Safety Innovations for Oil & Gas

advertisement
Safety Innovations for Oil & Gas
Siemens innovative approach to functional safety helps meet the requirements of the oil and gas
industry by maximizing safety while also ensuring high availability and reduced costs
© Siemens AG 2015. All rights reserved.
Process safety, layers of protection, functional safety
Plant and
Emergency
Response
Mitigate
Emergency response layer
Containment,
Dike, Vessel
Passive protection layer
Fire and Gas
System
Active protection layer
Incident
SIS
Emergency
Shutdown
System
Emergency
Safety layer
Shutdown
Prevent
Operator
Intervention
Operator
Process alarm
Process control layer
Intervention
BPCS
Normal
Process Value
© Siemens AG 2015. All rights reserved.
behavior
Process control layer
The Basic Process Control System (BPCS) & Safety ...
© Siemens AG 2015. All rights reserved.
Increased operator efficiency through task-oriented
organization of process displays
Topology
Level 1
Plant / process
Level 2
Plant area
Orientation
navigation
Monitoring
& control
Level 3
Plant section
Level 4
Functional
aspects
Diagnostics
(control)
© Siemens AG 2015. All rights reserved.
Overview
display
Control
display
Detail
display
Support
display
Performance/
availability
Key process
values (normal
operation)
P&I oriented
e.g. group
control
• Topology-oriented
and task-oriented
plant hierarchy
(level 1 - level 3)
• Significance of level 2,
more displays, mainly
used for monitoring
but also for controlling
• Several detailed views
on the same plant
section, mainly used
temporarily
for start-up,
diagnostics etc.
Information-based visualization in SIMATIC PCS7
SIMATIC PCS 7 visualization to support operators
Hybrid displays
Trend display
with bar graph
2
Spider diagram to
display KPI
3
Temperature profile
of distillation column
1
Gradient
display
Graphic objects support situational awareness and decision-making
© Siemens AG 2015. All rights reserved.
Alarm management
Effective alarm management with SIMATIC PCS 7 alarm system
Alarm processing and filtering
Smart alarm hiding
Prioritized alarms depending on urgency
•
•
•
Alarm-related help texts
Operator guidance (loop-in alarm)
Process oriented representation of alarms
Priority
•
•
•
ISA 18.2
Alarm management design supports operators when handling abnormal situations
© Siemens AG 2015. All rights reserved.
EEMUA 191
IEC 62682
Safety integrated for process automation
The fully integrated safety solution
Integrated control & safety capability
Safety lifecycle tools for engineering and
operation cause & effects matrix
+
+
Integrated EX-IO for
+
Zone 1
Flexible Modular
Redundancy (FMR)
Flexible, scalable,
+
high available
© Siemens AG 2015. All rights reserved.
SIL capable
instruments
+
Integrated safety
fieldbus technology
PROFIBUS and
+
PROFINET
Flexible Modular Redundancy ™
Flexible Redundancy at all levels
• Scalable for different applications
(ESD, HIPPS, F&G etc.)
• Controller redundancy for availability
.. not required for safety
• Physical separation to combat
common cause
• Flexibility to accommodate different
SIF architectures so …
• Field device redundancy can be
designed to achieve safety and
availability goals
• I/O redundancy independent of CPU
© Siemens AG 2015. All rights reserved.
Integrated control & safety
ES
ES
OS
Interfaced
BPCS
SIS
Gateway
ES
OS
Interfaced
BPCS
SIS
ES
OS
BPCS
SIS
Common
© Siemens AG 2015. All rights reserved.
Features and benefits of integrated control & safety
Enterprise Level
Common Operator Interface
• Benefits
Single Window
• Consolidated Alarms, SOE
Reduced
• • Integrated
Assetcost
Management
Common
Engineering
• Easier
to maintain
• For Automation, Instrumentation,
Visualisation
• Drives,
Easier
to change
• Safety Lifecycle Tools
• Reduced spares
Common Hardware
holdings
• Reduced
training
Integrated
or Common
as required
• Improved
Standard
& Safety I/O
same rack
operability
& in
safety
Field Level
© Siemens AG 2015. All rights reserved.
• Reduced
risk
Standard
& Safetyproject
Communication
on the same networks
Design & engineering performance
Integrated safety lifecycle tools
SIMATIC Safety Matrix
© Siemens AG 2015. All rights reserved.
Design & engineering performance
Integrated safety lifecycle tools
© Siemens AG 2015. All rights reserved.
Design & engineering performance
Integrated safety lifecycle tools
The realization phase
• The SIMATIC Safety Matrix as engineering tool
• Configuration of the safety functions using
the Cause & Effects method
• Automatic TÜV-certified creation of the Safety Logic
from the Cause & Effect matrix
• Easy configuration without special
programming knowledge
• Online monitoring mode for verification and validation
• Reduces systematic errors
• Simplifies engineering, verification and validation
• Saves time, improves safety
© Siemens AG 2015. All rights reserved.
Design & engineering performance
Integrated safety lifecycle tools
Operation & maintenance, modification
• Online view of the signal status, Cause & Effects
Automatic integration in PCS 7
• First up alarm display and storage
• Supports operator bypass, reset, override
and parameter changes
• Sequence of event recording
• Automatic report of operation functions
• Automatic version tracking
• Automatic documentation of changes
• Reduces systematic errors
• Simplifies engineering, verification and validation
• Improves operator efficiency
• Saves time, improves safety
© Siemens AG 2015. All rights reserved.
Decentralized automation for the hazardous area
SIMATIC ET 200iSP
Failsafe modules for SIMATIC ET 200iSP
Features
• 3 failsafe modules to install directly
in Ex-zone 1/21; up to SIL 3, PLe
• Digital Input Module F-DI8 NAMUR
• Digital Output Module F DO4, 17,4V DC 40mA
• Analogue Input Module F-AI4 HART
Customer benefits:
•
Reduced installation effort by using ET 200iSP compared to traditional solutions (with Ex barriers)
•
Line monitoring up to sensors
•
SIL calculation advantages (no Ex barriers)
•
Complete portfolio - failsafe protection in Ex-Zone 1 especially for applications like ESD
(Emergency Shut Down), boiler protection (e.g. at biogas plants), fire-extinguishing system or gas / fire detection
© Siemens AG 2015. All rights reserved.
Selected instruments pressure, temperature, level,
Valve positioners, analysers
© Siemens AG 2015. All rights reserved.
Safety integrated for process automation
The fully integrated safety solution
Your benefits using safety integrated for process automation from Siemens
One partner for control & safety.
Diagnostics and visualization of safety
are directly integrated into the DCS.
Employees can be trained on one
system for control & safety.
They are able to maintain both systems.
Reduce your personnel costs.
A fully integrated system forms the basis for consistent
engineering and predictive maintenance. Minimize your
downtimes and maximize your profit. Keep the process
running with integration.
© Siemens AG 2015. All rights reserved.
We are happy to answer your questions!
© Siemens AG 2013.
2015. All rights reserved.
Download