Simply convincing – maximized availability for Eisenhüttenstadt Electrical Solutions Reference Instrumentation, Controls & Electrical SPPA-E3000 Complete Electrical Package provides the comprehensive, turnkey solution for all electrical systems in the EnBW district heating power station in Eisenhüttenstadt. The Result ■ Maximized availability thanks to high-quality components and proven solutions ■ Low power consumption thanks to energy-efficient design ■ High return on investment thanks to intelligent interaction of electrical and I&C systems ■ High planning and scheduling reliability thanks to trouble-free project execution The Plant After only two years of construction the EnBW Propower GmbH commissioned the Eisenhüttenstadt district heating power station in March 2011. Fired with substitute fuel and rejects from paper production, the power station has a thermal input of 150 MW and a gross electrical output of 32 MW. The plant supplies the nearby Progroup paper machine, the largest in Europe, and meets 50% of its power demand as well as its entire requirement for steam. The high-quality components and consistent planning of redundancies ensure long-term plant reliability. In addition the optimized solution includes all interfaces. It was consequently possible to seamlessly integrate the Siemens DCS SPPA-T3000 via IEC 61850. The common platform ensures easier operator control and enhanced transparency. Thanks to the low engineering effort, dependability in planning and scheduling, the new Eisenhüttenstadt power station went on line in due time. Modern and perfectly coordinated solutions from an expert provider – a worthwhile investment. The Task For construction of the new power station, EnBW needed a reliable partner capable of providing the latest state-of-the-art in solutions for technology and service. As well as the adequate experience, competence and quickness in meeting the tight construction schedule. The desired electrical system should be able to satisfy the most stringent demands in terms of availability and energy efficiency, and also optimally compatible with the control system. Our Solution The SPPA-E3000 Complete Electrical Package includes all electrical components and services comprised in construction of a new power plant and matches requirements perfectly. The electrical system package supplied to Eisenhüttenstadt offers excellent functionality and reliability. It includes: unit transformer, switchgears, auxiliaries transformers, uninterruptible power supply, emergency diesel generator, lighting, grounding, cabling and cable trays. „For our ambitious construction of a new power station, there was only one conceivable partner with a wealth of experience and state-of-the-art solutions. Siemens convinced us amongst others with the electrical system of SPPA-E3000.“ Dipl. Ing. Heinz-Jürgen Gebhardt Power Plant Manager at Eisenhüttenstadt EnBW Propower GmbH Answers for energy. Published by and copyright © 2012: Siemens AG, Energy Sector Freyeslebenstrasse 1 91058 Erlangen, Germany For more information contact sppa-e3000.energy@siemens.com www.siemens.com/energy/sppa-e3000 Siemens AG Fossil Power Generation Instrumentation, Controls & Electrical Siemensallee 84 76187 Karlsruhe, Germany E301_FR_CEP_Eisenhuettenstadt_e_V2-0 Order no. E50001-G230-A290-X-4A00 Printed in Germany Dispo 05401, c4bs-Nr. 7465 Printed on elementary chlorine-free bleached paper. All rights reserved. Trademarks mentioned in this document are the property of Siemens AG, its affiliates, or their respective owners. Subject to change without prior notice. The information in this document contains general descriptions of the technical options available, which may not apply in all cases. The required technical options should therefore be specified in the contract.