PASSPORT the investment project 1 The full name of the project

advertisement
PASSPORT
the investment project
1
2
3
4
4.1
The full name of the project
Construction of computer-aided animal husbandry
breeding rabbits on the territory of the farm Zuevo
Territorial membership
Municipal formation Armavir town
Branch, code of OKVED
Agriculture
01.25.2
General information about the project
A brief description of the project
This project aims at the realization of the investment
project for the construction of automated animal
husbandry for growing rabbits.
4.2
Design capacity
This project envisages the establishment of
agricultural enterprises in growing rabbits a
production capacity of 30 tons of meat per year.
4.3.
Consumer market description
Consumers of the products the company will perform
processing, the residents of the municipality and
nearby areas
4.4.
Period of construction
6 months
4.5
Competitive advantages
Rabbit is a skorospeloe animal, which allows
providing a high turnover (up to 8 cycles of slaughter
per year). A kilogram of weight gain of rabbit feed
2.6 units are required, unlike the 8 feed units per
pound of pork and gains 15 feed units to gain pounds
of beef. New technologies (developed in France,
Italy, Hungary) allow growing rabbits.
4.6
The availability of resources for
For the computer-aided animal husbandry breeding
the implementation of the project rabbits need a land plot with the area of 4ha
The planned volume of consumption of resources (annual)
5
5.1
Power, Mw
30
5.2
Gas, mln. m cube.
Not provided
5.3.
Water, mln. m cube.
0.015
5.4
The degree of development of the Developed business plan, formed the plot of land.
project:
6
Financial project evaluation
6.1
The total cost of the project, mln.
6.1
rub:
including
6.1.1. Own funds, m. rub:
6.1
6.1.2. The provincial (municipal)
budget. rub:
6.1.3. Previously raised funds, mln. rub:
6.2.
Need for investments, mln. rub:
6.1
6.3.
Forms of investment (Investor)
Direct investment
participation terms:
6.4.
Form of return on investment:
The Monetary
6.5
Term return on investment:
3 year
7
Main indicators of the economic efficiency of the investment project
7.1.
NPV (NPV) million. rub.
3.14
7.2
Simple payback period, years
2
7.3.
Discounted payback period, years
2.5
7.3.
7.4
7.5
Internal rate of return (IRR)
56.3%
Profitability index (PI)
1.5
Gross proceeds, mln. rub. in the
7.45
year
8
The social efficiency of project investment
8.1
The number of jobs
7
8.2
Average salaries (thousand rubl.)
192
9
Cost-effectiveness of investment project
9.1.
The average annual amount of tax
2.05
payments, m. rub.
9.2.
including in the consolidated
1.06
budget of the edge, mln rubles.
10
Basic information about the plot
10.1. Address location
Armavir, Moscow
10.2. Cadastral land records
Not registered
10.3. Inventory lot number/quarter
007001 23:38:08
10.4. Declared area (m2)
40000
10.5 Limit the size of the area (m2)
40000
10.6 Land category
Settlement land
10.7 Type of permitted use
Personal subsidiary farms (except the cultivation of
cattle and pigs)
10.8 Actual use
10.9 The presence of buildings,
Land plot is free of any buildings
structures
10.10 Licensing, town-planning
-Land use and building regulations, approved by the
documentation
decision of Armavir City Council approving the rules
of land use and development of municipal formation
Armavir town "dated 29/07/2010, no. 70, as amended,
29.11.2012. No. 327.
-General Plan of the city of Armavir city limits
project, approved by the decision of Armavir City
Council
No. 664 dated 18/02/2010 g.
11
Information about the owner (copyright holder) of the land plot
11.1. Owner
Public property
11.2. The Copyright Holder
Administration of municipal formation Armavir town
11.3. Type of law
Public property to distinguish the rights of
12
Information about encumbrances
12.1. Type of encumbrance, limitation
There Are No
12.2. Space charge
13
Description of the existing engineering infrastructure
13.1.
View infrastructure
Power Supply
Center
nutrition
The nearest
connection
Indicator
name of
owner
voltage class
free power
(Mw)
distance (m)
mains
voltage, kV
The Value Of
OAO «nesk-socket
Armavirèlektroseti ".
0
0
0
Construction network
Note
13.2.
Gas Supply
point
Gas Pipeline
distance (m)
name of
owner
diameter
(mm)
pressure
(MPA)
throughput
(m3/year)
distance (m)
diameter
(mm)
pressure
(MPA)
throughput
(m3/year)
distance (m)
0
Jsc "Armavirgorgaz"
Source of water
supply
Name of
owner
GUP KK N WOOK
"Kurganinsky group
plumbing»
0
The nearest
connection
point
power (cub.
m. vsut.)
water quality
distance (m)
power (cub.
m. vsut.)
diameter
(mm)
distance (m)
Name of
owner
power (cub.
m. vsut.)
distance (m)
power (cub.
m. vsut.)
diameter
(mm)
distance (m)
distance (m)
distance (m)
0
The nearest
connection
point
13.3.
13.4.
Water Supply
Sewerage System
The type of
structures
The nearest
connection
point
13.5.
13.6.
14
0
0
0
0
Construction network
0
0
0
Drinking
0
0
Construction network
0
GUP KK N WOOK
"Kurganinsky group
plumbing»
0
0
Construction network
0
Central network
0
Mobile
0
communications
The estimated cost of the land plot
0.4
engineering infrastructure, million
USD.
Distance to major cities and transportation infrastructure
Telephones/
Internet
14.9.
The Name
The central part of
the town of
Armavir
the nearest settlement
The Town Of
Novokubansk
the city of Krasnodar
The City Of
Krasnodar
Highway (provincial, federal) MOTORWAY
"Kavkaz"
roads of local significance
The Entrance to
the town of
Armaviru "
the nearest railway station
Railway St.
«Armavir-1»
Railway St.
«Armavir-2
the nearest railway track
Airport
The airport
Krasnodar
sea port
Novorossiysk
15
15.1.
Special conditions
14.1.
14.2.
14.3.
14.4.
14.5
14.6.
14.7.
14.8.
15.2.
15.3.
16
16.1.
16.2.
The distance from the
the center of the municipality
Distance (km)
37
16
270
12.5
14.7
29 28.7
21.3
220
380
Additional information on land
Seismicity of 7 points, the direction of
the winds: North-East.
The cost of the lease/purchase of the land,
0.02/02
millions of rubles.
Coordinates (longitude, latitude)
44.80138000
41.18736800
Notes
Plots are available from bidding, the
rent is calculated on the basis of market
value.
Contact information
Information about the initiator of the Name: administration of municipal formation
project
Armavir town
(in the case of the legal/natural
Postal address: 352900, Krasnodar region, town of
person):
Armavir, UL. Karl Liebknecht, 52
Website: www.armawir.ru
Phone/fax: 8-86137-4/30/12-30-12; 2-74-70;
Email: info@armawir.ru
Applicant information
Name: administration of municipal formation
(the executive body of a local
Armavir town
government entity/edge)
Postal address: 352900, Krasnodar region, town of
Armavir, UL. Karl Liebknecht, 52
Website: www.armawir.ru
Phone/fax: 8-86137-4/30/12-30-12; 2-74-70;
Email: info@armawir.ru
The acting
The Deputy Head of the municipal
Education City Armavir
N.j. Maslova
April 15, 2014 year