140 30 10 462 482 2 0 22 20 9 11 30 6,022 18 80,886 2 12 0 8,823 2,334 -25 2,819 -3,050 133,086 268 CURRENCY RATE DIFF. PRICE PROGRAM FY 2002 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -16 0 0 0 -4 0 0 -1 -7 0 GROWTH 1,368 113 0 1 -2 -1 0 2 8 0 0 2 0 0 0 0 102 0 1,374 0 0 0 150 39 GROWTH -2,541 4,368 278 163 -34 0 0 -13 -25 12 4 193 189 -9 9 36 -636 164 -8,369 0 25 -1 689 927 ESTIMATE 29,776 7,093 428 224 104 29 10 451 465 14 4 217 209 0 4 66 5,488 182 73,887 2 37 -2 9,655 3,300 -28 3,156 -4,571 131,643