COACHELLA VALLEY WATER DISTRICT PLAN CHECK SUBMITTAL APPLICATION PLAN SUBMITTAL INFORMATION PROJECT INFORMATION Water Plans Sewer Plans Irrigation Plans PZ # Tract/PM No. Common Name: APN Number: ☐ ☐ ☐ Drainage Plans Stormwater Plans ☐ ☐ Non-Potable Plans ☐ NE,___NW,___SW___,SE,___ Sec,____ T,____ S, R____ E PROJECT TYPE Commercial: Gross Acres: ☐ Number of Parcels: Residential: Gross Acres: ☐ Number of Units: Building Sq. Footage: PROJECT ENGINEER OWNER Name: Name: Address: Address: Phone: Phone: Fax: Fax: E-mail: E-mail: Contact Name: Contact Name: Contact Phone: Contact Phone: Before accepting initial plan check submittals for Domestic Water, Sanitation, Irrigation, Drainage, and Stormwater improvements, the following documents must be submitted to the Coachella Valley Water District (CVWD): 1. 2. 3. 4. 5. 6. Preliminary Title Report (PTR) – No more than 30 days old. Hydraulic Model Checklist (See Attachment A). Hydraulic model information must be submitted to CVWD Engineering department for preparation of hydraulic modeling report for both sanitation and domestic water systems. It is recommended this process be started prior to submitting the initial plan check. Initial Plan Submittal fee. ($450 per type of plan.) Pipeline/trench detail calculations, geotechnical report and Trench Design Data Checklist (See Attachment B). Standard Agreement. One original, notarized standard agreement, with Exhibits “A” (legal description) and “B” (plat map). Each must have engineer's stamp and signature on 8½" x 11" paper per CVWD Standards for Legal Descriptions and Plats. Please attach Proof of Ownership and Authorization to Sign Agreement. The Standard Agreement is only applicable to water/sewer plans. (Original Agreement supplied on CVWD website.) Original Bill of Sale. Applicable only to water/sewer plans. (Original document supplied on CVWD website.) Page 1 of 4 ENG DS-001 (Rev 4/15/15) 7. 8. 9. SWSC Worksheet. Applicable only to domestic water plans. (Original document supplied on CVWD website.) Development Category Declaration. (Original document supplied on CVWD website.) Plan Checklists. (Original document supplied on CVWD website.) Before accepting second plan check submittals for Domestic Water, Sanitation, Irrigation, Drainage, and Stormwater improvements, the following documents must be submitted to the Coachella Valley Water District (CVWD): 1. 2. 3. 4. Copy of proposed Tract/Parcel Map with CVWD dedications OR original deed of easements with exhibits “A” (legal description) and “B” (plat map) per CVWD Standards for Legal Descriptions and Plats. Engineer’s Estimate of construction costs. Landscape/irrigation plans submitted to Water Management. Hydraulic modeling report for both the domestic water and sanitation system must be complete. Before release of signed mylars the following documents must be submitted to CVWD: 1. 2. 3. Tract drawing on CAD readable disc – one inch equals 100 feet (1” = 100’.) Execute Special Agreement (if applicable). Pay Sanitation Capacity Charge (SCC) – sewer only projects. Before request of a Pre-Construction meeting the following documents must be submitted to CVWD: 1. 2. 3. 4. Cash Deposit in the amount of 5 percent of construction costs, or $5,000, whichever is greater. CVWD Materials Submittal (Form ENG_INS-002). Electronic copy of the Recorded Tract/Parcel Map. Certificate of Insurance and Endorsements and Licensed Contractor (refer to exhibit “C” of Standard Agreement.) Submitted By: __________________________ Page 2 of 4 Date: _________________ ENG DS-001 (Rev 4/15/15) ATTACHMENT A Hydraulic Model Checklist Tract/Parcel No. Date: Project Common Name: Developer: Phone: Engineer: Phone: Engineer Signature: Print Name: Hydraulic Modeling for ☐ GENERAL 1. 2. 3. 4. 5. 6. 7. 8. Domestic ☐ Sanitation ☐ Both Letter from Developer requesting Hydraulic Modeling Process be initiated. a. Letter received from developer (Date:_____________) A $5,000 deposit for the Hydraulic Modeling Service. a. Deposit received (Date: ______________ Check # ______________) Project site map. Tentative Tract/Parcel Map. Information to determine number of equivalent dwelling units (for all project phase)*: a. Raw acreage of development b. Number and type of units c. Non-residential facilities including square footage of each land use type d. Other necessary information such as number of seats, tables, rooms, etc. Preliminary engineering plans for domestic water and sanitation pipelines within the proposed development. a. Plans must indicate the proposed pipe size b. Plans must include proposed elevations of facilities Letter from the Fire Marshal or Conditions of Approval indicating the development’s fire flow requirement(s). a. Fire flow(s) shall be stated in gpm b. Duration shall be indicated (hours or minutes) c. Letter must be for a specific project Will non-potable water be used for landscaping on this project? a. Yes No (If yes, provide approval documentation and description of non-potable use i.e. common areas, housing front yards etc.) Note: Any changes to the size of the development, units, land use, pipeline design may require that the model be re-run at the Developers expense. Page 3 of 4 ENG DS-001 (Rev 4/15/15) Coachella Valley Water District 75515 Hovley Lane East Palm Desert, CA 92211 ATTACHMENT B Trench Design Data Checklist Contact/Project Information Project Name: Engineer Firm: Date: Address: TM/PM#: APN #: Engineer of Record Name: Phone: Email: Cell: Design Information Description Material Pipeline: Provide all requested information for each cell Class Dia. (in) See DDM Appendix “N” See Section on “Material Selection” Trench Description Min (ft.) Max (ft.) See DDM Appendix “N” Non-Pressurized Pipeline (NPP) – Section 5.5 Pressurized Pipeline (PP) – Section 4.5 Live Load (Yes/No) Surface Type Trench Width: Trench Depth: Live Load Description Live Load Condition: Trench Material Description Pipe Backfill: Pipe bedding: Trench Foundation: Other Design Information Depth to Water (ft.): Soil Bearing Capacity (psf): Trench Factor of Safety: Soil Deflection Lag Factor: Note: Pavement Depth (in) See DDM Appendix “N” See load criteria Soil Material Depth N/A Density % See DDM Appendix “N” NPP Sec. 5.6 and PP Sec. 4.6 See Soil Classification Table 1 for NPP and Table 2 for PP Provide groundwater depth from Geotechnical Report. (Highlight and tag location of information in Geo Report) Provide soil bearing capacity at bottom of trench from Geotechnical Report per NPP Sect. 5.6 and PP Sect. 4.6. (Highlight and tag location of information in Geo Report) See required Factor of Safety per NPP Sect. 5.2 and PP Sect. 4.2 See deflection lag per NPP and PP ASTM D2321 Sections X1.4, X1.4.4 Engineer of Record shall submit Trench Design Calculations. Geotechnical Report must be stamped and dated within the last 3 years. FOR CVWD USE CVWD Comments: ☐ Geotechnical Report provided, marked, and highlighted ☐ Trench Information Complete CVWD Reviewed By: Date: Page 4 of 4 ENG DS-001 (Rev 4/15/15)