Section III – Bid Data Sheet

advertisement
Section III – Bid Data Sheet
ITB
Clause
1.1
The PROCURING ENTITY is Department of Public Works and Highways, Quezon 1st
District Engineering Office, Brgy. Abang, Lucban, Quezon
The name of the Contractor is
The Identification number of the Contract is 15DK0092-Construction/Rehabilitation of Flood
Mitigation Facilities along Major River Basins, Agos River Basin, Infanta, Quezon
2
The Funding Source is: CY-2015 DPWH Regular Infrastructure Program
in the total amount of –Php14,900,306.38
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins, Agos
River Basin, Infanta, Quezon
Net length – Construction of Flood Control Facilities-(Gabions, Embankment-508 LM)
Contract ID No. 15DK0092
3.1
5.1
5.2
5.4
No further instructions.
No further instructions.
Bidding is restricted to eligible bidders as defined in ITB Clause 5.1.
The Bidder must have completed a single contract that is similar to this Project, equivalent to
at least fifty percent (50%) of the ABC. For this purpose, similar contracts shall refer to
FHN-Flood Control/ Hydraulics/Drainage
8.1
8.2
9.1
No further instructions.
Not applicable
The Procuring Entity will hold a Pre- Bid Conference for this Project on August 20, 2015
@ 10:00A.M.at DPWH, Quezon 1st District Engineering Office, Brgy. Abang, Lucban,
Quezon
10.1
The Procuring Entity’s (DPWH) address is:
DPWH, Quezon 1st District Engineering Office,
10.3
12.1
Brgy. Abang, Lucban, Quezon
Tel. No. (042) 540- 6097
No further instructions.
The first envelope shall contain the eligibility and technical documents stated in the ITB
Clause. However, if the Bidder maintains a current and updated file to its Class “A”
Documents with the Procuring Entity, an updated Contractor’s Registration Certificate/
Contractor’s Information (CRC/ CI) may be submitted in lieu of the Class “A” Documents;
otherwise, it shall submit an application for eligibility and its latest Class “A” Documents five
(5) days prior to submission of bid. Any application for eligibility or updates submitted after
the deadline shall not be considered for the bidding at hand.
12.1(a) (i)
No other acceptable proof of registration is recognized.
12.1(a) (iv)
No further instructions.
12.1(b)(ii)
(ii.2)
Personnel Capabilities
The Key personnel should meet the following number of years’ work experience.
1) Project Manager
1
Total
Experience
(years)
5
2) Project Engineer
1
5
3
3) Accredited Materials Engineer 1
1
-
-
Position
No. of
Personnel
Same Position
in Similar
Works (years)
3
4) Construction Foreman
1
5
3
1. Total Experience “means total years of civil works experience (of any nature in
construction and engineering consultancy services”.
12.1(b)(ii)
(ii.3)
13.1
2.
Except for the Accredited Materials Engineer I, “Same Position in Similar Works” covers
overall work experience for the designated position in similar concrete road construction.
3.
For the Accredited Materials Engineer I,“Same Position in Similar Works” covers overall
work experience for the designated position in any engineering work.
Minimum Plant/ Equipment Requirements
Backhoe (wheel type) Motorized Road Grader, Vibratory Roller, Water Truck, Cargo Truck,
Backhoe (0.80 cum)
(Please see attached Minimum Equipment Requirement)
The Financial Component shall include:
Bid Form
Form of Contract Agreement
Bid Prices in the Bill of Quantities
Quarterly/ Monthly Cash Flow and Payment Schedule
13.1(b)
Detailed Estimates including Summary Sheets indicating the unit prices of construction
materials, labor rates and equipment rental used in coming up with the bid/proposal.
The ABC is in the amount of Php14,900,306.38
Any bid with a financial component exceeding the amount of the respective sub- projects shall
not be accepted.
14.2
No further instructions.
15.4
No further instructions.
16.1
The bid prices shall be quoted in Philippine Pesos.
17.1
Bids and bid securities will be valid within 120 calendars days from the opening of bids.
18.1
The Bid Security shall be limited to Bid Securing Declaration or at least one (1) other form
in accordance with the following amount:
1. Php 298,010.00 [2% of ABC], if bid security is in cash, cashier’s/ manager check, bank
draft/guarantee or irrevocable letter of credit issued by a Universal or Commercial Bank;
18.2
Bid Security shall be valid until the validity of bid.
20.3
Each Bidder shall submit One (1) original and Two (2) copies of the first and second
components of its bid
21
The address for submission of bid is:
The BAC Chairman
DPWH, Quezon 1st District Engineering Office
Brgy. Abang, Lucban, Quezon
The deadline for submission of bid is September 03, 2015 at 2:00 PM
24.1
The place of bid opening is:
DPWH, Quezon 1st District Engineering Office
Brgy. Abang, Lucban, Quezon
The date and time of bid opening is September 03, 2015 @ 2:00 P.M., immediately after the
deadline for submission of bids
24.2
27.3(b)
27.4
No further instructions.
Bid modification is not allowed.
No further instructions.
27.5
No further instructions.
28.2
Bidders have option to submit manually filed tax returns or tax returns filed through the
Electronic Filing and Payments System (EFPS). Note: The latest income and business tax
returns are those within the last six (6) months preceding the date of bid submission.
28.2(d)
[List licenses and permits relevant to the Project and the corresponding law requiring it]
31.4(g)
Additional contract documents relevant to the Project may be required by existing laws and/
or Procuring Entity, such as Construction schedule and S-curve, PERT-CPM Diagram,
Equipment and Manpower Utilization Schedule, Construction Safety and Health Program
approved by the DOLE, and Contractor’s All Risk Insurance.
32.2
The performance security shall be in the following amount:
1. ____________ [10% of Total Contract Price], if performance security is in cash,
cashier’s/ manager’s check, bank draft/ guarantee or irrevocable letter of credit;
2. ____________ [30% of Total Contract Price], if performance security is in Surety Bond;
or
3. Any combination of the foregoing proportionate to the share of form with respect to total
amount security.