INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission, Ghana amankwak@energycom.gov.gh NAMA AREA & GOAL NAMA Area: Energy sector (Improvement of Energy Efficiency in the Commercial /Industrial sector) Goal : improve energy efficiency and reduce GHG emissions BACKGROUND & JUSTIFICATION Type of Action: Technology: Greenhouse Gas: Expected Timeframe: Implementation Agencies: Status of Programme: National Policy/Programme Capacitor Banks Carbon Dioxide (CO2) 2016 -2020 Energy Commission, ECG, 27 installed nationwide Justification: • Obsolete equipment with low power factors • Need for power factors improvements to save energy • Electricity demand growing at 12% /yr (250MW/yr) • Increasing thermal power generation in electricity supply • Increasing emissions from power generation • High distribution losses (25.4%) • Increasing cost of power generation • Huge potential for energy saving in commercial/industrial sectors DESCRIPTION OF MITIGATION ACTION (NAMA) It involves the up-scaling of the installation of capacitor banks from 27 to cover 1,047 new Commercial and industrial facilities over five year period The proposed NAMA seeks to reduce electricity demand, thereby reduce GHG emissions through avoided electricity generation. Objectives: • To improve power factors, • Reduce power demand and • GHG emissions from power generation • Reduce power cost in the commercial /industrial sector Planned Activities • Establishment and running of Secretariat • Awareness /education /stakeholder consultation • Certification of contractors for installation • Audit, consultation, Procurement and installation • Monitoring of Performance PROPOSED IMPLEMENTATION PLAN Output of measure Activities Coordinat or Key Stakeholder Detailed institutional structure Establishment of NAMA secretariat NS ECG/EPA/GRIDCo Awareness created Awareness /education NS ECG/ Customer Certified contractors Certification NS ECG/GRIDCo Results of PF study Agreement signed Capacitors installed Audit, consultation, Procurement and installation NS Customer /Contractors/ECG/GRIDCo Year 1 Year 2 Year 3 Year 4 Year 5 NAMA IMPACTS AND OUTPUTS Intended impacts I. • II. • • • • GHG Impacts GHG savings Non-GHG Impacts Energy savings Lower energy expenditure Reduced system losses Increased load carrying capacity of network Expected outputs • Improved power factors • Reduced GHG emissions • Reduced energy-use expenditure • Reduced energy demand • Reduced energy losses • Reduced operational cost • Job created Key performance indicators • The number of commercial and industrial entities installed capacitors. • Changes in maximum demand on electricity bills on monthly basis • Expenditure on monthly electricity bill (maximum demand charge and power factor surcharge). • Power factor improvements PLANNED ACTIVITIES, ESTIMATED COST AND FUNDING SOURCES Planned activities for the preparation of NAMA Estimated full cost (US$) Establishment and running of Secretariat Funding sources Domestic contribution International support 699,351 209,805 489,546 Awareness /education 135,000 40,500 94,500 Certification 20,000 20,000 Audit, consultation, Procurement and installation Miscellaneous Total Any others (Banks) 7,525,313 7,525,313 20,000 20,000 8,399,663 290,305 584,046 7,525,313 POTENTIAL FOR TRANSFORMATIONAL CHANGE AND SUSTAINABLE DEVELOPMENT BENEFITS Transformational Change • Promote the adoption of energy efficient technologies • Develop capacity and experience energy efficiency service delivery • Promote the standardization of energy efficiency technologies/services Sustainable Development Benefits • Economic: Reduced energy expenditure, reduced production cost, increased competitiveness, increased potential for growth, reduced fuel import bill • Social: More energy for other productive uses, enhanced livelihoods, provision of more services, job creation • Environmental: Reduced GHG emissions, reduced indoor pollution through increased rural access to electricity, free financial resources for development of other energy sources (e.g. Renewables) • Institutional: Technology transfer and Retooling of commercial/industrial facilities RELEVANCY OF THE PROPOSED NAMA IN THE NATIONAL POLICY CONTEXT NAMA ties directly with the following National and Sectoral Development Policies and Strategies: • • • • • Ghana Shared Growth Development Agenda (GSGDA) II (2014-2017) Energy Efficiency & Conservation Section of the GSGDA II Energy Sector Strategy & Development Plan (2010) National Energy Policy Energy Efficiency & Conservation Strategies and Programmes (2014) THE WAY FORWARD • Ghana is seeking public and private sector partners for the design, implementation and financing of the NAMA • Private and public sector partners have opportunity to invest Ghana’s NAMA activities on profitable, secure and creditworthy terms GHANA NAMA INVESTMENT GUIDE DEVELOPED The purpose among others is to: • Identify the purpose and potential project pipeline of NAMAs in Ghana • Provide step-by-step flow of NAMAs development procedures • Facilitate information sharing among key players on NAMA mechanisms • Provide one-stop –shop on NAMA investment opportunities in Ghana RELEVANT CONTACT DETAILS Name: Executive Director Organization : Environmental Protection Agency Postal address : P. O. Box M326, 91 Starlets Road, Accra, Ghana Phone : 0302-664697/8 Fax: 0302-662690 Email : info@epa.gov.gh Web page : www.epa.gov.gh