SCOPE OF WORK
The Santa Clara County Office of Education (SCCOE) requires the installation of 12-strand multi-mode
fiber connections between the new Data Center Main Distribution Frame (MDF) and six (6) Intermediate
Distribution Frame (IDF) closets.
New fiber installation and termination in IDFs can be scheduled from the date bid is awarded with
termination in MDF to occur during the final stages of Data Center construction. Exact schedule for
access to the Data Center will be provided but will occur on/around October 17, 2014.
Upon completion of the new Data Center, existing fiber cables shall be “pulled-back” from exiting MDF,
and then re-tested and re-terminated (as required) in the new MDF. Contract for Time and Materials will
be negotiated after this bid is awarded.
Please provide quotes for the following options:
OPTION A: 12-strand plenum fiber-optic cable per specifications in Section 2.1.2.
Option A-1: 12-strand plenum fiber-optic cable installation and termination.
Option A-2: Pull an additional 12-strand plenum fiber-optic cable. Installed but not
terminated to be held for future use.
OPTION B: Armored 12-strand plenum fiber-optic cable per specifications in Section 2.1.3.
Option B-1: Armored 12-strand plenum fiber-optic cable installation and termination.
Option B-2: Pull an additional armored 12-strand plenum fiber-optic cable. Installed but not
terminated to be held for future use.
TECHNICAL SPECIFICATIONS FOR THE INSTALLATION OF FIBER-OPTIC CABLE
1.0 INTRODUCTION
SCCOE Information System Center (ISC) currently specifies the installation of 12-strand 50/125 micron
multimode fiber-optic cable to support data communication services on the SCCOE campus.
The following specifications for the selection and installation of fiber-optic cable and associated
hardware are intended to ensure a reliable and consistent fiber-optic infrastructure for the SCCOE. All
fiber-optic cabling and components must meet or exceed the specifications of ANSI/TIA-568C standards
and should be installed in accordance with their listings and manufacturers’ instruction.
2.0 FIBER CABLE SPECIFICATIONS
Fiber-optic cabling installed must meet or exceed the following specifications:
2.1 Multimode Fiber
Installed cable shall be 12-strand OM4 multimode 50/125micron core/cladding 850nm laser-optimized
10-Gigabit rated. (TIA-492AAAC) (OM4)
2.1.1 Performance Specifications
Multimode fiber cable shall be capable of transmitting at 10G up to 300 meters at 500/2000
MHz/KM modal bandwidth.
Wavelength (nm) Maximum Attenuation (dB/km) Minimum Bandwidth
850
3.5 dB/km
1500 MHz
1300
1.5 dB/km
500MHz
2.1.2 Plenum Cable Construction - Indoor Distribution (see OPTION A)
Plenum rated cable shall be used for all interior installations. Installed cable shall meet or exceed the
following specifications:
a. Tight buffered 900 um, mechanically strippable
b. Color coded to EIA/TIA -598 color coding standard to facilitate individual fiber
identification.
c. Aramid yarn strength member capable of supporting a maximum short-term tensile load
of 400 lb. without stretching
2.1.3 Armored Plenum Cable Construction - Indoor/Outdoor Distribution (see OPTION B)
Armored plenum rated cable shall be used for all interior installations. Installed cable shall meet or
exceed the following specifications:
a. Tight buffered 900 um, mechanically strippable
b. Color coded to EIA/TIA -598 color coding standard to facilitate individual fiber
identification.
c. Tensile strength elements/armoring capable of supporting a maximum short-term
tensile load of 400 lb. without stretching
2.1.4 Approved Manufacturers/Suppliers
1) Ortronics
2) Corning
3) Berk-Tek
4) Products of equal quality from other manufactures will be considered.
5) All cable installed must be approved by project manager prior to installation.
3.0 FIBER INSTALLATION
3.1 Inter-Building Cable
Fiber cable is to be supported by 4-inch “J” hooks every six (6) feet throughout the run.
3.2 Miscellaneous
At each end of the fiber run a twenty (20) foot service loop shall be left to facilitate future relocation.
Slack shall be mounted on walls or on ladder racks at the contractor’s discretion with the project
manager’s approval.
4.0 FIBER TERMINATION
The terminal ends of all new fibers cable strands shall be terminated on the fiber trunk cable.
Fiber termination and components must meet or exceed the following specifications:
4.1 Fiber Termination Shelves
Each of the six (6) IDF closet installations shall include a new 1U rack-mountable fiber termination shelf
that shall accommodate 12-strand fiber terminations. The MDF installation shall include an appropriate
number of shelves to accommodate all new IDF terminations.
4.1.1 Fiber Shelf Specification
Fiber termination shelves shall meet the following specifications:
a. rack mountable 1U or 4U
b. fully modular in design
c. provide security and protection
d. be accessible from both front and rear
e. capable of terminating buffered fiber-optic cable
f. provide adequate strain relief for cables
4.1.2 Approved Manufacturers/Suppliers
1) Ortronics
a. OR-FC01U-M
b. OR-FC04U-M
2) Leviton
3) Products of equal quality from other manufacturers will be considered.
4.2 Modular Fiber Cassettes
Modular fiber cassettes shall mount into the fiber patch panel and shall be high-density MPO on the rear
of the module with twelve (12) LC connectors on the front.
4.2.1 Approved Manufacturers/Suppliers
1) Ortronics
a. OR-M4LCQ24-50E
2) Leviton
3) Products of equal quality from other manufacturers will be considered.
4.3 Labeling of Fiber Terminations
Each fiber shelf shall be labeled with a machine-made label using black type on a white background.
MDF labels shall identify each of the IDF connections. Fiber trays shall be labeled on the face plate with
the location identifier of the cables it contains. Each fiber-optic strand shall be labeled with a unique
number at the LC connector.
5.0 TESTING
5.1 Before Installation
It is suggested that each individual fiber in a cable be tested for length and transmission anomalies while
on the reel before installation.
5.2 After Installation and termination
5.2.1. All multimode fiber strands shall be tested end-to-end for bi-directional attenuation at
850 nm/1300 nm. Tests should be conducted in compliance with EIA/TIA-526-14 or according to
the manufacturer’s instructions for the test set being utilized.
5.2.2. After the cable is in place it shall be tested in the following manner:
a. After termination, each fiber shall be tested for length, transmission anomalies, and
end-to-end attenuation. Results are to be supplied to ISC.
b. After termination and mounting, each terminated fiber is to be tested for end-to-end
loss. Results are to be supplied to ISC.
c. The maximum allowable attenuation for any termination is 0.3 dB.
5.2.3. The contractor shall review all terminated connectors with a fiber inspection
scope following the final polish. Connector ends with any anomalies, scratches or pitting shall
be re-polished or replaced to remove the defects.
Any deviation from these test procedures must be approved in writing in advance by ISC.
Questions regarding means, methods, or materials or should be directed to project manager
Monica Dvorsky 408-453-4308 or Evan Lloyd 408-453-6624.
SITE ACCESS
The site will be available for work from Monday through Friday from 7:00 a.m. – 6:00 p.m.
Weekend access by arrangement.
END OF SECTION