2.1. 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.2 2.2.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 2.3 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 2.3.6 2.4 2.4.1 2.4.2 2.4.3 2.4.4 2.5 2.5.1 2.5.2 2.5.3 2.5.4 SURAKHANY SITE Description General works Site mobilization works Topographical works Removal of wastes to specified locations Embankment (spread and compaction of soil excavated from site) Clearance, removal of roots of plant and, ground profiling Coating Leveling layer (spread and compaction of soil excavated from site) Artificial waterproof layer together with implementation of all relevant conditions (UV Sustainable HDPE geomembrane 1.5 mm thick) - Plane Artificial waterproof layer together with implementation of all relevant conditions (UV Sustainable HDPE geomembrane 1.5 mm thick) – Non-Plane Geosynthetic Water Collector System (covered by Geotextile) - Soft Protective Geotextile ( 300g / m ^ 2 ) Vegetable soil coat (t > 0.5m thick) Hayseed Seeding shrubs (including fertilizer) Electrical & Mechanical Works (M&E) Installation of electrical pump station includes: installation of lighting and socket, supply system of electric engine, cabling, conductor etc. Electric panel of Pump Station includes all necessary protective devices. Underwater pump composes hydraulic and electric connectors. Flow rate = 2m3 / h and atmospheric pressure = 0.3 bars. Centrifugal pump that fills watering tank with water. Flow rate = 6m3 / h and atmospheric pressure = 4 bars. It consists of hydraulic and electric connector. Watering plastic tank with capacity of 6 m3 placed on concrete base. It includes all necessary hydraulic connections. DN 40 polyethylene pipes for Watering system compose excavation and recovery of trench and all necessary hydraulic connections and network combinations (belt, valve, manhole) Collection system of seepage water Trench and pipe collection Manhole for seepage waters Recirculation system of Seepage waters via DN 40 polyethylene pipes (400 m length) Underwater pump of Seepage waters with flow rate 5m3 / h and cap 15 m length. It includes electric board, recovery of trench and excavation of cable duct, hydraulic and electrical connection and necessary automatic control panel. Road works Clearance and removal of roots of plants Excavation of soil and brittle rock Laying earth obtained from stock Construction of embankment Unit Quantity m3 m3 m2 1.00 1.00 250.000 35,195 157,000 m3 m2 20,610 37,950 m2 30,750 m2 m2 m3 kq 68,700 68,700 34,350 1,100 4,300 1.00 1.00 1.00 1.00 2.00 m 670 m 750 3.00 m 400 3.00 m3 m3 m3 m3 4,100 350 15,400 15,700 2.5.5 2.5.6 2.6 2.6.1 2.6.2 2.6.3 2.6.4 2.6.5 2.6.6 2.7 2.7.1 2.7.2 2.8. 2.8.1 2.8.2 Road foundation layer, 3 x 0,10m thick Construction of banked earth Other works Fencing Concrete water reservoir for watering and fire protection Biogas hole Trench for anti-flood Monitoring Culvert Other minor works (manhole, concreting works in small sites) Completion of design works Approval of design documents by official authorities Implementation of Health and safety plan Fulfillment of WHS program Temporary total for contingencies and expenses VAT (18%) Total m3 m3 12,600 150 m 1.370 1.00 6.00 1,650 1.00 145 m m 1.00 1.00 1.00 1.00