PowerGen India & Central Asia, New Delhi, May 2014 Plant Optimization through Integrated Design Update on H Class technology from Siemens Himanshu Garg VP, New Plants & Services Sales South Asia © Siemens AG 2014 All rights reserved. siemens.com/energy/fossil-power-generation Siemens Energy Solutions CCPP’s – Leading questions… 1. How to cope with the increasing energy demand, increase profitability and save the environment? Wirkungsgrad 3. How can CCPP’s provide grid support and stable operation in case of grid incidents? Page 2 New Delhi, May 5-7, 2014 NetzStabilisierung On Demand Sfar/ Garg @ Power-Gen India & Central Asia 2014 2. How can different load profiles be compensated by rapid availability of CCPP’s? © Siemens AG 2014 All rights reserved. What I would like to talk about today… • Siemens Energy Solutions product portfolio • Our plant design philosophy to meet major market drivers • Dangjin 3 – Asia’s most efficient plant • Service Concept • Operational experience • Conclusions Page 3 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. 50 Hz SGT5-8000H 60 Hz SGT6-8000H 375 MW 295 MW SGT5-4000F SGT5-2000E 172 MW 274 MW SGT6-5000F 232 MW 112 MW SGT6-2000E SGT-800 SGT-800 50/60 Hz Large-scale Gas Turbines Industrial Gas Turbines Mechanical Drive Oil & Gas Power Generation Power Generation Siemens Gas Turbines for 50Hz and 60Hz markets 47/50 MW SGT-750 36 MW SGT-700 31 MW SGT-600 SGT-500 25 MW 19 MW SGT-400 13 MW SGT-300 8 MW SGT-200 SGT-100 7 MW 5 MW Output in MW @ ISO conditions Page 4 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. Pre-engineered power plant solutions available as Simple (SSC) or Combined Cycle (SCC) H-Class Pioneering & Proven F-Class Flexible & Reliable E-Class Robust & Durable 50 Hz SCC5-8000H SCC5-4000F SSC5-2000E 60 Hz SCC6-8000H SCC6-5000F SSC6-2000E We deliver tailor-made power plants based on proven standards Page 5 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. Gas fired power plants Power output ranges in standard configurations 50 Hz 570 MW 512 MW 341 MW SCC6-8000H 2x1 SCC5-4000F 2x1 SCC6-5000F 2x1 SCC5-8000H 1S SCC5-2000E 2x1 cycle 862 MW SCC5-8000H 2x1 Combined 1140 MW 60 Hz SCC5-4000F 1S 253 MW SCC5-2000E 1x1 172 MW SSC5-4000F SSC5-2000E 690 MW 410 MW SCC6-5000F 1x1 345 MW SCC6-2000E 2x1 342 MW SCC6-2000E 1x1 171 MW Simple cylce 295 MW SCC6-8000H 1S 820 MW SSC6-5000F 232 MW 232MW SSC6-2000E 112 MW All values: ISO base rating Page 6 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. SCC-8000H series Performance and configuration overview SCC5-8000H 1S SGT-PAC 8000H 50 Hz 60 Hz 375 MW 274 MW 40 % 40 % SCC-8000H 2x1 SCC-8000H 1S 570 MW 410 MW SCC-8000H 1x1 > 60 % > 60 % SCC-8000H 2x1 1.145 MW 824 MW > 60 % > 60 % -- 1.236 MW -- > 60 % SCC-8000H 3x1 SCC6-8000H 3x1 SCC5/6-8000H 2x1 Page 7 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. SCC-8000H – supporting the Customer requirements… Highest efficiency Wirkungsgrad NetzStabilisierung Page 8 New Delhi, May 5-7, 2014 On Demand Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. Power plant solutions as an outcome of an integrated approach Thermal stress optimization GT GT Piping limits BOP limits Load Ramp Start-up readiness HRSG HRSG limits Start-up Electrica procedure l limits ST ST limits Integrated Plant Design Condenser Control Control system system Flexibility Environment Profitability Market Boundaries Optimization Criteria Integrated Plant design Water Auxiliaries chemistry FACY enables the world’s fastest start-up times without additional life time consumption Page 9 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. Dangjin 3 (former Bugok 3) – South Korea SCC6-8000H 1S Page 10 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. SCC6-8000H 1S – Dangjin 3 Proven H-class using advanced cycle technology Page 11 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. HRSG design Ulrich Hartmann (Irsching #4, Germany) 600°C steam parameter @ SH and RH section Dangjin 3 (South Korea) 585°C steam parameter with T91 material @ SH and RH section 11-Nov-2010 • Live steam temp.: • Live steam temp.: • Reheat temp: • Reheat temp: 600600 °C °C 600600 °C °C • Live steam temp.: 585 °C • Reheat temp: 585 °C Siemens is the only company with a 600 ºC HRSG in operation. HRSG solution for 600 ºC according ASME design available Page 12 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. Dangjin 3 – A globally optimized and integrated design based on a compact low level arrangement Stack Benson® HRSG w/ Boiler House IP/LP drums Air intake Generator Circuit Breaker Main Transformer HP separator Overhead crane PCC’s GasTurbine Generator Steam Turbine Lube oil skid Seal oil Vacuum pumpid Page 13 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. Danjing 3 – Environmental, Health and Safety (EHS) performance sets a benchmark… LTAFR Development Status as of November 2012 Mio Man-hours Mio man-hours LTAFR LTAFR 67 70 0,52 0,6 59 60 50 50 45 0,4 40 32 27 30 20 0,5 0,20 0,20 0,15 17 0,17 0,14 0,2 0,13 11 0,09 10 0 2004 LTA = Lost Time Accident 2005 LTAFR = 0,3 -87% 29 2006 2007 2008 2009 2010 2011 0,07 0,1 0,0 2012 LTAs x 100.000 Man-hours worked Dangjin 3 (2013) Man hours: 1,470 Mio LTAFR: 0,07 … confirming overall Siemens Energy Solutions project execution excellence Page 14 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. We are your most trusted partner offering cutting edge integrated solutions at highest quality Beyond 60 % efficiency: Dangjin – the most efficient fossil power plant in Asia Source: www.gseps.com “ “ We want to become the leading power producing company in Asia. And we want to continue our partnership with Siemens „ Using top quality components and software, Siemens engineered an outstanding power plant solution „ Wan-Kyoung Lee President and CEO GS EPS Co. Ltd Seoul Korea Page 15 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. 8000H Maintainability The SGTX-8000H core engine was designed for easy and fast maintenance All rotating blades, including compressor, are replaceable without a rotor lift. Row 1 Turbine Blades/Vanes/Ring Segments & Row 4 Blades can be replaced with or without cover lift. Vane 1 Removal Page 16 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 Turbine Blade 4 Removal © Siemens AG 2014 All rights reserved. 8000H Maintainability The SGTX-8000H core engine was designed for easy and fast maintenance Roll out/in capability of the turbine vane carrier enables exchange of stationary turbine hardware without rotor lift. Page 17 New Delhi, May 5-7, 2014 Roll out/in capability also allows for optional assembled spare vane carrier exchange concept which further reduces outage durations Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. 8000H Maintainability The Major Inspection concept allows access to all necessary components! Page 18 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. SGT-8000H References 2 Ansan Gyeongggi‐do, S. Korea 1 2 Liberty PA, USA Under Contract – COD 2015 2 Ulrich Hartmann 1 Under Contract – COD 2014 3 Lausward POSCO Power 2 Vohburg, Germany Düsseldorf, Germany Operating – COD 2011 Under Contract – COD 2015 Incheon, South Korea Under Contract – COD 2014/15 1 Patriot Daegu City Daegu, South Korea PA, USA Under Contract – COD 2014 Under Contract – COD 2016 1 Dangjin III Dangjin‐gun, South Korea Operating – COD 2013 3 2 Cape Canaveral Andong, South Korea FL, USA 3 Operating – COD 2013 3 1 Samsun Cengiz 2 Operating – COD 2013 Prai Riviera Beach Samsun, Turkey Penang, Malaysia FL, USA Under Contract – COD 2015 Under Contract – COD 2016 Operating – COD 2014 1 Port Everglades FL, USA Andong (KOSPO) Bandirma II Balikesir, Turkey Under Contract – COD 2016 Under Contract – COD 2014 1 San Gabriel Luzon, Philipines Under Contract – COD 2016 x Number of GTs 28 GTs under contract; 9 units in commercial operation Page 19 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. SGT-8000H Operational Status status Feb 2014 SGT5-8000H SGT6-8000H GT Validation Operation GT Validation Operation 85 480 137 (115 gas, 22 oil) 600 EBH 1525 9100 302 (236 gas, 65 oil) 30000 EOH 4365 16700 3822 41000 starts The SGT-8000H has achieved more than 1300 starts & 66.000 EOH Page 20 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. SCC-8000H will accumulate > 250.000 EOH until 2015 2000 2007 2009 2011 2013 2015 October December August January January January World Record PAC Launch – Concept Phase 1st Fire – Beginning of Validation Phase End of 50 Hz GT Test & Validation Phase and Extension to Combined Cycle 25,000 EOHs 250,000 EOHs Inauguration Combined Cycle Comissioning, Testing and Commercial Operation Ulrich Hartmann Proven Technology in Commercial Operation Extensive Operational Experience Pioneering technology is proven. Page 21 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. Siemens Energy Solutions is your most trusted partner offering cutting edge integrated solutions at highest quality 1. SCC-8000H power plant series is based on proven technology and is the result of a fully integrated approach. 2. World class performance & operational flexibility as well as highest plant reliability / availability. 3. Asia’s first H-class and most efficient power plant Dangjin 3 achieved commercial operation ahead of schedule 4. Dangjin 3 impressively demonstrates Siemens Energy Solutions project execution excellence and highest quality standards 5. Consequently the customer will continue the trustful partnership with Siemens Page 22 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved. Disclaimer This document contains forward-looking statements and information – that is, statements related to future, not past, events. These statements may be identified either orally or in writing by words as “expects”, “anticipates”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “will” or words of similar meaning. Such statements are based on our current expectations and certain assumptions, and are, therefore, subject to certain risks and uncertainties. A variety of factors, many of which are beyond Siemens’ control, affect its operations, performance, business strategy and results and could cause the actual results, performance or achievements of Siemens worldwide to be materially different from any future results, performance or achievements that may be expressed or implied by such forward-looking statements. For us, particular uncertainties arise, among others, from changes in general economic and business conditions, changes in currency exchange rates and interest rates, introduction of competing products or technologies by other companies, lack of acceptance of new products or services by customers targeted by Siemens worldwide, changes in business strategy and various other factors. More detailed information about certain of these factors is contained in Siemens’ filings with the SEC, which are available on the Siemens website, www.siemens.com and on the SEC’s website, www.sec.gov. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the relevant forward-looking statement as anticipated, believed, estimated, expected, intended, planned or projected. Siemens does not intend or assume any obligation to update or revise these forward-looking statements in light of developments which differ from those anticipated. Trademarks mentioned in this document are the property of Siemens AG, it's affiliates or their respective owners. Page 23 New Delhi, May 5-7, 2014 Sfar/ Garg @ Power-Gen India & Central Asia 2014 © Siemens AG 2014 All rights reserved.