Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Mobilization Preparedness I. Description of Operations Financed: Funding in the Mobilization Preparedness subactivity group supports mobility operations with the capability to sustain contingency operations and war-time requirements through the provisioning and prepositioning of War Readiness Materials (WRM) and Medical Contingency Hospitals and Clinics; through the sustainment of Theater Nuclear Weapon Storage and Security Systems; and through the maintenance of Industrial Preparedness sites and Inactive Aircraft Storage and Disposal sites. II. Force Structure Summary: Mobilization Preparedness activities employ about 4,700 active duty personnel and about 280 civilians supporting 1) bare base requirements in 6 Major Commands, 2) 9 nuclear storage sites, 3) contingency hospitals in Europe, and 4) common use facilities at an aircraft modification plant in California. 308 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Mobilization Preparedness FY 2001 A. Program Elements: FY 2000 Actuals Budget Request Appn Current Estimate FY 2002 Estimate WRM - Ammunition WRM -Equipment/Secondary Items Medical Contingency Hospitals Theater Nuclear Weapon Storage/Security Industrial Preparedness Inactive Aircraft Storage and Disposal Total $21,078 112,722 3,047 1,281 12,923 5,052 $156,103 $26,013 93,281 6,054 763 13,732 6,290 $146,133 $25,112 $89,950 $5,671 $748 $13,440 $6,205 $141,126 $25,863 90,548 5,758 750 13,628 6,333 $142,880 $29,030 112,612 6,013 765 14,459 6,542 $169,421 B. Reconciliation Summary: Baseline Funding Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) Subtotal Appropriated Amount Rescission Program Changes (CY to CY only) Subtotal Baseline Funding Reprogrammings Price Changes Functional Transfers Program Changes Current Estimate Change FY 01/01 Change FY 01/02 $146,133 0 0 0 -5,007 $141,126 -504 0 $140,622 2,258 0 $142,880 $142,880 309 6,176 6,627 13,738 $169,421 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Mobilization Preparedness C. Reconciliation of Increases and Decreases ($s in Thousands): FY 2001 President's Budget Request ....................................................................................................................... $146,133 1. Congressional Adjustments ................................................................................................................................... $-5,007 a) Distributed Adjustments ....................................................................................................... $0 b) Undistributed Adjustments ................................................................................................... $0 c) Adjustments to meet Congressional Intent ........................................................................... $0 d) General Provisions ................................................................................................................ $-5,007 i) Defense Working Capital Fund Rate Stabilization (Sec 8085, P.L. 106-259, FY 2001 Appn Act) $-1,997 ii) Foreign Currency Fluctuation (Sec 8094, P.L. 106-259, FY 2001 Appn Act) ............... $-1,479 iii) Headquarters and Administration Support (Sec 8165, P.L. 106-259, FY 2001 Appn Act) $-897 iv) Consulting and Advisory Services (Sec 8163, P.L. 106-259, FY 2001 Appn Act) ........ $-634 FY 2001 Appropriated Amount (subtotal) .............................................................................................................. $141,126 Government-Wide Rescission (Sec 1403, Chapter 14, General Provisions, Division A, P.L. 106-544) .................... $-504 2. Program Increases and Decreases ......................................................................................................................... $0 a) Transfers ............................................................................................................................... i) Transfers In ...................................................................................................................... 310 $0 $0 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Mobilization Preparedness ii) Transfers Out ................................................................................................................... $0 b) Program Increases ................................................................................................................. $450 i) One-time Costs ................................................................................................................ $0 ii) Program Increases............................................................................................................ $450 a. Civilian Pay ....................................................................................................... The increase represents revised civilian pay funding requirements based on updated assessment of actual workyear costs to reflect the impact of changes such as FY 2000 locality pay. In addition, 22 civilian manpower positions were added driven by competitive sourcing and reengineering decisions. $450 c) Program Decreases ............................................................................................................... $-450 i) One-time Costs ................................................................................................................ a. Realignment of Funds ....................................................................................... The FY 2001 Flying Hour Program reprice, based on the CY 2000 AFCAIG consumption factors, resulted in an overall shortfall which Air Force cash flowed from other Air Force Operation and Maintenance programs. After careful consideration of the alternatives, funds were realigned from this Sub Activity Group. While we recognize the detrimental impact on this Sub Activity Group, this one-time realignment was necessary to ensure continued aircrew readiness and safety of flight, and will be restored in subsequent years. $-450 $-450 ii) Program Reductions ........................................................................................................ FY 2001 Baseline Funding (subtotal) ....................................................................................................................... 311 $0 $140,622 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Mobilization Preparedness 3. Reprogrammings: ....................................................................................................................... $2,258 a) Working Capital Fund Transfer (Sec 8005, P.L. 106-754, FY 2001 Appn Act) ........ $1,997 b) Foreign Currency Fluctuation Account Transfer ....................................................... $261 Revised FY 2001 Estimate ........................................................................................................................................ $142,880 4. Price Change ......................................................................................................................................................... $6,176 5. Transfers ................................................................................................................................................................ $6,627 a) Transfers In ........................................................................................................................... $6,791 i) Contingency Operations (FY 2001 Base $90,548) .......................................................... Operations in Southwest Asia (SWA), including Operation Northern Watch, Operation Southern Watch and Operation Desert Spring, have been ongoing for 10 years. With only a few notable exceptions, the force structure and operations tempo in SWA are fairly stable. Because these operations will continue into the foreseeable future, funding for SWA was transferred from the Overseas Contingency Operation Transfer Fund to the services' baseline effective FY02. Henceforth, services will plan, program and budget for these operations as they do for other baseline programs. The funding transfer resulted in a budget increase in all sub-activity groups that support SWA. $6,491 ii) Industrial Preparedness (FY 2001 Base $13,628) ........................................................... Transfer of supply, training, travel, and computer equipment to fund eight manpower positions previously moved from subactivity group Logistics Operations Base Support. $300 312 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Mobilization Preparedness b) Transfers Out ........................................................................................................................ i) Competition and Privatization (FY 2001 Base $116,411) .............................................. This transfer results from a change in approach to competitive sourcing and the cancellation of A-76 studies for programs such as Precision Measurement Equipment Laboratory (PMEL) and Corrosion Control $-164 $-164 6. Program Increases ................................................................................................................................................. $14,464 a) Annualization of New FY 2001 Program ............................................................................. $0 b) One-time FY 2002 Costs ...................................................................................................... $12,354 i) Transportation Adjustments (FY 2001 Base $146,133) ................................................. Funds were added to user accounts in FY02 to pay for a Military Sealift Command cash surcharge for prior year Maritime Administration services, and also to pay for a contractual judgment resulting from freight management charges after Desert Storm. $11,400 ii) Rescission Restoration (FY 2001 Base $146,133) ........................................................ Restoral of FY01 Government-Wide Rescission $504 iii) Restoration of Flying Hour Reprice Realignment (FY 2001 Base $146,133) ............... When the FY 2001 Flying Hour Program was repriced using the CY2000 AFCAIG factors, the resultant shortfall was cash flowed from other Air Force Operation and Maintenance programs. Funds realigned from this Sub-Activity Group in FY 2001 have been restored in full for FY 2002. $450 313 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Mobilization Preparedness c) Program Increases ................................................................................................................. i) War Readiness Materials Requirements (FY 2001 Base $119,294) .............................. Increase in funds for aging and surveillance testing of munitions to reduce risk of wartime failure. $2,110 $2,110 7. Program Decreases ................................................................................................................................................ $-726 a) One-time FY 2001 Costs ...................................................................................................... $0 b) Annualization of FY 2001 Program Decreases .................................................................... $0 c) Program Reductions .............................................................................................................. $-726 i) Civilian Pay (FY 2001 Base $8,964) .............................................................................. The decrease represents revised civilian pay funding requirements based on updated assessment of actual workyear costs to reflect the impact of changes such as FY 2000 locality pay. This is offset by an increase in revised civilian pay funding requirements based on updated assessment of actual workyear costs to reflect the impact of changes such as FY 2000 locality pay, and 261 compensable calendar workdays in FY 2002 versus 260 days in FY 2001. $-268 ii) Competition and Privatization (FY 2001 Base $2,487) ................................................. This decrease reflects estimated savings, which will be achieved by reducing costs through increased competition and expanded employee/private sector participation. These savings have been realigned to Air Force modernization accounts. $-458 FY 2002 Budget Request ........................................................................................................................................... 314 $169,421 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Mobilization Preparedness IV. Performance Criteria and Evaluation Summary: FY 2000 FY 2001 FY 2002 War Readiness Equipment Equipment value in millions of dollars ................................... Bare Base Sets ........................................................................ Afloat Prepositioned Ships ..................................................... 880 129 3 880 129 3 880 129 3 Wartime Consumables Value in millions of dollars .................................................... 3,013 3,013 3,013 Authorized Vehicles ..................................................................... 6,364 6,364 6,364 315 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Mobilization Preparedness V. Personnel Summary Active Military End Strength (Total) Officer Enlisted Civilian End Strength (Total) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire Active Military Average Strength (Total) Officer Enlisted Civilian FTEs (Total) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire FY 2000 FY 2001 FY 2002 Change FY 01/02 4,689 152 4,537 4,654 152 4,502 4,463 146 4,317 -191 -6 -185 282 189 40 229 53 282 189 40 229 53 255 162 40 202 53 -27 -27 0 -27 0 4,781 157 4,624 4,673 152 4,521 4,559 149 4,410 -114 -3 -111 254 171 38 209 45 285 192 40 232 53 275 182 40 222 53 -10 -10 0 -10 0 316 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Mobilization Preparedness VI. OP-32 Line Items: FOREIGN 101 103 104 107 308 401 411 412 414 415 417 502 503 505 506 671 703 707 708 715 719 771 901 913 914 915 920 921 922 923 924 925 930 932 933 934 937 989 998 MOBILIZATION PREPAREDNESS EXECUTIVE GENERAL SCHEDULE WAGE BOARD FOREIGN NATIONAL DIRECT HIRE (FNDH) SEPARATION INCENTIVES TRAVEL OF PERSONS DFSC FUEL ARMY MANAGED SUPPLIES/MATERIALS NAVY MANAGED SUPPLIES/MATERIALS AIR FORCE MANAGED SUPPLIES/MATERIALS DLA MANAGED SUPPLIES/MATERIALS LOCAL PROC DWCF MANAGED SUPL MAT ARMY DWCF EQUIPMENT NAVY DWCF EQUIPMENT AIR FORCE DWCF EQUIPMENT DLA DWCF EQUIPMENT COMMUNICATION SERVICES(DISA) TIER 2 AMC SAAM/JCS EX AMC TRAINING MSC CHARTED CARGO MSC APF MTMC CARGO OPERATIONS COMMERCIAL TRANSPORTATION FOREIGN NAT'L INDIRECT HIRE (FNIDH) PURCHASED UTILITIES (NON-DWCF) PURCHASED COMMUNICATIONS (NON-DWCF) RENTS (NON-GSA) SUPPLIES & MATERIALS (NON-DWCF) PRINTING & REPRODUCTION EQUIPMENT MAINTENANCE BY CONTRACT FACILITY MAINTENANCE BY CONTRACT MEDICAL SUPPLIES EQUIPMENT (NON-DWCF) OTHER DEPOT MAINT (NON-DWCF) MANAGEMENT & PROFESSIONAL SUP SVS STUDIES, ANALYSIS, & EVALUATIONS ENGINEERING & TECHNICAL SERVICES LOCALLY PURCHASED FUEL (NON-SF) OTHER CONTRACTS OTHER COSTS TOTAL MOBILIZATION PREPAREDNESS FY 2000 CURRENCY ACTUAL 6,602 584 219 0 7,198 134 143 47 722 2,257 2,318 49 16 815 784 10 0 0 9,872 38,902 73 226 203 616 376 1,818 7,802 9 924 1,203 75 2,925 3,463 4,183 3,381 3,255 24 53,931 944 RATE DIFF 156,103 FOREIGN PRICE PROGRAM FY 2001 0 0 -10 0 -167 -2 0 0 0 0 -3 0 0 0 -8 0 0 0 0 0 0 0 -36 -129 -2 0 -82 0 -129 -9 0 -45 0 0 0 0 0 -1,266 -55 GROWTH 291 27 7 0 116 84 -6 7 45 101 37 -2 2 53 35 0 0 0 1,609 -272 -20 3 8 10 5 29 124 0 14 19 3 47 55 67 54 53 0 862 15 GROWTH -2,176 2,748 225 632 -4,872 132 74 17 1,644 999 1,033 -1 -4 -90 -75 -10 72 172 -9,164 -1,826 -53 369 90 -316 -161 -111 -5,161 12 1,586 1,270 126 -1,549 -2,688 391 -14 184 -24 -860 2,617 ESTIMATE 4,717 3,359 441 632 2,275 348 211 71 2,411 3,357 3,385 46 14 778 736 0 72 172 2,317 36,804 0 598 265 181 218 1,736 2,683 21 2,395 2,483 204 1,378 830 4,641 3,421 3,492 0 52,667 3,521 -1,943 3,482 -14,762 142,880 317 CURRENCY RATE DIFF. PRICE PROGRAM FY 2002 0 0 -12 0 -12 0 0 0 0 0 -2 0 0 0 -4 0 0 0 0 0 0 0 -24 -100 -2 0 -49 0 -77 -6 0 -10 0 0 0 0 0 -925 -35 GROWTH 207 145 18 0 37 -2 -4 -3 256 13 58 -1 0 84 2 0 -3 17 -102 5,337 0 9 10 3 4 29 44 0 39 42 8 23 14 77 58 60 0 894 61 GROWTH 1,839 -2,095 -12 -3 -370 -62 -11 -2 -40 -297 -241 -19 -5 900 365 0 1,616 -28 9,833 -3,743 817 -235 3 -41 -220 -358 579 0 -827 -1,299 -209 268 -844 231 -377 312 0 15,511 -571 ESTIMATE 6,763 1,409 435 629 1,930 284 196 66 2,627 3,073 3,200 26 9 1,762 1,099 0 1,685 161 12,048 38,398 817 372 254 43 0 1,407 3,257 21 1,530 1,220 3 1,659 0 4,949 3,102 3,864 0 68,147 2,976 -1,258 7,434 20,365 169,421