Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Base Support I. Description of Operations Financed: This subactivity provides funding for base support functions, and engineering and environmental programs in support of the Air Mobility Command (AMC). The main objectives are to sustain mission capability, quality of life, workforce productivity and infrastructure support. Significant categories of support are listed below: Audiovisual Information Activities: Funds audiovisual support for video production, graphic art, photo lab, visual information library equipment maintenance, presentation sections, video teleconferencing system, management and operation of audiovisual product distribution, armament delivery recording, still photo, motion picture, television and audio recordings, and electronic and graphics imaging. Base Communications: Supports base telephone systems, maintenance of intra-base radio systems, base wire communications, official toll calls, Class B toll calls, and other base government-owned commercial communication requirements; dedicated leased long lines that provide connectivity to Air Force and DoD networks; Global Decision Support Systems to support command and control of worldwide airlift/tanker mission requirements; standard base level computer equipment; and secure voice teleconferencing command and control systems. Base Operating Support: Program funds transportation, security forces, comptroller, staff judge advocate, claims, personnel organizations, dining facilities, lodging, contracting services, chaplain, administration, mess attendant and equipment maintenance contracts, postal services, data processing, airfield and air operations, furnishings management, and other authorized service activities. Child Development Centers (CDC) and Family Support Centers (FSC): CDCs support provisions of the Military Child Care Act to include Family Day Care (FDC). Full-day, part-day, and hourly care for children is provided by CDCs. The FDC program supervises individuals who reside in on-base housing and provide full-day care for children. FSCs support readiness and retention as the focal point for family matters and provide core services such as: consultation, family readiness, crisis assistance, Air Force Aid Society, personal financial management, spouse employment, volunteer resource, and relocation and transition assistance programs. Real Property Services: Provides essential installation facility support for purchased utilities, utility plant operations, grounds maintenance, fire protection, crash rescue, snow and ice removal, entomological services, elevator maintenance/inspection, and rents and leases. Contracted engineering services include custodial services, refuse collection, corrosion control, sewer and waste systems, facility engineering and public works management, other installation engineering services and annual service requirements performed in-house or by contract. 342 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Base Support Environmental Conservation/Compliance: Environmental Conservation provides for protection and enhancement of natural and cultural resources, environmental surveys, consultations with environmental regulators, and mapping and planning support systems. Environmental Compliance ensures all federal, state, and local environmental laws are enforced through sampling, analysis, and monitoring; hazardous waste characterization and disposal; underground storage tank removal/repair/replacement; leak detection and monitoring; spill response and clean-up; training; maintenance, repair, and minor construction projects for environmental facilities and infrastructure. Pollution Prevention: This program was established to prevent future pollution by reducing hazardous material use and releases of pollutants into the environment to as near zero as feasible to alleviate environmentally harmful discharges to the air, land, surface and ground water. II. Force Structure Summary: Supports sustainment of mission capability, quality of life, workforce productivity and infrastructure support on all Air Mobility Command installations. 343 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Base Support III. Financial Summary ($s in Thousands): FY 2001 FY 2000 Actuals A. Program Elements: Child Development Centers Family Support Centers Environmental Conservation Pollution Prevention Environmental Compliance Real Property Services Visual Information Activities Base Communications Base Operating Support Total $17,222 6,715 2,394 8,632 18,211 99,767 2,391 37,947 215,243 $408,522 Budget Request $19,934 7,479 2,183 7,399 20,786 108,520 1,638 42,607 256,286 $466,832 344 Appn $19,645 7,361 2,143 7,259 20,393 106,596 1,601 41,758 251,109 $457,865 Current Estimate $18,019 7,364 1,984 6,673 19,981 99,196 1,578 40,294 241,551 $436,640 FY 2002 Estimate $22,164 7,321 2,077 5,833 15,278 132,895 1,487 42,793 257,806 $487,654 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Base Support Change FY 01/01 Change FY 01/02 Baseline Funding $466,832 Congressional Adjustments (Distributed) 0 Congressional Adjustments (Undistributed) -1,000 Adjustments to Meet Congressional Intent 0 Congressional Adjustments (General Provisions) -7,967 Subtotal Appropriated Amount $457,865 Rescission -$1,661 Program Changes (CY to CY only) -25,486 Subtotal Baseline Funding $430,718 Reprogrammings 5,922 Price Changes Functional Transfers Program Changes Current Estimate $436,640 $436,640 B. Reconciliation Summary: 345 14,150 -2,720 39,584 $487,654 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Base Support C. Reconciliation of Increases and Decreases ($s in Thousands): FY 2001 President's Budget Request ....................................................................................................................... $466,832 1. Congressional Adjustments ................................................................................................................................... $-8,967 a) Distributed Adjustments ....................................................................................................... $0 b) Undistributed Adjustments ................................................................................................... $-1,000 i) Travel ............................................................................................................................... $-1,000 c) Adjustments to meet Congressional Intent ........................................................................... $0 d) General Provisions ................................................................................................................ $-7,967 i) Consulting and Advisory Services (Sec 8163, P.L. 106-259, FY 2001 Appn Act) ........ $-565 ii) Headquarters & Administrative Activities (Sec 8165, P.L. 106-259, FY 2001 Appn Act) $-1,480 iii) Defense Working Capital Fund (Sec 8085, P.L. 106-259, FY 2001 Appn Act) ............ $-5,922 FY 2001 Appropriated Amount (subtotal) .............................................................................................................. $457,865 Government Wide Rescission (Section 1403, P.L. 105-554) ............................................................................... $-1,661 2. Program Increases and Decreases ......................................................................................................................... $-25,486 a) Transfers ............................................................................................................................... $0 b) Program Increases ................................................................................................................. $0 346 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Base Support c) Program Decreases ............................................................................................................... i) One-time Costs ................................................................................................................ $-25,486 $-20,425 1) Realignment of funds ........................................................................................ $-20,425 The FY 2001 Flying Hour Program reprice, based on the CY 2000 AFCAIG consumption factors, resulted in an overall shortfall which Air Force cash flowed from other Air Force Operation and Maintenance programs. After careful consideration of the alternatives, funds were realigned from this Sub Activity Group. While we recognize the detrimental impact on this Sub Activity Group, this one-time realignment was necessary to ensure continued aircrew readiness and safety of flight, and will be restored in subsequent years. ii) Program Reductions ........................................................................................................ $-5,061 1) Civilian Pay Adjustment ................................................................................... $-5,061 The decrease represents revised civilian pay funding requirements based on updated assessment of actual workyear costs to reflect the impact of changes such as FY 2000 locality pay. FY 2001 Baseline Funding (subtotal) ....................................................................................................................... $430,718 3. Reprogrammings ................................................................................................................................................... $5,922 a) Working Capital Fund Transfer (Sec 8005, P.L. 106-754, FY 2001 Appn Act) ............ $5,922 Revised FY 2001 Estimate......................................................................................................................................... $436,640 4. Price Change ......................................................................................................................................................... $14,150 5. Transfers ................................................................................................................................................................ $-2,720 a) Transfers In ........................................................................................................................... 347 $9,462 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Base Support i) Dorm Furnishings ............................................................................................................ Funds realigned from Facilities Sustainment, Modernization and Renovation Subactivity Group to Base Support Subactivity Group for Real Property Services for purchases of dormitory furnishings. $751 ii) Contingency (Southwest Asia) Functional Transfer ....................................................... Operations in Southwest Asia (SWA), including Operation Northern Watch, Operation Southern Watch and Operation Desert Spring, have been ongoing for 10 years. With only a few notable exceptions, the force structure and operations tempo in SWA are fairly stable. Because these operations will continue into the foreseeable future, funding for SWA was transferred from the Overseas Contingency Operation Transfer Fund to the services' baseline effective FY02. Henceforth, services will plan, program and budget for these operations as they do for other baseline programs. The funding transfer resulted in a budget increase in all subactivity groups that support SWA. $8,113 iii) AETC realign CS&P Drayage ......................................................................................... Funds contract conversions where funding was realigned within this subactivity, between Base Operating Support and Real Property Service. The specific requirement is to fund the maintenance contract at Little Rock AFB. $598 b) Transfers Out ........................................................................................................................ i) Competition and Privatization ......................................................................................... This transfer results from a change in approach to competitive sourcing and the cancellation of A-76 studies for programs such as Precision Measurement Equipment Laboratory (PMEL) and Corrosion Control. Transfer to Military Personnel Appropriation. 348 $-12,182 $-12,182 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Base Support 6. Program Increases ................................................................................................................................................. $49,982 a) Annualization of New FY 2001 Program ............................................................................ $0 b) One-time FY 2002 Costs ..................................................................................................... $22,086 i) Restoration of Flying Hour Reprice Realignment ........................................................... When the FY 2001 Flying Hour Program was repriced using the CY2000 AFCAIG factors, the resultant shortfall was cash flowed from other Air Force Operation and Maintenance programs. Funds realigned from this Sub-Activity Group in FY 2001 have been restored in full for FY 2002. ii) Rescission Restoration ................................................................................................... Restoral of FY01 Government-Wide Rescission. $20,425 $1,661 c) Program Growth in FY 2002 ............................................................................................... $27,896 i) Utilities ............................................................................................................................ Funds assessment/studies to implement Defense Reform Initiative Directive (DRID) #49 for Privatizing Utility Systems, which mandated divestiture of non-military essential utility systems by 30 Sep 03. Increase reflects electric/natural gas costs, which increased by more than 42%. $18,823 ii) Child Development Centers............................................................................................. For upgrades and improvements to child development facilities and programs. Increase is due to upgrades required to meet Air Force and National Academy of Early childhood programs standards and comply with DoD directive to affiliated offbase homes for more military childcare slots. These funds support the opening of new facilities at various locations at Andrews AFB, MD and MacDill AFB, FL. $4,145 349 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Base Support iii) Base Communications ..................................................................................................... Leases for land mobile radios (LMR) trunking systems and handheld LMRs at several bases are to bring them into compliance with the National Telecommunication and Information Administration Act of 1992. Telephone maintenance contracts are being renegotiated with significant cost increases for basic service. Increase also supports new MILCON facilities and mission beddowns at various locations. $2,499 iv) Base Maintenance Contracts ........................................................................................... Funds higher costs of re-negotiated contracts. For example, vehicle maintenance, award fees, phase-in costs and repairs. $2,429 7. Program Decrease.................................................................................................................................................. $-10,398 a) One-time FY 2001 Costs ...................................................................................................... $0 b) Annualization of FY 2001 Program Decreases .................................................................... $0 c) Program Decreases in FY 2002 ............................................................................................ $-10,398 i) AMC Training ................................................................................................................. Funding decreased due to AMC’s commercial air terminal support now being funded by Transportation Working Capital Fund (TWCF). $-10,398 FY 2002 Budget Request ........................................................................................................................................... 350 $487,654 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Base Support IV. Performance Criteria and Evaluation Summary: FY 2000 FY 2001 FY 2002 6,136 2,069 5,606 1,971 5,746 2,067 1,190 264 1,206 263 1,181 158 53 11 53 11 53 11 806 820 709 716 708 810 18 98 25 89 23 108 2 9 2 6 2 7 1 7 1 7 1 7 0 340 0 414 0 425 28 92 28 91 28 92 A. Base Support Personnel ........................................................... Base Ops Support ............................................................. Military Personnel .......................................................... Civilian Personnel ........................................................... Communications .............................................................. Military Personnel .......................................................... Civilian Personnel ........................................................... Audio Visual ..................................................................... Military Personnel .......................................................... Civilian Personnel ........................................................... Real Property Services (RPS) .......................................... Military Personnel .......................................................... Civilian Personnel ........................................................... Environmental Compliance .............................................. Military Personnel .......................................................... Civilian Personnel ........................................................... Environmental Conservation ............................................ Military Personnel .......................................................... Civilian Personnel ........................................................... Pollution Prevention ......................................................... Military Personnel .......................................................... Civilian Personnel ........................................................... Child Development ........................................................... Military Personnel .......................................................... Civilian Personnel ........................................................... Family Support Centers ................................................... Military Personnel .......................................................... Civilian Personnel ........................................................... 351 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Base Support B. Bachelor Housing Ops./Furn ................................................... No. of Officer Quarters ..................................................... No. of Enlisted Quarters ................................................... 53 10,263 53 10,263 56 10,263 C. Other Morale, Welfare and Recreation ($000) ...................... 24,500 25,809 26,524 D. Number of Motor Vehicles, Total ........................................... (Owned) .......................................................................... (Leased) .......................................................................... 4,115 3,612 503 4,109 3,544 565 4,108 3,540 568 E. Payments to GSA Standard Level User Charges ($000) ................................ Leased Space (000 sq ft) ......................................................... Recurring Reimbursement ($000) .................................... One-time Reimbursements ($000) .................................... 0 0 0 0 0 0 0 0 0 0 0 0 F. Non-GSA Lease Payments Leased Space (000 sq ft) ................................................... Recurring Reimbursements ($000) ................................... One-time Reimbursements ($000) .................................... 1 16 0 1 16 0 1 16 0 G. Child and Youth Development Programs Number of Child Development Centers ........................... Number of Family Child Care (FCC) Homes ................... Total Number of Children Receiving Care ....................... Percent of Eligible Children Receiving Care.................... Number of Children on Waiting List ................................ Total Military Child Population (Infant to 12 years) ........ Number of Youth Facilities .............................................. Youth Population Served (Grades 1 to 12) ....................... 61 592 9,182 23 1,090 40,712 12 33,485 62 612 9,602 24 N/A 40,712 12 33,485 62 612 9,602 24 N/A 40,712 12 33,485 352 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Base Support FY 2000 FY 2001 FY 2002 Change FY 01/02 Active Military End Strength (Total) Officer Enlisted 8,244 626 7,618 7,630 644 6,986 7,739 614 7,125 109 -30 139 Civilian End Strength (Total) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 3,710 3,693 3,568 3,551 3,726 3,726 158 175 3,693 17 3,551 17 3,726 0 175 -17 10,653 763 9,890 7,941 636 7,305 7,689 631 7,058 -252 -5 -247 3,685 3,683 3,596 3,579 3,628 3,628 32 49 3,683 2 3,579 17 3,628 0 49 -17 V. Personnel Summary Active Military Average Strength (Total) Officer Enlisted Civilian FTEs (Total) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire 353 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Base Support VII. OP-32 Line Items: FOREIGN 101 103 107 110 111 308 401 411 412 414 415 417 502 503 505 506 671 673 703 707 771 901 912 913 914 915 917 920 921 922 923 924 925 930 932 933 934 937 989 998 BASE SUPPORT EXECUTIVE GENERAL SCHEDULE WAGE BOARD SEPARATION INCENTIVES UNEMPLOYMENT COMP DISABILITY COMP TRAVEL OF PERSONS DFSC FUEL ARMY MANAGED SUPPLIES/MATERIALS NAVY MANAGED SUPPLIES/MATERIALS AIR FORCE MANAGED SUPPLIES/MATERIALS DLA MANAGED SUPPLIES/MATERIALS LOCAL PROC DWCF MANAGED SUPL MAT ARMY DWCF EQUIPMENT NAVY DWCF EQUIPMENT AIR FORCE DWCF EQUIPMENT DLA DWCF EQUIPMENT COMMUNICATION SERVICES(DISA) TIER 2 DEFENSE FINANCING & ACCOUNTING SRVC AMC SAAM/JCS EX AMC TRAINING COMMERCIAL TRANSPORTATION FOREIGN NAT'L INDIRECT HIRE (FNIDH) RENTAL PAYMENTS TO GSA (SLUC) PURCHASED UTILITIES (NON-DWCF) PURCHASED COMMUNICATIONS (NON-DWCF) RENTS (NON-GSA) POSTAL SERVICES (U.S.P.S.) SUPPLIES & MATERIALS (NON-DWCF) PRINTING & REPRODUCTION EQUIPMENT MAINTENANCE BY CONTRACT FACILITY MAINTENANCE BY CONTRACT MEDICAL SUPPLIES EQUIPMENT (NON-DWCF) OTHER DEPOT MAINT (NON-DWCF) MANAGEMENT & PROFESSIONAL SUP SVS STUDIES, ANALYSIS, & EVALUATIONS ENGINEERING & TECHNICAL SERVICES LOCALLY PURCHASED FUEL (NON-SF) OTHER CONTRACTS OTHER COSTS TOTAL BASE SUPPORT FY 2000 CURRENCY ACTUAL 156,708 19,271 355 41 3,046 18,747 1,925 -337 -114 549 -5,295 -4,742 102 35 1,673 1,604 496 29,841 407 6,405 6,263 103 0 46,047 10,423 1,091 220 52,125 400 5,063 37,235 88 9,478 -122 4,042 3,268 3,143 7 68,046 -69,115 RATE DIFF 408,522 FOREIGN PRICE PROGRAM FY 2001 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 GROWTH 6,925 908 0 0 0 300 1,210 15 -17 34 -237 -77 -4 5 106 71 -2 1,462 56 717 100 4 0 737 168 16 0 833 7 80 597 3 152 -1 64 53 51 0 1,089 -1,106 GROWTH 6,594 -2,692 1,329 -41 52 -3,272 683 749 273 3,102 12,267 11,902 98 25 1,402 1,373 107 -30,618 2,054 11,943 2,170 454 0 -6,720 3,592 -81 1,012 -35,510 1,307 3,301 -12,315 -16 1,078 123 378 -17 178 -7 -3,150 40,692 ESTIMATE 170,227 17,487 1,684 0 3,098 15,775 3,818 427 142 3,685 6,735 7,083 196 65 3,181 3,048 601 685 2,517 19,065 8,533 561 0 40,064 14,183 1,026 1,232 17,448 1,714 8,444 25,517 75 10,708 0 4,484 3,304 3,372 0 65,985 -29,529 0 14,319 13,799 436,640 354 CURRENCY PRICE RATE DIFF. PROGRAM FY 2002 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 GROWTH 7,523 752 0 0 0 267 -38 -10 -7 391 27 121 -6 -2 336 10 82 -32 -95 1,830 145 20 0 680 240 19 0 296 29 145 436 3 180 0 75 57 57 0 1,123 -504 GROWTH -16,094 13,593 863 0 55 9,635 -272 15 8 1,950 79 -16 41 13 254 559 88 -52 76 -10,398 428 -581 152 18,024 -307 149 -26 4,870 385 211 238 0 2,834 0 225 -363 306 0 28,251 -18,329 ESTIMATE 161,656 31,832 2,547 0 3,153 25,677 3,508 432 143 6,026 6,841 7,188 231 76 3,771 3,617 771 601 2,498 10,497 9,106 0 152 58,768 14,116 1,194 1,206 22,614 2,128 8,800 26,191 78 13,722 0 4,784 2,998 3,735 0 95,359 -48,362 0 14,150 36,864 487,654