Healy FY11 PMA CLIN 0004 CONDITION FOUND REPORT Todd Project No. 4015 Project CFR No. Craft CFR No. 4015-057 Activity No. CIR-006 58901 Component or Location: Definite No. / Option No. D-45 3.2.1 Drawing No. As Listed CFR Title: Paragraph No. N/A Allied System Crane Reports Statement of Condition Found: After performing initial operational test and inspection allied crane reports and TODD sheave inspections are attached below: Port Knuckle Crane, Serial #1867 Bow Crane, Serial #1868 Condition Found Report 1867 Healy.xls Condition Found 4209_001.pdf Report 1868 Healy Bow Crane.xls 4206_001.pdf Port 04 Deck Crane, Serial #1869 Stbd 04 Deck Crane, Serial #1870 Condition Found Report 1869 Healy.xls Condition Found Report 1870 Healy.xls 4207_001.pdf 4227_001.pdf Stbd Knuckle Crane, Serial #1871 Condition Found Report 1871 Healy.xls 4208_001.pdf Recommended Action: Below recommendations based on Allied reports attached above, item numbers correspond to associated report: Port Knuckle Crane, Serial #1867 2.0, 3.4: Troubleshoot and repair overhead cab fan and slewing horn 2.3: Corrected by USCG, no further action required. 4.6: Corrected by USCG, no further action required. 5.0: Replace missing and rusted pedestal access cover bolts. 6.1: Repair/replace mechanical boom angle indicator 8.1: Repair small oil leak at HPU diverter manifold 4.2.1, 4.2.2, 5.1, 6.3, 8.1.1, 8.1.2: Recommend annual oil and filter change, not currently in spec. TODD PACIFIC SHIPYARDS COPORATION Page 1 of 3 12-Feb-16 Bow Crane, Serial #1868 1.0, 1.2: Prep, prime and paint rust affected areas on exterior surfaces of crane 2.0, 2.2: Troubleshoot and repair cause of HPU failure alarm 3.0, 3.2: Dry out swivel enclosure, conduct megger testing of all wires to verify condition for further use. 2.3, 2.3.3, 3.4: Troubleshoot and repair crane cab heater, crane horn and slewing horn 2.3.1: Properly mount cab transformer. 2.3.2: Repair/replace rusted and inoperable crane door latch 3.5, 7.0: Troubleshoot and repair LMI cable reel and unit. 4.0: Repair oil leak inside turret at tube fitting 4.2, 4.4, 8.1: Replace broken HPU return filter gauge on top of tank. 5.0: Identify cause of excessive water in pedestal and provide repair recommendation. 7.6: Repair or replace emergency lowering manifold with Allied developed kit. 4.2.1, 4.2.2, 4.5, 5.1, 6.3, 8.1.1 thru 9.0: Recommend annual oil and filter change, not currently in spec. Note: OEM recommends discontinue use of crane until electrical swivel has been dried and tested by electrician; and transformer in cab electrical box is securely mounted. Port 04 Deck Crane, Serial #1869 1.0, 1.2: Prep, prime and paint rust affected areas on exterior surfaces of crane 3.3: Troubleshoot and repair inoperable boom tip floodlight. 7.6: Repair or replace emergency lowering manifold with Allied developed kit. 8.1: Repair minor oil leak at HPU pump inlet 4.2.1, 4.2.2, 6.3, 8.1.1, 8.1.2: Recommend annual oil and filter change, not currently in spec. Stbd 04 Deck Crane, Serial #1870 1.0: Prep, prime and paint rust affected areas on exterior surfaces of crane 2.3, 2.3.1: Purchase and install cab fan 3.0: No action required, submitted for documentation. 4.0, 6.0: Repair oil leak at top of hydraulic swivel in turret. 4.1: Replace missing pump coupling guard 6.2.2: Replace fast line haul ball safety catch 7.6: Repair or replace emergency lowering manifold with Allied developed kit 8.1: Repair or replace electrical box in HPU enclosure. 5.1, 8.1.1, 8.1.2, 8.2.1: Recommend annual oil and filter change, not currently in spec Note: OEM recommends discontinue use of crane until oil leak and safety catch are repaired. Stbd Knuckle Crane, Serial #1871 1.0: Prep, prime and paint rust affected areas on exterior surfaces of crane 2.0, 2.2, 3.3, 3.4: Troubleshoot and repair slewing horn and cab mounted floodlight inoperability. 3.0: Corrected by USCG, no further action required. 4.6: Repair oil leak at right lifting cylinder counterbalance valve. 7.6: Repair or replace emergency lowering manifold with Allied developed kit 8.1: Repair or replace electrical box in HPU enclosure. 5.1, 8.1.1, 8.1.2, 8.2.1: Recommend annual oil and filter change, not currently in spec PC Note: Part availability and lead time for materials is unknown at this time; repairs may extend beyond the current end date. Pricing available upon request Required Report TODD PACIFIC SHIPYARDS COPORATION Page 2 of 3 12-Feb-16 Prepared By: Ship Manager: K Guinn Name Response Requested By: 263 L. Saisslin 2/10/11 2/14/11 Phone Ext Name Date Date Work Request (WR) Information: Expiration Date of Cost & Schd. Data Above WR No. WR Agreed Price Does this CFR require a WR ( Yes / No ):__ _Yes __ Date of WR Execution Signature for CG Signature for Todd Customer’s Reply: Rcvd: 2/10/11. Report reviewed and accepted. Request WR-025 proposal to correct the following deficiencies to the Bow Crane: 1) 2.0, 2.2: Troubleshoot and repair cause of HPU failure alarm. 2) 3.0, 3.2: Dry out swivel enclosure, conduct megger testing of all wires to verify condition for further use. 3) 2.3, 2.3.3, 3.4: Troubleshoot and repair crane cab heater, crane horn and slewing horn 4) 2.3.1: Properly mount cab transformer. All other crane discrepancies are noted. No further action is requested. Customer Signature & Date David Socci, LCDR, USCG, COTR TODD PACIFIC SHIPYARDS COPORATION Page 3 of 3 2/11/11 12-Feb-16