I.
Why Energy Efficiency?
II.
Performing Energy Audit
III.
Putting in practice Energy Audit recommendations
IV.
Outcomes
V.
Next steps
National Water Supply and Sanitation
Project (NWSSP)
Urban Component:
Balți, Cahul, Orhei,
Floresti, Ungheni,
Causeni.
Rural Component:
Valeni, Colibasi,
Sarata-Noua,
Bestemac, Pirita,
Dubasarii Vechi,
Navirnet, Sanatauca,
Zahorna.
NWSSP Components:
Total Project Value:
II: Rehabilitation
of rural WS
networks
USD 3,2 mln
USD 12,8 mln.
World Bank loan
I: Rehabilitation
of urban WSS
networks
USD 7,3 mln.
Implementation
Period:
FY 2009- 2013
4
III: Institutional
Capacity in the
water sector
USD 1,2 mln
IV: Energy Efficiency
in 6 cities
USD 1,1 mln
Why Energy Efficiency?
5

WU use old and energy intensive equipment

Electricity consumption reaches over 28-35% of
WU’s Operational Costs

Moldova is a Net Importer of energy from
unstable markets
Main stages:
6
Contract
duration
Budget,
(USD)
Weigh,
(%)
Energy Audit
6 months
230.000
21
Implementation
18 months
870.000
79
1.100.000
100
Total:
Methodology under Energy Audit:
7

Flow measurements at all water sources, all
water and sewage pumping stations.

Outflow measurements of individual water
and sewage pumps

Energy consumption of individual pumps and
air blower

Team used pressure measurements
equipment in order to evaluate actual
performance of pumps and pressure piping

Acoustic leak detection using correlator has
been performed
8
Consultant prepared the
following submittals, (Dec, 2011):

9
BoQ and Cost estimate for Goods, Works and
associated services

Technical Specifications for Goods and Works
within proposed Energy Management Program
(EMP)

EMP schedule of implementation
Solutions applied in Balti
city
10
11
Outcomes:
Baseline
(KWh/m3)
Target
(KWh/m3)
Achieved
(KWh/m3)
Balti
1.38
0.94
0.80
Cahul
1.5
1.15
1.03
Causeni
2.87
1.50
1.42
Floresti
1.58
1.25
1.03
Ungheni
1.07
1.00
0.86
Indicator 2:
Average Electricity
Consumption
Indicator 3:
Annual electricity
consumption of
sewerage system in
Orhei
Baseline
(MWh/year)
327
Target
(MWh/year)
157
-42%
-35%
Achieved
(MWh/year)
104
-68%
Outcomes:
Electricity Consumption reduced by:
1200000
1113600
Total investment:
1,1 mln USD;
1000000
800000
Total Savings:
0,3 mln USD/year;
600000
400000
268238
186821
200000
kWh/year
12
56581
182794
78752
0
Bălți
Cahul Căușeni Florești
Orhei Ungheni
Payback period
3,7 years;
Other benefits:

Industrial productivity and competitiveness

Poverty alleviation: Water affordability and access

Reduced GHG emissions

Sustainable Natural resource management

Development goals
13
Complications:

14
WUs are still using energy intensive equipment, and obsolete
distribution system

Given limited human, and technical capacity WUs are not able
without foreign assistance to replicate Energy Efficiency

Political instability, and multiple elections (two local elections;
three parliamentary elections; one referendum)

Socially oriented tariffs inhibit development

Limited borrowing capacity of WUs and local municipalities
Next steps:
15

Further extension of energy efficiency programs

Continuous building of institutional capacity

Regional development in the water sector
THANK YOU!
Gutu Sergiu
sgutu@water.md
Download