PASSPORT investment project 1 2 3 4 4.1 4.2 4.3 4.4 4.5 Full name of the project Location of the Branch, code NACE Construction enterprises producing construction materials Municipality of Armavir Manufacturing 26.61 General information about the project It is supposed to build a modern plant for the production of building materials - concrete and concrete products. P laniruemy output - about 200 thousand m ³ per year. the The main buyers of enterprises will be developers. Brief description of project Design capacity Description of consumer market Construction of the project Competitive advantages 1 year Competitive advantages designed plant include the following: o o o o o high quality products. large capacities. environmental safety of products. duration term Service let production. full flammability and radiation safety, with a huge temperature range applications. o chemical resistance, and flame resistance. o uniform, used in the production, raw materials allows to produce consistently high quality products. o convenient access to the grounds of the proposed venture. 4.6 5 5.1 5.2 5.3 5.4 Availability of resources for project Ready-mixed concrete, she mixed concrete - rolling stock of the four main components are mixed in a certain proportion of cement, gravel, sand, water. Major manufacturers and suppliers of cement in the region: JSC "Novoroscement" Circassian Cement Plant, JSC "Kavkazcement." Ensuring inert materials (sand and gravel) in the amounts needed to cover the projected needs of the enterprise, will be at the expense of supplies from quarries located near an undertaking, through purchases in the 'open market. " Planned volume of resource consumption (annual) Electricity, MW 350 Gas, million cubic 0 meters. Water, million cubic 0,038 meters. The degree of Developed a business plan, the ground area. development of the project: 6 6.1 Financial evaluation of the project 204.165 The total cost of the project, mln.: including 6.1.1 Own funds, mln.: 204.165 6.1.2 The district (municipal) budget, mln.: 6.1.3 Previously raised funds, mln.: 6.2 The need for investment, 204.165 mln.: 6.3 Forms of investment Direct investment (investment projects and grounds) 6.4 Form of return on Money investment: 6.5 Payback period: 5 years 7 Key indicators of economic efficiency of the investment project 7.1 Net present value (NPV), 137.64 mln. 7.2 Simple payback period, 2.25 years 7.3 Discounted payback 2.75 period, years 7.3 Internal Rate of Return 69.9% (IRR) 7.4 Profitability Index (PI) 1.6 7.5 Gross revenue, mln. per 889.3 year 8 Social efficiency investment project 8.1 The number of jobs 112 8.2 Average wage (thousand 396 rubles. Per year) 9 Budget efficiency investment project 9.1 The average annual 91.13 amount of tax payments, mln. 9.2 including the 36,61 consolidated budget of the region, mln. rub. 10 Basic information about the land plot 10.1 Location of the site Armavir, st. highway, 57 10.2 Cadastral registration of Not registered land 10.3 Cadastral parcel number / 23:38 01 11 014 quarter 10.4 Plot area (m 2) 13 0000 10.5 The maximum size of the 13 0000 10.6 10.7 10.8 10.9 area (m 2) Category of land Permitted use Actual use Existing buildings and structures Urban planning 10.10 documentation 11 11.1 11.2 11.3 12 12.1 12.2 13 13.1 13.2 Land settlements Production and utilities class IV-V on health hazard classification of enterprises Plot is undeveloped Plot is undeveloped - P Rules when land use and development approved by Decision of the Armavir City Duma "On approval of land use and development of the municipal formation Armavir" from 29.07.2010, № 70. - General layout of Armavir city limits with a project approved by the decision of Armavir City Duma Number 664 from 18.02.2010. Information about the proprietor (legal owner) of land Owner State ownership Rightholder Municipal Administration Armavir Type of law State ownership rights to the division Information about the burdens View encumbrances, No restrictions Area of burden Characteristics of existing engineering infrastructure Type of infrastructure Index Value Note Electric power Center name, Of "K-NES supply Power owner Armavirelektroseti power." voltage Average class free 2 capacity (MW) Distance 0 (m) The mains 10 closest voltage, kV connection Distance 0 point (m) Gas supply Gas name, JSC "Armavirgorgas" pipeline owner Diameter 100 (mm) Pressure 0.6 (MPa) bandwidth 3576458 (cubic meters per year) Distance 100 (m) 13.3 13.4 13.5 13.6 14 14.1 14.2 The Diameter 100 closest (mm) connection Pressure 0.6 point (MPa) bandwidth 3576458 (cubic m. annually) Distance 100 (m) Water supply Water Name, GUP KK NE WUC supply owner "Kurganinsky group source plumbing" power 100 (kub.m.vsut.) water Drinking quality Distance 0 (m) The power 100 closest (kub.m.vsut.) connection Diameter 150 point (mm) Distance 0 (m) Sewerage Type Name, GUP KK NE WUC structures owner "Kurganinsky group water conduit" power 100 (kub.m.vsut.) Distance 0 (m) The power 100 closest (kub.m.vsut.) connection Diameter 200 point (mm) Distance 0 (m) Telephones / Central Distance 150 Internet network (m) Mobile Distance 0 telephony (m) Cost of maintenance of 0.1 engineering infrastructure, mln. Rub. Distance to major settlements and transport infrastructure Distance from Title Distance (km) Municipality center Central part of 5.2 Armavir nearest settlement City 16 14.3 14.4 14.5 14.6 14.7 14.8 14.9 15 15.1 15.2 15.3 16 16.1 16.2 Novokubansk city and Krasnodar Krasnodar 250 highway (regional, FAD 7,807 federal) "Caucasus" local roads "Entrance to 1,984 Armavir" The nearest railway F \ d Art. 5, 41 4,082 station "Armavir-1" F / A Art. "Armavir-2 nearest railway 0,125 Airport Airport 200 Krasnodar Seaport Novorossiysk 360 Additional information about the land Special conditions Land subsidence column with a capacity more than 5m. Loam top gorizonta1-7 m, subsurface 3-10m, underlain by gravel-pebble deposits with sand filling. Seismicity of 7 points, wind direction: North-East. Cost of rent / buy the land, mln. 6.2 / 53.5 Rub. Coordinates (longitude, latitude) 45.023967 41.099113 Notes Plots are available from the auction, the cost of rent is calculated at market value. Contact details Information about the initiator Name: Administration of Armavir of the project Mailing address: 352900, Krasnodar, Armavir, st. (In case there is information Karl Liebknecht, 52 on legal / natural person): Website: www.armawir.ru Phone / Fax: 8-86137 - 4-30-12; 2-74-70; E-mail: info@armawir.ru Information about the Name: Administration of Armavir applicant Mailing address: 352900, Krasnodar, Armavir, st. (Executive Edge / local Karl Liebknecht, 52 authority) Website: www.armawir.ru Phone / Fax: 8-86137 - 4-30-12; 2-74-70; E-mail: info@armawir.ru Acting deputy head of the municipal formation Armavir April 15, 2014 N.Yu.Maslova