Application for support

advertisement
Application Form
LWARB Borough Communication Support Programme
Please fill in all sections of this form.
All applications for Borough Communications Support must be
received by 5pm 30 June 2014.
Send your applications to ella.clarke@wrap.org.uk
All applications will be acknowledged within 5 working days.
Final funding decisions will be made before 31 July 2014.
1. Authority information
Borough Name (or Lead Borough in a
partnership):
Officer Name (contact for application):
Position held:
Address:
Direct line telephone number:
Mobile number:
Email:
2. About your Borough
To help scope potential BCS projects quickly, we need to have an understanding about your
Boroughs services and performance. Please therefore provide as much information as
possible in this section.
Please provide a brief
description of your waste
and recycling collection
services (both kerbside
and estates). Please
include materials
collected, collection
frequency, containment,
Please provide an
overview of your wider
waste & recycling services
including HWRCS, Bulky
waste collections and
bring sties. Include
number of sites, materials
collected etc.
Overall recycling rate
Dry Recycling:
Organics:
Do you have any internal
targets for recycling?
Please provide detail.
Cost per tonne for disposal
of residual waste:
Cost per tonne for
recycling:
Contamination rates:
2012/13 :
2013/14 :
3. Proposed Scheme for BCS Funding
3.1 Please briefly describe your project, including
a) What service are you focusing on (e.g., kerbside dry recycling, estates dry recycling,
food waste etc.).
b) what you are trying to achieve/what problem you are trying to address.
c) a brief outline of what communications you think are required.
3.2. Please provide a description of how you plan to evaluate the tonnage diversion that
occurs as a result of your project:
3.3 Baseline data will be required to help set tonnage objectives for your project and to
monitor impact.
Please provide an indication of the increase
in tonnage you expect to collect as a result of
your project:
Please provide a brief explanation of your calculations and baseline data to support.
Note: a template for recording baseline data is available from the BCS team. Please
email ella.clarke@wrap.org.uk for more details
4. Planning your project
Does your project require member approval?
Yes/No
If yes, do you have approval?
Have you engaged your communications
team?
Yes/No
Yes/No
Are they supportive?
All projects are required to be delivered by
December 2014. Can you please confirm
that you will be able to meet this deadline?
Yes/No
Yes/No
5. Supporting information
Are you able to provide any of the following in support of your application? If so, please tell
us how current the information is. If the information is relevant to your application (for
example as baseline information), please submit it with this application form.
Participation Data
Waste composition analysis
Capture rated for dry recycling/food waste
Estates specific dry recycling/food waste
collection data
Attitudinal data e.g. customer satisfaction
surveys
Is there any other information that is relevant to your potential project? Consider service
changes, round data, contamination etc. Please record any information below:
Download