Simply convincing – maximized availability for Eisenhüttenstadt Electrical Solutions Reference

Simply convincing – maximized
availability for Eisenhüttenstadt
Electrical Solutions Reference
Instrumentation, Controls & Electrical
SPPA-E3000 Complete Electrical Package
provides the comprehensive, turnkey solution
for all electrical systems in the EnBW district
heating power station in Eisenhüttenstadt.
The Result
■ Maximized availability
thanks to high-quality
components and proven
solutions
■ Low power consumption
thanks to energy-efficient
design
■ High return on investment
thanks to intelligent
interaction of electrical and
I&C systems
■ High planning and
scheduling reliability thanks
to trouble-free project
execution
The Plant
After only two years of construction the
EnBW Propower GmbH commissioned the
Eisenhüttenstadt district heating power station
in March 2011. Fired with substitute fuel and
rejects from paper production, the power
station has a thermal input of 150 MW and a
gross electrical output of 32 MW.
The plant supplies the nearby Progroup paper
machine, the largest in Europe, and meets 50%
of its power demand as well as its entire
requirement for steam.
The high-quality components and consistent
planning of redundancies ensure long-term
plant reliability.
In addition the optimized solution includes
all interfaces. It was consequently possible
to seamlessly integrate the Siemens DCS
SPPA-T3000 via IEC 61850. The common
platform ensures easier operator control
and enhanced transparency.
Thanks to the low engineering effort, dependability in planning and scheduling, the new
Eisenhüttenstadt power station went on line
in due time.
Modern and perfectly coordinated solutions
from an expert provider – a worthwhile
investment.
The Task
For construction of the new power station,
EnBW needed a reliable partner capable of providing the latest state-of-the-art in solutions for
technology and service. As well as the adequate
experience, competence and quickness in
meeting the tight construction schedule.
The desired electrical system should be able to
satisfy the most stringent demands in terms of
availability and energy efficiency, and also
optimally compatible with the control system.
Our Solution
The SPPA-E3000 Complete Electrical Package
includes all electrical components and services
comprised in construction of a new power plant
and matches requirements perfectly.
The electrical system package supplied to
Eisenhüttenstadt offers excellent functionality
and reliability. It includes: unit transformer,
switchgears, auxiliaries transformers, uninterruptible power supply, emergency diesel
generator, lighting, grounding, cabling and
cable trays.
„For our ambitious construction
of a new power station, there
was only one conceivable partner with a wealth of experience
and state-of-the-art solutions.
Siemens convinced us amongst
others with the electrical system
of SPPA-E3000.“
Dipl. Ing. Heinz-Jürgen Gebhardt
Power Plant Manager at Eisenhüttenstadt
EnBW Propower GmbH
Answers for energy.
Published by and copyright © 2012:
Siemens AG, Energy Sector
Freyeslebenstrasse 1
91058 Erlangen, Germany
For more information contact
sppa-e3000.energy@siemens.com
www.siemens.com/energy/sppa-e3000
Siemens AG
Fossil Power Generation
Instrumentation, Controls & Electrical
Siemensallee 84
76187 Karlsruhe, Germany
E301_FR_CEP_Eisenhuettenstadt_e_V2-0
Order no. E50001-G230-A290-X-4A00
Printed in Germany
Dispo 05401, c4bs-Nr. 7465
Printed on elementary chlorine-free
bleached paper.
All rights reserved.
Trademarks mentioned in this document are
the property of Siemens AG, its affiliates, or
their respective owners.
Subject to change without prior notice.
The information in this document contains
general descriptions of the technical options
available, which may not apply in all cases.
The required technical options should therefore
be specified in the contract.