________________________________________________________________________________________________ CURRICULUM VITAE Name : Syamsul Bachri Usman Date of Birth : December 06th, 1988 Nationality : Indonesian Profession : Structural Engineer Professional Association : - Education Bachelor Degree, Bandung Institute Engineering. : Software Capability : Language of Technology (ITS), Majoring : SACS Version 5.2(EDI), 5.3 – Structural Analysis MathCAD – Engineering Calculation Program Ms Word, Ms Excel, Ms Power Point, etc Auto CAD English, Indonesia Good X English Indonesia Any other Reasonable X SUMMARY OF EXPERIENCE DETAILED WORKING EXPERIENCE March 2012 – Present Excellent : ZEE Engineering Sdn. Bhd Joined ZEE Engineering Sdn. Bhd as a Structural Engineer. Page 1 in Marine ________________________________________________________________________________________________ Client : Noble Energy Project : Alen Field Development – Phase II Project Description: Noble Energy Equatorial Guinea Ltd. is developing the Aseng and Alen prospects off the coast of Equatorial Guinea. The Alen prospect is a gas condensate field 50 km east of Bioko Island in 238 ft. (72.5m) water depth. There are two distinct phases in the Alen field development. Phase 1: Transportation and Installation of a well head platform jacket (WHP) already performed in October 2011. Phase 2: Transportation and Installation of the WHP Topside and a central production platform (CPP) in the first quarter of 2013. Mustang Engineering located in Houston is the designer contracted by Noble Energy, while the fabrication will be executed by J. Ray McDermott at their yards in Amelia, Louisiana. As part of phase 2, the CPP jacket and piles will be transported from Amelia, Louisiana to Equatorial Guinea on the H-404 barge, then installed by the Thialf. Heerema Marine Contractors Nederland BV (HMC) have been awarded by Noble Energy for the Grillage and Seafastening design for CPP Jacket and CPP piles on the H-404 barge. Position : Structural Engineer Responsibilities: 1. Grillage and seafastening design for the CPP jacket on the H-404 barge, including: (using SACS 5.3 and manual calculation) a. Design of required weld (leg) sizes b. Design of uplift straps (tie-downs) c. Design of wingplates d. Design of pitch plates 2. Design of access platforms for seafastening cutting 3. Structural integrity verification the barge. Client : Larsen & Toubro - Heerema Marine Contractors Nederland BV (HMC) Project : Deen Dayal West Field Development - PLQP Project Description: As a part of Process-cum-Living Quarter Platform Project (PLQP Project) GSPC propose to utilize the gas produced from well platform DDW-1. DDW-1 has been being executed through a separate contract. The PLQP platform will be connected with a bridge to the existing DDW-1 wellhead platform. Gas from PLQP will be transported through sub-sea pipeline & Slug catcher to Onshore Gas Terminal (OGT). Heerema Marine Contractors Nederland BV (HMC) have been awarded by Larsen and Toubro (L & T) for the transportation and installation for PLQP Platform. Position : Structural Engineer Responsibilities: 1. DSF Rigging Platform Design In-Place, Transportation, Lifting, Misc. Calculation 2. North Deck Rigging Platform Design In-Place, Transportation, Lifting, Misc. Calculation 3. PLQP Jacket Rigging Platform Design In-Place, Transportation, Lifting, Misc. Calculation 4. PLQP Jacket Hokk-On Rigging Platform Design In-Place, Transportation, Lifting, Misc. Calculation Page 2 ________________________________________________________________________________________________ Client Project : : BG Exploration and Production India Limited Panna New SPM System and Pipeline Project Project Description: Oil & Natural Gas Corporation (ONGC), Reliance Industries Ltd (RIL) and BG Exploration and Production India Limited (BGEPIL) are joint operators of the Panna-Mukta offshore oil and gas production field situated in the Arabian Sea, off the west coast of India near Mumbai. The Panna Field is located 95 km offshore northwest of Mumbai, India. The average water depth in the field is 154 ft (47 m). Panna & Mukta fields have twelve well head platforms and a Processing Platform (PPA). PPA is bridge connected to PA wellhead platform in East, PQ living quarter platform in North and PFP flare platform in South direction. Oil and gas produced from all the wellhead platforms are brought to PPA through pipelines for processing. The production from PL, a new wellhead platform which is already installed, will also be routed to PPA. Panna oil stabilization is carried out at PPA platform in 3 stages. This stabilized oil is then pumped to the bridge-connected PA platform via dry oil booster pumps. This oil is metered at PA in the LACT (Lease Automatic Custody Transfer) unit. The metered oil is sent to the export tanker via a 12-inch pipeline. Present Panna SPM facility is located east of PA platform at about 1.54 km straight distance from PA platform. Approximately 40,000 bpd of processed oil is loaded from Panna processing facility to a tanker via SPM. The 12-inch oil export pipeline is installed on PA east face and is connected to a PLEM. The PLEM is connected to the buoy via subsea hoses. The oil export pipeline is nearing the completion of its design life of 25 years while the buoy is a stock buoy of 326 MT rated capacity. Under New Panna SPM project, it is planned to install a new SPM system. The new SPM system will be designed for handling normal production of 40,000 bpd of oil production and maximum flow of 75,000 bpd. The entire system will be rated for the dry oil booster pumps’ shut off pressure of 170 psig. The subsea pipeline length will be approximately 3 km up to the PLEM. A subsea pig receiver will also be installed. The oil will be sent from the PLEM to the SPM via subsea hoses, and from SPM to the export tanker through floating hoses. The entire SPM and PLEM system will be designed to facilitate both double banking and tandem mooring of the export tanker. Position : Structural Engineer Responsibilities: 1. Wire Guide Design (Local Check – Using SACS Local Check) 2. Design of padeye. 3. Misc. Calculation (Gusset Plate Check, Shear Stopper Check, e.t.c) Page 3 ________________________________________________________________________________________________ Client : Pertamina Hulu Energy – West Madura Offshore (PHE-WMO) Project : FEED for Subsea Manifold Project Description: Pertamina Hulu Energi West Madura Offshore (PHE WMO) the operator of the West Madura Offshore and Poleng assets located in offshore East Java, plans to build 3 (three) new platforms that are located in Poleng Field, West Madura. The Facilities are KE 38B, KE 39, and KE 54. The product will be transported to KE 38 Platform via subsea manifold before being sent to PP Platform. The proposed new 16” pipeline route from KE-38P subsea manifold to PPP will be adjacent to and alongside the existing pipeline route between KE-38 to PPP with a total length at the proposed pipeline route is approximately 20.68 km. Position : Structural Engineer Responsibilities: 1. Modelling and analysis using SACS Program for some analyses : a. Operational Analysis for Structural Design. b. Transportation Analysis. c. Lifting Analysis. d. On Bottom Analysis. e. Misc. Calculation (Anode, padeye, e.t.c). 2. Check for Subsea Manifold drawing. January 2012 – March 2012 : Methode Engineer PT. Citra Panji Manunggal Client : MOBIL CEPU LIMITED (EXXON GROUP) Project : BANYU URIP PROJECT. EPC 2 ONSHORE EXPORT PIPELINE SYSTEM Responsibilities: 1. Preparing Procedure and Engineer Calculation 2. and other task from engineer that related to the project. Oct 2011 – Jan 2012 : PT. ALSERA PORTINDO Field Engineer Supervisor Client Project : : PERTAMINA-TALISMAN, JOB JAMBI MERANG CONSTRUCTION EQUIPMENT FOR HSE JOB PERTAMINA-TALISMAN JAMBIMERANG : FIRE SHELTER, WAREHOUSE CHEMICAL BUILDING, AND TEMPORARY STORAGE FOR HAZARDOUS BUILDING. Responsibilities: 1. QC check for material, dimension, etc based on AFC Drawing and spec from client. 2. Coordination with client and contractor. March 2011 – May 2012 : PT. DINAMIKA TEKNIK PERSADA Offshore Structure Engineer (Freelance) Client : PERTAMINA Project : RE-ANALYSIS MWPB JACKET PLATFORM. Responsibilities : 1. Re-Analysis MWPB Jacket Platform ( Inplace condition ) using GT-Strudl and SACS. Page 4 ________________________________________________________________________________________________ February 2010 – May 2010 : PT. TRIPATRA ENGINEERS AND CONTRACTORS Internship Work in Offshore Structure Engineering Department Client Project : : PERTAMINA RE-ANALYSIS OF BSC PLATFORM FROM PHE ONWJ (IN-PLACE, SEISMIC, FATIGUE WITH SACS 5.2 SOFTWARE ). Responsibilities : 1. Responsible for consulting and making studies in research process. 2. Research load on the platform. 3. Design of preliminary BCS Platform that include: Deck Plan and elevations, Deck framing, Connection (joint) and stiffeners, Welding Detail, Pile and conductor detail, and Padeye. 4. Analysis of structure that includes all condition: Analysis In-place (condition operation & strom), analysis of dynamic Earthquake (seismic), and analysis fatigue. 5. Joint strengthening analysis based on API RP 2A WSD of BCS platform. 6. Done various other duties as assigned under the direction of senior engineer. 7. Manage all electronic and hard copy documents, so that responsible for all flow of drawings and documents to senior engineer. 8. Responsible for recommending areas for future studies. 9. Done other duties as assigned. January 2010 – February 2010 Internship Work in Field Engineer : CODECO ENERGY LTD. Page 5