BE Form 07 SCHOOL: SCHOOL ADDRESS: (Please Check appropriate box) SCHOOL HEAD: PTA PRESIDENT: BRIGADA ESKWELA May 18-23, 2015 SCHOOL ACCOMPLISMENT REPORT (To be accomplished by the School Head) SCHOOL ID: Elementary ) Secondary CONTACT NUMBER: CONTACT NUMBER: A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED BASED on SIP & DepEd Memo No. 41, s. 2015, Annex C (all accomplishments supported with pictures) (Please check appropriate column) What was done? Equipment New Construction Replaced Repaired Repainted 1. Roofs/rain gutter 2. Walls/Ceilings 3. School Building Directory 4. Windows and Doors 5. Chairs/Desks Tables, and Blackboards 6. Comfort Rooms 7. Leaking Pipes 8. School Grounds/Landscaping 9. School Signs/signage’s 10. Electrical 11.Fire extinguisher (suspended outside) 12. School free from any sharp objects 13.Prepare directory of identified classroom for evacuation 14. Drainage 15. Signage’s for on-going construction/condemned buildings 16. Exit plan/signage of high story building 17 Post directory of emergency contact 18. Establish early warning devices in case of emergency 19. School equip with first aid kits 20. Vegetables garden 21. No. of trees planted 22. Waste depository (with segregation) 23. Storage room(with segregation of contents) 24. Disaster Organizational Chart 25. Others specify B. DONATIONS / MATERIAL RESOURCES GENERATED (Use separate sheet, if needed) Type of Donations Source Estimated Cost Total Others C. VOLUNTER SERVICES (Use separate sheets of daily attendance) Name of Number of Volunteers Type of Volunteer Individual/ Day Day Day Day Organization 1 2 3 4 A. (PRIVATE SECTOR) 1. NGO 2. PTA 3. SGC 4. Gawad Kalinga 5. Corporation 6. Etc. B. (COMMUNITY) 1. Parents 2. Alumni 3. Private Individual / Community Members 4. Religious Organization (Youth and Adult) C. (Gov’t Agencies)LOCAL & NATIONAL 1. Congressional Officials and Staff 2. Provincials Officials 3. City Officials 4. Barangay Officials 5. SK Officials 6. Provincial /City Employees 7. Fireman / PNP etc. 8. AFP (PA, Marine, etc) 9. Barangay Workers 10. Other Volunteers TOTAL Day 5 Day 6 Total D. ESTIMATED COST OF VOLUNTEER SERVICES RENDERED. (Use separate sheets, if needed) Type of Services Rate per Rate per Total Number Total Number Total Estimated Day Hour of Volunteers of Hours Costs Rendered Masonry 360 45 Carpentry 360 45 Plumbing 360 45 Electrical/Electronic 360 45 Landscaping 360 45 Painting 360 45 Ordinary Labor 280 35 Others 280 35 Total E. IMPACT OF BRIGADA ESKWELA (Enrollment Rate) % of increase/Decrease Enrolment June 15, 2015 minus Enrolment Yearend March 2014-15 = F. SIGNIFICANT EVENTS / EXPERIENCES (Use separate sheets, if needed) What happened? Who were involved? When? What is/are its important contribution to the operation of the school or to the existing needs of the school? G. ISSUES AND CONCERN (Describe briefly problems encountered and how resolved) H. LESSON LEARNED / BEST PRACTICES I. SUGGESTION TO STRENGTHEN BRIGADA ESKWELA PROGRAM J. EVIDENCES / ATTACHMENTS a. Photos (before, during and after) b. Photocopy of all completed BE Forms: 1. Form 01 3. Form 03 5. Form 05 2. Form 02 4. Form 04 6. Form 06 Prepared by: Date: __________________________________ _____________ ______________ Name of School Head with Signature and Designation Submit this Report to Division Office on or before June 19, 2015 (Two (2) folders) BE Form 01 BRIGADA ESKWELA PHYSICAL FACILITIES REPAIR AND MAINTENANCE NEEDS ASSESMENT FORM (To be accomplished by the School Physical Facilities Coordinator) Instruction: Conduct an ocular inspection of the school physical facilities listed below. Then provide the needed information to facilitate the improvement to be done on these identified facilities. (If needed, you may use separate form for each classroom or school facility.) FACILITIES Condition (Check One) Remarks Nature of improvement Material Resources Manpower Needed Needed Needed (Indicate quantity (e.g. repair, repairing, (Indicate kind and and nature of labor Satisfactory Unsatisfactory If Unsatisfactory, replacement, etc.) quantity) services needed) describe the problem Roofs/gutters Ceilings/walls Windows and doors Blackboards/tables Chairs/desks/tables Comfort rooms Liking pipes School ground/landscaping School signs/signage’s electrical Fire suppression/extinguisher School free from sharp objects Prepare directory of identified classroom for evacuation Drainage System Signage’s for on-gong construction/condemn building Exit plan/signage’s of high story building Post of directory of emergency contact Establish early warning devices in case of emergency School equip with 1st aid kit Other specify Prepared by: ______________________________ ________________ School Physical Facilities Coordinator Date of Inspection Noted: _____________________________ TIC/Head Teacher/Principal BE Form 02 SCHOOL WORK PLAN (to be accomplished by the School Head) BRIGADA ESKWELA Instruction: List down all the specific that you will be undertaking in relation to the conduct of Brigada Eskwela in your school and fill in the required information. Add another sheet if needed. Once completed, submit a copy to the Adopt-A-School Program coordinator or Brigada Eskwela coordinator of your division on or before January 31. KRA Activities Timeline Persons Responsible Materials Needed Budget 1. Advocacy and Marketing 2. Resource Mobilization 3. Implementation 4. Monitoring and Evaluation 5. Reporting Prepared by: _________________________ Signature over Printed Name _________________ Date Prepared Noted by: ______________________________ TIC/Head Teacher/Principal BE Form 03 RESOURCE MOBILIZATION FORM (TO BE ACCOMPLISHED BY THE Resource Mobilization Committee) BRIGADA ESKWELA Instruction: using the completed BE For, 01: Physical Facilities Needs Assessments Form as basis, summarize the resource (materials and manpower) needed and list down the potential source or partners to be tapped. Add additional sheet if needed. The Status and Remarks columns should be updated regularly to determine progress in acquiring resources needed. Materials Needed Quantity Key Persons/Organizations to be Tapped Strategies/Plan of Action Person Responsible Status Remarks Labor Skills/Volunteers Needed Quantity Key Persons/Organizations to be Tapped Strategies/Plan of Action Person Responsible Status Remarks Prepared by: ______________________________________ Resource Mobilization Committee Chairperson Noted: _______________________________ TIC/Head Teacher/Principal BE Form 04 DAILY ATTENDANCE OF VOLUNTEERS BRIGADA ESKWELA Date: _____________________ Instructions: Volunteers themselves should personally fill in the details required by this form under the supervision of any of the committee members. For the last column, Indicate if masonry, carpentry, plumbing, painting, electrical, gardening/landscaping, ordinary labor, or others. TIME NAME POSITION/DESIGNATION ADDRESS/ORGANIZATION/AFFILIATION CONTACT NUMBER Noted: __________________________ School Head _____________________ Date IN SIGNATURE OUT TOTAL NUMBER OF HOURS SERVED NATURE OF VOLUNTEER SERVICE RENDERED BE Form 05 BRIGADA ESKWELA RECORDS OF DONATIONS RECEIVED (To be accomplished by the Documentation Committee) NAME OF DONOR ITEMS OR MATERIALS QUANTITY DATE RECEIVED Prepared by: _____________________________________ Committee on Documentation Chair/Member Noted: _____________________________________ School Head ASSUMED COST OF ITEMS PER UNIT TOTAL BE Form 06 DAILY ACCOMPLISHEMENT REPORT (To be accomplished by the Program Implementation Committee) Day 1 2 BRIGADA ESKWELA 3 4 5 6 Date Instruction: list down all the activities that needs to be undertaken for each of the Brigada Eskwela week. At the end of each day, please mark the appropriate column that corresponds to status of each activity. Cite reason for non-completion. STATUS Activities Prepared by: _________________________________________ Program Implementation Committee Chair/Member Noted by: _________________________________________ School Head Completed Status but not yet completed Not done REMARKS/RECOMMENDATIONS