Arizona Electric Power Cooperative, Inc. 2014 RFI Bidders’ Conference April 4, 2014 Tempe, Arizona Agenda • • • • • • Introductions AEPCO & SWTC Burns & McDonnell RFI Information RFI Organization and Process Questions 2 Introductions AEPCO 2014 RFI Project Team • Dick Kurtz: AEPCO • Barry Brown: AEPCO • Shane Sanders: SWTC • Matt Lind: Burns & McDonnell • Jon Summerville: Burns & McDonnell 3 3 AEPCO AEPCO • Rural generation and transmission cooperative • Owns and operates the 605 MW Apache Generating Station in Cochise, Arizona • AEPCO serves six distribution cooperatives with wholesale power, and provides additional resources, scheduling, trading, and ancillary services to other members and non-member customers. 4 Service Territory 5 Burns & McDonnell Burns & McDonnell • Internationally recognized engineering and consulting firm serving clients since 1898 • Over 4,300 employees & 100% employee-owned firm • Proud to be #14 on FORTUNE’s 2014 List of 100 Best Companies to Work For 6 RFI Information RFI Requirements • Existing resources of up to 150 MWs beginning in 2015/2016 • Proposals must be for a minimum block of 50 MWs • PPA and TA preferred contract terms are for a minimum of 20 years; asset purchases must have a remaining asset life of at least 20 years • Coal facilities should have current pollution control technology and meet or exceed all emission and other environmental requirements • AEPCO’s share of the resource must be dispatchable by AEPCO 7 RFI Information RFI Requirements (continued) • Capacity and energy must have firm transmission and deliverability to the Palo Verde, Westwing, or Mead hubs or to interconnections of these hubs, such as Winchester, Topock, and Greenlee that have available transmission capacity • Proposals will be accepted for capacity and/or the associated dispatchable energy • Due to the fact that AEPCO does not have any retail load any proposals for energy efficiency or demand side management (DSM) will be deemed unresponsive and will not be accepted 8 8 RFI Information AEPCO is primarily interested in purchasing for ownership a portion of an efficient natural gas-fired asset, but if no such product is available AEPCO will also consider a dispatchable call option PPA from: (1) such an asset for a 20 year term, (2) a coal asset for up to 10 years, or (3) a tolling arrangement for a period up to 20 years. 9 9 Organization and Process AEPCO 2014 RFI Schedule Event Anticipated Date Release of RFI March 17, 2014 Bidder Conference April 4, 2014 Notice of Intent to Respond April 10, 2014 Proposal Submittal Deadline April 21, 2014 Selection of Short List and Notification June 30, 2014 Bidder Initial Contract Draft from Short List July 15, 2014 Negotiated Terms and Conditions End of 3rd Quarter 2014 AEPCO Member Approval December 10, 2014 Contract Execution December 18, 2014 10 10 Organization and Process Email address: AEPCORFI@burnsmcd.com Web site: http://AEPCORFI.com/ Attachment A: Response Data Attachment B: Non-Disclosure Agreement (NDA) Notice of Intent to Respond – April 10, 2014 11 11 Organization and Process Proposal Outline Executive Summary Overview of the proposal and project Proposal Limitations Time limits proposal is valid Technical Proposal & Cost Detail provided in Section C: PPA or TA Term Sheet located in Attachment A: Response Data. Company Data Experience and reference to web site for financials and reports 12 12 Organization and Process Respondents are asked to submit (via email) a Notice of Intent to Bid by April 10, 2014. Respondents are required to submit three (3) hard copies of each proposal and a CD with the spreadsheets provided in Attachment A: Response Data to the address below. Burns & McDonnell Attn: Jon Summerville 9400 Ward Parkway Kansas City, MO 64114 All proposals submitted in response to this RFI must be received by B&M no later than 5:00 PM EST April 21, 2014. 13 13 Organization and Process Reservation of Rights • AEPCO may not select any proposals • AEPCO may extend or terminate this RFI at any time • All proposals submitted to AEPCO may be used for any reasonable purpose by AEPCO. • AEPCO and B&M shall consider materials provided by respondent in response to this RFI to be confidential. • Proposal may be subject to discovery and disclosure in regulatory proceedings 14 14 Questions? Web: Email: www.aepcorfi.com AEPCORFI@burnsmcd.com Relevant questions from Bidders’ Conference will be transcribed and posted to the website by Tuesday April 8th 15 15