Energy Efficiency Measures
in Moldovan Utilities
GUTU SERGIU,
MAY 08, 2014
Content:
2
I.
Why Energy Efficiency?
II.
Performing Energy Audit
III.
Putting in practice Energy Audit recommendations
IV.
Outcomes
V.
Next steps
National Water Supply and Sanitation
Project (NWSSP)
Urban Component:
Balți, Cahul, Orhei,
Floresti, Ungheni,
Causeni.
Rural Component:
Valeni, Colibasi,
Sarata-Noua,
Bestemac, Pirita,
Dubasarii Vechi,
Navirnet, Sanatauca,
Zahorna.
NWSSP Components:
Total Project Value:
II: Rehabilitation
of rural WS
networks
USD 3,2 mln
USD 12,8 mln.
World Bank loan
I: Rehabilitation
of urban WSS
networks
USD 7,3 mln.
Implementation
Period:
FY 2009- 2013
4
III: Institutional
Capacity in the
water sector
USD 1,2 mln
IV: Energy Efficiency
in 6 cities
USD 1,1 mln
Why Energy Efficiency?
5
WU use old and energy intensive equipment
Electricity consumption reaches over 28-35% of
WU’s Operational Costs
Moldova is a Net Importer of energy from
unstable markets
Main stages:
6
Contract
duration
Budget,
(USD)
Weigh,
(%)
Energy Audit
6 months
230.000
21
Implementation
18 months
870.000
79
1.100.000
100
Total:
Methodology under Energy Audit:
7
Flow measurements at all water sources, all
water and sewage pumping stations.
Outflow measurements of individual water
and sewage pumps
Energy consumption of individual pumps and
air blower
Team used pressure measurements
equipment in order to evaluate actual
performance of pumps and pressure piping
Acoustic leak detection using correlator has
been performed
8
Consultant prepared the
following submittals, (Dec, 2011):
9
BoQ and Cost estimate for Goods, Works and
associated services
Technical Specifications for Goods and Works
within proposed Energy Management Program
(EMP)
EMP schedule of implementation
Solutions applied in Balti
city
10
11
Outcomes:
Baseline
(KWh/m3)
Target
(KWh/m3)
Achieved
(KWh/m3)
Balti
1.38
0.94
0.80
Cahul
1.5
1.15
1.03
Causeni
2.87
1.50
1.42
Floresti
1.58
1.25
1.03
Ungheni
1.07
1.00
0.86
Indicator 2:
Average Electricity
Consumption
Indicator 3:
Annual electricity
consumption of
sewerage system in
Orhei
Baseline
(MWh/year)
327
Target
(MWh/year)
157
-42%
-35%
Achieved
(MWh/year)
104
-68%
Outcomes:
Electricity Consumption reduced by:
1200000
1113600
Total investment:
1,1 mln USD;
1000000
800000
Total Savings:
0,3 mln USD/year;
600000
400000
268238
186821
200000
kWh/year
12
56581
182794
78752
0
Bălți
Cahul Căușeni Florești
Orhei Ungheni
Payback period
3,7 years;
Other benefits:
Industrial productivity and competitiveness
Poverty alleviation: Water affordability and access
Reduced GHG emissions
Sustainable Natural resource management
Development goals
13
Complications:
14
WUs are still using energy intensive equipment, and obsolete
distribution system
Given limited human, and technical capacity WUs are not able
without foreign assistance to replicate Energy Efficiency
Political instability, and multiple elections (two local elections;
three parliamentary elections; one referendum)
Socially oriented tariffs inhibit development
Limited borrowing capacity of WUs and local municipalities
Next steps:
15
Further extension of energy efficiency programs
Continuous building of institutional capacity
Regional development in the water sector
THANK YOU!
Gutu Sergiu
sgutu@water.md