Ministry of Education and Human Resources Development Asset Management Division NAME OF PROJECT: ASSESSMENT REPORT DATE: Prepare by: Name: Name of AMD officer Mobile: Email: Project Name: eg. Girls Dorm School Name: Eg Pawa PSS Building Location: Eg, Attention: NAME SUBJECT: ASSESSMENT REPORT TO <Name of project and Location> 1. INTRODUCTION: This report contains results from the site Assessment carried out to <Project Name>, conducted by <Name of person carried out assessment> <Position> of MEHRD Asset Management Division on the <Date>. 2. PURPOSE: The purpose of this Assessment is to: (1) inspect and verify the <Asbestos content in the building or what…..> (2) .To prepare costing for removal of Asbestos content material if present in the building. 3. LOCATION OF BUILDING OR PROJECT: <Building OR Project name>School Name><District Ward>, <Province> Solomon Islands 4. DESCRIPTION: <Describe the project or building see sample below- delete this> (The building was built around 1980s and is situated on a levelled cut and fill area, previously a slope hill side. A concrete retaining wall is constructed at lower side of slope to hold in position ground fill material from cut area at highest point of slope within the land boundary. The said building is constructed of reinforced concrete columns and hardwood timber frames as main structure of building. Walls are constructed of timber frame with Fibre cement sheets interior wall and ceiling lining and timber exterior cladding. The roof framing is timber with roofing Iron sheets covering) 5. FINDINGS: Description 1. Staff office Building-Room 5 (e.g.) Contains/Works/Location status Wall lining-FC board Old Dusty 1. Staff office Building-Room 5 2. (e.g.) Ceiling lining-Fibre cement sheets/Board Old, signs of cracking visible 3. Classroom 4 (e.g.) Walls-150mm block walls Collapsed 4. RC Column 25Mpa Concrete, D16 (First and Second Steel rod, R10 plain steel Floor Columns) rod, Galvanized Tie wire, Form work/ Casing 5. Block walls 200mm Hollow Concrete (Ground Floor blocks, D12 steel rod , and First Floor Galvanized Tie wire and walls) 17Mpa Concrete core fill to HCB cells 6. Timber walls 100x50 Hardwood Timber (Second Floor frames and 150x25 Walls) cladding dressed timber Remarks/Comments -Suspected asbestos content -Remove and replace with different material. -Risky for staff member using the room. Suspected asbestos content -Remove and replace with different material. -Risky for staff member using the room -Not safe for students -Remove block wall and replace with timber Part of building completed 27% Completed (Included in erected part of building ) Part of Building 27% completed (Included in erected part of building ) Not reached construction stage that involve 0% complete Assessment Report 2 working with timbers Rough Timber 7. 8. 9. 10. Roof Framing 11. Roof Covering 12. Windows 50% Already supplied Corrugated roofing iron steel, Double sided sisalation paper, Bird wire netting 14. Plumbing Work 144x44 timber frames, Amplimesh, Louver blades, Louver frames, Insect screen netting 144x44 timber frames, Standard hard core doors, locks, knobs and hinges Plumbing items 15. Electrical Work Electrical items 16. Tiling 17. Drainage Ceramic & Vinyl tiles Gutterings 18. Reinforcement Reinforcement steel rod D12, D16, R6, R10, D20, & mesh wires 13. Doors Construction Current Construction stage work not sill on fist floor walls reach stage for roof covering work Some windows 27% completed installed Some doors installed 24% completed Underground pipe laid and water connected up Some materials for plumbing work are onsite Condition of material on site: Still in good condition Temporary electricity supply connected up, Preparation for wiring progressing Not installed Construction work not reach stage for guttering work Some steel rod and mesh wire used in the completed retaining walls, and part of building footing, columns and 16% completed Assessment Report 25% complete temporary power supply connected Not yet supplied Materials for guttering not supplied on site 32% completed/used up Some steel rod supplied onsite and are in good condition 3 19. Temporary support works 20. Blockworks Timbers 21. External claddings 22. Internal Claddings 23. Paintings Timber beams. Onsite 200mm blocks Yet to supply Some block 27% Complete work installed in part of building that completed Yet to supply Fibro & Masonites Yet to supply Yet to supply 0% supplied 24. Glazing Concrete Sealer paintsemi and full gloss paints, Pink Primer- semi and full gloss paints, Top coat paints-semi and full gloss. Louvre frames & glasses Some installed 25. Hardware Doors, locks nettings, nails Some doors installed. 23% completed, 77% remaining window work material are yet to supply on site. 24% supplied onsite. 6. OVERAL COMPLETION or assessment type STATUS OF THE BUILDING (See sample below) From the result of assessment of building carried out, it shows that the building has Asbestos materials. For safety purpose, it is a rule that buildings built in 1994 and backs wards shall be assumed as asbestos content, if fibre cement sheets/board or any other asbestos content material are used in the building. 7. Photos Assessment Report 4 8. RECOMMENDATION (Sample only) ( It is recommended, that all existing fibre cement board lining, in the buildings assessed are to be removed, by a qualified asbestos removal specialist and properly dispose at recommended location away from buildings, drinking water sources buried in the ground. The Fibre cement sheets shall not be reused by anyone. Date……………. Sign……………. Officer’s Name: Position: Assessment Report 5 Assessment Report 6