Powerful FPSO solutions: a virtual tour

advertisement
Powerful FPSO solutions:
a virtual tour
What Siemens offers to improve your project‘s execution and operational performance
© Siemens AG 2015. All rights reserved.
What does it take to build
a most powerful FPSO?
© Siemens AG 2014.
2015. All rights reserved.
© Siemens AG 2014.
2015. All rights reserved.
Optimized solutions from Siemens,
for topside needs and
best-in-class systems and services
© Siemens AG 2014.
2015. All rights reserved.
One vendor – for a broad portfolio
Power generation
Power distribution
The Power system
Process compression
Water treatment
The Process system
Automation & instrumentation
Integrated operations
The control system
Telecommunication
© Siemens AG 2014.
2015. All rights reserved.
Lifecycle support
Power equipment optimized
and approved for FPSOs
Power generation
© Siemens AG 2014.
2015. All rights reserved.
Power distribution
The power for your FPSO:
Efficiently generated and reliably
distributed to where it’s needed
© Siemens AG 2014.
2015. All rights reserved.
The power for your FPSO:
Efficiently generated and reliably
distributed to where it’s needed
E-House
Generator
Gas turbine
3,3 kV thruster drives
3,3 kV thruster motor
© Siemens AG 2014.
2015. All rights reserved.
Reference: Champion 7
Offshore platform – Power generation module
The project
Project: Champion 7 East Power Plant
Location: South China Sea, Offshore Brunei
Owner: Brunei Shell Petroleum
End user: Brunei Shell Petroleum
Delivery: 2013
Weight: 1,018 MT
Dimension: 32m x 26m x 14m
Blast rated: Yes
The task
Champion is Brunei‘s most prolific offshore field. The field already has more than 260 wells
drilled from 40 platforms, among which is Champion 7. The existing power generation and
power management system was not sufficient for major future growth. This is mainly due to
the very old existing gas turbines which were at least 20-30 years old. The aim was to enable
zero black outs on the platform.
The solution
A plug & play power solution from a single source from own product development and
production facilities and decades of experience.
Scope of supply
•
•
•
•
•
2x 12MW GTGs
Fuel gas conditioning
E-House
MV switchgears
LV switchgears and DB’s
•
•
•
•
Battery and charger
Transformers
Emergency DG
Power management
The result
• Zero black outs on the platform
• Improved life time costs
© Siemens AG 2014.
2015. All rights reserved.
• Implementation of changes up to very late phase
• Reduced operational costs
Systems for the safe operation
of the vessel, oil and gas production
and processing
Automation and safety
© Siemens AG 2014.
2015. All rights reserved.
Marine systems and telecoms
The brain and the nerves
of your FPSO
Vessel management
Safety systems
Navigation systems
Production and process
management
Ballast control system
Cargo control system
© Siemens AG 2014.
2015. All rights reserved.
Reference: Petrobras’ P43 and P48 - FPSOs
The project
Owner: Petrobras
EPC: KBR
Petrobras’ P43 and P48 produce crude oil
from the Barracuda and Caratinga fields off
the coast of Brazil.
The task
Supply of process compression modules and complete safety and vessel management
systems for two deep water FPSOs.
The solution
Siemens had to deliver two major scope packages, six stand-alone compressor modules
and the FPSO automation and management systems. Focus was on fully tested solutions
to ensure reliable delivery and commissioning schedule.
Scope of supply
• Designing and manufacturing of six
processgaspackages each comprising
compression trains with variable speed
drive
• systems (VSDS)
• Coolers
• Scrubbers
• Separators
© Siemens AG 2014.
2015. All rights reserved.
•
•
•
•
•
•
•
•
Integrated control and safety systems
Process control systems (PCS)
Emergency shutdown systems
Fire- and gas-detection system (F&G)
Vessel management and information
management system
Petrobras’ P43 and P48
FPSOs
Packages that make production
and offloading as effective and
environmentally safe as possible
Water treatment
© Siemens AG 2014.
2015. All rights reserved.
Compression
Reliable oil & gas production,
offloading and export from your FPSO
© Siemens AG 2014.
2015. All rights reserved.
Reliable oil & gas production,
offloading and export from your FPSO
Produced water treatment
Sulphate removal
Seawater treatment
Compression
© Siemens AG 2014.
2015. All rights reserved.
Reference: BG/Teekay Knarr SRU System
The project
•
•
•
•
•
•
100k bwpd Seawater Injection Treatment with Sulfate Removal System
Operator: BG, UK / Teekay, Norway
Client: Samsung H.I., South Korea
Fabrication in South Korea
FPSO located offshore Norway
System start up 2014
Customer benefits
• Complete scope supply reduce interface project risk for the operator
• Holistic process design gives the highest system availability
• Siemens Compact Ultrafiltration (SCUF).technology contributed to significant space
and weight savings
Scope of supply
© Siemens AG 2014.
2015. All rights reserved.
• Filtration system
• Coarse strainers
• Ultrafiltration (SCUF)
• Dearation System
• Dearation tower
• Vacuum Package
• Sulfate removal System
• Membrane trains
• Feed booster pumps
• Membrane wash system
• Hyphochlorite Generator Unit
… and everything is working
seamlessly together…
© Siemens AG 2014.
2015. All rights reserved.
Integrated control and safety system
© Siemens AG 2014.
2015. All rights reserved.
Integrated control and safety system
Integrated power supply
© Siemens AG 2014.
2015. All rights reserved.
Integrated control and safety system
Integrated power supply
Integrated production units
© Siemens AG 2014.
2015. All rights reserved.
Relying on
Leading technology, optimized for offshore needs
Optimized and pretested packages or complete
modules engineered in house
© Siemens AG 2014.
2015. All rights reserved.
How can we support you to
build up and profitably operate
your FPSO?
© Siemens AG 2014.
2015. All rights reserved.
One vendor – one accountability
Single point of contract and single vendor taking responsibility for the delivery
and guaranteeing performance
•
•
•
•
Reduced risk
Reduce costs
Reduce delivery time
Efficient operations under a single vendor service contract
Take risk costs OUT your project’s economic calculus.
© Siemens AG 2014.
2015. All rights reserved.
Reduce risk
Less communication challenges for changes to electrical requirements
• Reduced risk by improved management through a single supplier
• Manufacturer knows his equipment and technology best and has direct
access to the factory
Less Integration errors
• Single vendor for engineering, design, fabrication, assembly and testing
Better inter package/module interface and operability testing
• Single vendor testing of module interfaces
Early engagement of the vendor in FEED reduces design risk
© Siemens AG 2014.
2015. All rights reserved.
Reduce costs
• Reduced on-site assembly work through pre-fabrication
• Potential elimination of margin stacking from suppliers
• Siemens owned and operated module yard
• Designers and fabricators on one site and therefore reducing schedule time and costs
• Removal of intermediate consultant improves engineering efficiency
• Lower purchasing, expediting and package coordination costs
• Reduced costs by optimization of steel/piping, electrical, and instrumentation
© Siemens AG 2014.
2015. All rights reserved.
Reduce delivery time
• Reduced bottlenecks in delivery, installation and commissioning by single vendor
management through a reduced fabrication time for the module
• A single vendor can see the total system effect of proposed electrical system changes
much earlier and can avoid critical changes
© Siemens AG 2014.
2015. All rights reserved.
Efficient operations
• Single vendor leads to improved standardization, reduced spare parts and better
control over as-built documentation
• A broader single vendor service portfolio
• Reduces contract complexity
• Reduction in points of contact for service
• Product and system service from one hand
• Siemens integrated operations on one platform
• Siemens remote support
• Upgrades and modifications from one vendor
© Siemens AG 2014.
2015. All rights reserved.
Be sure you will get
Best performance
for tough challenges
© Siemens AG 2014.
2015. All rights reserved.
By a partner who will give all
the support you need,
in every phase of the FPSO-life
© Siemens AG 2014.
2015. All rights reserved.
Most powerful solutions for your FPSO
© Siemens AG 2014.
2015. All rights reserved.
Download