Item 1 504 Project Cost Worksheet Purchase Land………………………………………………… $__________________ Purchase Land & Improvements…………………………… $__________________ Purchase Improvements……………………………………. $__________________ Add an Addition to a Building………………………………. $__________________ Make Renovations to a Building………………………………. $__________________ Construct a Building……………………………………………. $__________________ Make Building Leasehold Improvements……………………. $__________________ Purchase/Install Equipment…………………………………… $__________________ Furniture/Fixtures………………………………………………. $__________________ Refinanced Debt………………………………………………… $__________________ Professional Fees……………………………………………. $__________________ Other Expenses…………………………………………………. $__________________ TOTAL 504 PROJECT COST: $__________________ Non-504 Financing Requested: Working Capital $__________________ Inventory $__________________ Other (describe below) $__________________ d:\106748592.doc 1 of 3 SBA 504 Loan Eligible Uses of Proceeds a. b. c. d. e. Purchase Land 1. Purchase price of land 2. Previously acquired land may be included in the 504 Project. If acquired within two years land will be valued at cost. If owned for more than two years land will be valued by an appraisal Site Improvements 1. Grading, paving, landscaping, hook ups, curb and gutter, etc. 2. No more than 5% of total project costs can be for “community” (off-site) improvements Purchase of Land & Improvements (one or more existing building(s), Purchase Improvements (Building only, Land is leased) 1. Company must occupy 51% 2. No time limit on occupying the 49% leased space Add an addition or renovate existing buildings 1. Convert, expand, or renovate one or more existing building(s). 2. Cannot improve tenant space, however, certain HVAC and basic electrical and plumbing fit out can be included. New Construction 1. Construction of one or more new building(s) 2. Can permanently rent 20% if: 2.1 60% of total sq. ft. is immediately occupied by borrower 2.2 Borrower occupies some of the remaining space within 3 yrs. 2.3 Borrower will occupy all of the remaining space within 10 yrs. or 2.4 Borrower occupies at least 67% of total sq. ft. and rents 33% for 10 years. Occupies all of space after 10 years. 3. Cannot improve/finish tenant space 4. 10% of total construction costs can be added to the Project as contingency for cost overruns d:\106748592.doc 2 of 3 f. g. h. i. Purchase/ Install machinery and equipment, Furniture and Fixtures 1. Cost includes installation 2. Assets must have useful life of ten years 3. Assets must be at a fixed location (no rolling stock) 4. Assets having less than a ten-year useful life are eligible if the assets such as furniture, fixtures and equipment are essential to and a minor part of the 504 project Direct and essential professional fees for the project 1. Title Insurance 2. Architect 3. Engineering 4. Environmental (can include cleanup) 5. Appraisal 6. Municipal hookups 7. Survey 8. Legal (directly related to project – i.e., zoning or other land use approvals, legal searches, title insurance, recording fees) legal fees associated with the closing are not eligible. 9. Accounting ; Those costs directly related to the project for example preparation of interim financial statement, projections and similar charges. Other Expenses (repayment of interim financing costs) 1. Points paid to Lender for only the interim financing of the 504 portion. 2. Interest paid to the Lender for the interim financing of the 504 portion until the funding of the SBA 504 Loan. Point(s) Refinanced Debt Portion of existing debt that would have been eligible for 504 loan financing at the time of original financing can be refinanced in a current project. Project expenses, other than land purchase, incurred within nine months prior to receipt by SBA of a complete loan package can be included in the Project. The SBA may extend or waive the period of time for good cause. d:\106748592.doc 3 of 3