COMPLIANCE REPORT OF OMAXE SPA VILLAGE AT SECTOR -78,
FARIDABAD, HARYANA.
PART A-SPECIFIC CONDITIONS:
Construction Phase:(i)
(ii)
(iii)
(iv)
(v)
(vi)
The Project proponent will seek the
permission of CGWA for abstraction
of Ground Water before the start of
Construction.
A first aid room as proposed in the
project report will be provided in both
during construction and operation of
the project.
Adequate drinking water and sanitary
facilities should be provided for
construction workers at the site.
Provision should be made for mobile
toilets. Open desiccation by the
labourers strictly prohibited. The safe
disposal of waste water and solid
wastes
generated
during
the
construction
phase
should
be
ensured.
All the top soil excavated during the
construction activities should be
stored for use in horticulture /
landscape development within the
project site.
Disposal of muck during construction
phase should not create any adverse
effect
on
the
neighboring
communities and be disposed taking
the necessary precaution for general
safety and health aspects of the
people , only in approved sites with
the approval of competent authority.
Construction spoils , including
bituminous material and other
hazardous materials , must not be
allowed to contaminate watercourses
and the dump sites for such material
must be secured so that they should
not leach into the ground water and
We have already received NOC
from Central Ground Water
Authority and a copy of the same
has been send to your office..
A first Aid room has been provided
both during construction and
would
be
provided
during
operation of the project.
Adequate drinking water and
sanitary facilities are provided for
construction workers at the site.
The waste water and the solid
waste generated during the
construction
phase
being
disposed off as per the norms.
The top soil excavated during
construction activities has been
stored at one place and shall be
used
for
development
of
horticulture / landscape within the
project site.
Muck including other construction
waste
during
construction
activities being disposed off such
that they have no adverse effect
on the neighboring communities
and special precautions are taken
for general safety and health
aspects.
Construction
spoils
including
bituminous materials stored away
from the surface water and are
stored on plastic sheet to prevent
leaks and spills and are not
allowed to contaminate water
courses , and also it is assured
(vii)
(viii)
(ix)
(xi)
(xii)
(xiii)
(xiv)
any hazardous waste generated
during construction phase , should be
disposed off as per applicable rules
and norms with necessary approvals
of the Haryana State Pollution
Control Board.
The diesel generator sets used
during construction phase should be
low sulphar diesel type and should
conform to Environment (Protection )
Rules prescribed for Air and Noise
emission standards.
that they do not leach into ground
water.
The D.G. Sets are used as power
back-up. The low sulphar diesel is
used as fuel in order to reduce the
pollution load. The D.G Sets are
acoustically
enclosed
and
conforms to the rules made under
Environment (Protection) Act,1986
prescribed for Air and Noise.
The diesel required for operating DG It shall be done.
Sets shall be stored in underground
tanks and if required , clearance from
chief controller of Explosives shall be
taken.
Ambient noise level should conform Ambient noise level conform to
to residential standards both during residential standards both during
day and night . Incremental pollution day and night and it will be
loads on the ambient air and noise maintained during the construction
quality should be closely monitored phase..
Latest
reports
are
during construction phase , so as to enclosed for your ready reference.
conform to the stipulated standards.
Fly ash should be used as building Fly Ash being used through Ready
material in the construction as per the Mix Plants in which Fly Ash is
provisions of Fly Ash Notification of being used as one of the
September , 1999 and amended as ingredients of Concrete.
on 27th August,2003.
Ready mixed concrete must be used Ready mixed concrete is being
in building construction .
used for construction in order to
reduce the water demand.
Storm water control and its refuse as Storm water Control and its reuse
per CGWB and BIS standards for shall be as per CGWB and BIS
various application.
standards.
Water demand during construction Pre mixed concrete and other best
should be reduced by use of pre- practices are involved during the
mixed concrete , curing agents and construction in order to reduce the
other best practices referred .
water demand and it also
conserves the natural resources.
Permission from competent authority We have already received NOC
for supply of water shall be obtained from CGWA and the copy of the
prior to construction / operation of the same is already sent to you.
project.
(xv)
Roof should meet prescriptive
requirement
as
per
Energy
Conservation Building Code by using
appropriate
thermal
insulation
material to fulfill requirement.
Roof designing are as per Energy
Conservation
Building
Code
Standards
and
appropriate
thermal insulation materials shall
be used in order to conserve
energy.
(xvi) Opaque wall should meet the It shall be done as per the norms
prescriptive requirement as per of the Energy Conservation
Energy Conservation Building Code Building Code.
which is proposed to be mandatory
for all air conditioned spaces by use
of appropriate thermal insulation
material to fulfill requirement.
(xvii) The approval of the competent It shall be done.
authority shall be obtained for
structural safety of the building due to
earthquake , adequacy of fire fighting
equipments etc, as per National
Building Code including protection
measures from lightening etc. If any
forest
land is involved in the
proposed site , clearance under
Forest Conservation Act shall be
taken from Competent Authority.
PART-B GENERAL CONDITIONS:(I)
(ii)
(iii)
(iv)
(v)
The Environmental safeguards contained in
the EIA / EMP Report should be implemented
in letter and spirit.
Six monthly compliance report should be
submitted to the HSPCB and Regional office ,
MOEF, GOI, Northern Region, Chandigarh.
The project proponent will sent one copy of the
EMP Report to Additional Director, Regional
Office , MOEF, GOI, Sector-31, Chandigarh
and to the Chairman, Haryana State Pollution
Control Board, Panchkula for their reference.
The SEIAA, Haryana reserves the right to add
additional Safeguard measures subsequently,
if found necessary . Environmental Clearance
granted will be revoked if it is found that false
information has been given for getting approval
of this project.
All other statutory clearance such as the
It is being done.
It shall be done.
It shall be done.
All
Environmental
safeguards
shall
be
followed by the project
proponent both during
construction
and
operation of the project.
NOC from Civil Aviation
approvals for storage of diesel from chief
controller of Explosives, Fire Department , Civil
Aviation Department , Forest conservation Act,
1972 etc. shall be obtained, as applicable by
project proponents from the respective
authorities before the operationallization
of
the project.
(vi) These stipulations would be enforced among
others under the provisions of Water
(Prevention and Control of pollution) Act,1974 ,
the Air (Prevention and control of pollution )Act,
1981, the Environment (Protection )_Act, 1986,
the public Liability (Insurance )Act, 1991 and
EIA Notification, 2006.
(vii) The project proponent will not violate any
judicial orders / pronouncements issued by the
Hon”ble Supreme Court / High Courts.
Department has already
been sent to your office.
A copy of Environmental
Clearance & consent to
establish
is
made
available at site office..
Agreed.