Name: ___________________________ #: _________ Please turn this in with your project. HOLES FINAL PROJECT Assignment: Choose one of the projects listed as a conclusion to our read of Holes. I have included numerous choices for you to pick from, so pick an activity that play to your strengths! Due Date: This project is due on Monday, October 21 Grading: You will be graded on the following: neatness, completion of task, spelling/grammar, and thoroughness of answer. You may type any of the activities instead of handwriting them, but illustrations must be hand drawn. (Effort will be taken into account, not your artistic abilities). * USE YOUR CLASS TIME WISELY. YOU HAVE TWO DAYS OF SHARED READING AND YOU CAN USE YOUR INDEPENDENT READING TIME DURING OUR GUIDED READING BLOCK TO WORK ON THIS PROJECT. PROJECT OPTIONS 1) Write 3 paragraphs telling what the main character might be doing ten years in the future. Illustrate your paragraphs. 2) Write 10 open-ended questions for one of the characters. Then answer the questions as if you were the character. 3) Write a new ending for the book. It should be at least 3 paragraphs long. Illustrate your ending. 4) Pretend you are going to write a sequel to this book. Write 3 paragraphs that summarize the plot of the sequel. Illustrate your paragraphs. 5) Draw and color pictures of at least 5 important objects from your book. Then write 3-4 sentences for each object, explaining why it is important to the story. 6) Pretend you are going to give a character a gift- something he or she would really like. Draw a picture of the gift and write 3 paragraphs explaining why the character would like the gift. Holes Project Rubric Project Due Date Layout and Neatness Completion of Task Spelling and Grammar Thoroughness of Answer Points: _________ Grade: _________ Comments: 1 2 The project was The project was more than two two days late. days late. This project is This project is slightly somewhat attractive. Little attractive. Some time and care time and care was was put into the put into the assembly of this assembly of this project. project. The task was completed, but the This project is writing and incomplete. illustrations are short or incomplete. There were There were 3 more than 3 spelling or spelling or grammar grammar mistakes. mistakes. This project included general ideas from the text. This project included some specific details from the text. 3 4 The project was one day late. The project was on time. This project is mostly attractive. Time and care was put into the assembly of this project. This project is attractive. Time and care was clearly put into the assembly of this project. Met the length Met the length requirement for requirement for writing OR writing, and included all of the included all of the illustrations. illustrations. There were 2 spelling or grammar mistakes. There was one or none spelling or grammar mistakes. This project included specific details from the text. This project included quotes and specific details from the text.