PASSPORT investment project 1 2 3 4 4.1 4.2 4.3 4.4 4.5 4.6 5 5.1 5.2 5.3 5.4 6 6.1 6.1.1 6.1.2 6.1.3 6.2 6.3 6.4 6.5 7 7.1 7.2 7.3 7.3 7.4 7.5 8 8.1 8.2 9 Project name Location of the Industry classification Construction of shopping complex Municipality Labinskiy district Consumer sphere, 52.12 Basic information about the project Project essence Construction of shopping complex, which includes the implementation of consumer goods and the provision of services to the population Project capacity 6540 sq.m. Consumer market description natural and legal persons Labinsk city and neighboring settlements Object construction term 1 year Competitive advantage -quality services rendered; -vysokokvalifitsirovannye specialists; -good demand for retail space; -blagopriyatnaya market conditions Resource availability for project The choice of location of the object due to the realization growing needs of service delivery Planned volume of resource consumption (annual) Planned volume of electricity 139,6944 consumption (annual), MWh Planned volume of gas consumption 0,0084584 (annual), million cubic meters Planned volume of water consumption 0,538896 (annual), million cubic meters Degree of project development Developed a business plan, the ground area Financial estimation of the project Total coast of the project, mln rubles 27,09 Own resources, million rubles Means of regional (municipal) budget, million rubles Previously involved means, million rubles Investment capacity, mln rubles 27,09 Conditions of investor participation direct investment Form of investments return money Payback period 2,75 Basic indicators of investment project economic efficiency Net present value (NPV) 17,61 Simple payback time 2,75 Discounted payback period 3,25 Internal rate of return (IRR) 20,55% Productivity index (PI) 1,58 Income per year 25,80 Social efficiency of investment project Number of workplaces 28 Salary average level 218,57 Budgetary efficiency of investment project 9.1 9.2 10 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8 10.9 10.10 11 11.1 11.2 11.3 12 12.1 12.2 13 13.1 Mid-annual tax payments, million 6,79 rubles Which includes into consolidated 2,81 budget of the krai, million rubles General information about the ground area Address of area Labinsk city, street highway Voznesenskoe Cadastre account of ground area not registered Cadastre number of area/ of quarter 23:46:0401058:15 Declared area (m2) 55000,0 2 Limit size of the area (m ) 55000,0 land category Land settlements Kind of allowed use For agricultural use Actual use not used Availability of buildings, structures, no constructions Permits, town-planning documentation Placing the object corresponds to the general plan Labinsk settlement Labinsky district developed, LLC "Design Institute of Spatial Planning" and approved by Council Decision Labinsk settlement Labinsky rayona№202 / 56 dated 29.03.2013, the Information about proprietor (right holder) Proprietor state ownership Right holder state ownership Kind of right Information about encumbrance and limitation Kind of encumbrance, limitation no Encumbrance area Characteristics of existing engineering infrastructure Type of infrastructure Index Value Note Electricity supply Power supply Name, rightSS 35/10 kV center holder "Otkormbaza", "Kubanenergo" Electrotension 10 class Nearest connection point 13.2 Gas-supplying gas pipeline Nearest connection point Free power (MWt) Distance (m) Network tension (kV) Distance (m) Name, rightholder Diameter (mm) Pressure (Mpa) Carrying capacity (cube. m. in a year) Distance (m) Diameter (mm) Pressure (Mpa) Carrying 0,015 1500 10 250 JSC "Labinskraygaz" 159 0,3-06 - 500 159 03,-06 - 13.3 Water-supply Water supply source Nearest connection point 13.4 Sewerage system type of building Nearest point of connection 13.5 13.6 14 14.1 14.2 14.3 14.4 14.5 14.6 14.7 14.8 14.9 15 15.1 15.2 15.3 16 16.1 capacity (cube. m. in a year) Distance (m) Name, rightholder power (cubic meters a day) quality of water Distance (m) power (cubic meters a day) diameter (mm) Distance (m) Name, rightholder power (cubic meters a day) Distance (m) power (cubic meters a day) diameter (mm) Distance (m) Distance (m) Distance (m) 100 The planned well Projected local treatment facilities 100 - Installation of Central network telephones / Mobile internet communication Cost of maintenance of engineering 3,02 infrastructure, mln. Distance to the large settlements and object of a transport infrastructure Distance from Name Distance (km) Center of the municipality Labinsk 3 Nearest settlement Labinsk Krasnodar city 200 Highway (regional, federal regional value Labinsk 0,2 value) Labinsk-resistant Highways of local value Adjoining roads with 0,03 asphalt Nearest railway station station Labinskaya 4 nearest railway Labinsk-Shedok 0,7 airport Krasnodar 200 seaport Tuapse 180 Additional information about the ground area Special conditions Seismicity of the construction of 7 points Cost of rent / buy the ground area, mln. rub The cost of renting - 0,3911 Coordinates (longitude, latitude) 44°36'40.72"С, 40°45'41.16"В Notes Contact details Name: Administration Labinskiy district. Data on the project initiator Postal address: 352500, Russia, Krasnodar, (in case of existence information about Labinsk, ul.Konstantinova 2 the legal / physical person): Site: www.invest-labinsk.ru 16.2 Data about the applicant (Executive authority / local government executive authority) Deputy Chief of Staff Investment Policy 23.05.2014 Phone / Fax: (86169) 3-12-74 E-mail: labinvest@mail.ru Name: Administration Labinskiy district Postal address: 352500, Russia, Krasnodar, Labinsk, ul.Konstantinova 2 Site: www.invest-labinsk.ru Phone / Fax: (86169) 3-33-24 / 3-12-74 E-mail: labinvest@mail.ru Executive: Head of Investment and Business Development of the municipal administration Labinskiy district A.S.Statsenko G.A.Tsymbal