Up-to-date Development of Nuclear Power in Russia Petr Shchedrovitskiy, State Atomic Energy Corporation «Rosatom» 2011 Framework conditions for energy systems transformation New industrialization of developing nations; digitalization of the most developed economies Growing use of electricity in place of other energy sources and energy carriers v Urbanization Resource boom and rising demand for electricity v Changing resource mix for power generation v Environmental challenges and new national and international regulations v Changes in infrastructure and system of infrastructure management v www.rosatom.ru v v New specifications for energy systems Modernization of traditional energy technologies Development of new energy technologies (innovation) v Core transformation: “Smart energy” and “Smart grid” as narrative of the changes 2 Models of future energy markets Current situation Modernization Innovation «Energy Efficiency +» «New Paradigm» Large low carbon power generation: • Alternative energy • Gas; • Gas generation • Clean coal. • «Smart Grids»; • Nuclear; • Large scale energy storage technologies CCS Centralized energy system www.rosatom.ru Distributed generation 3 Basic scenario for transformation of energy systems Framework conditions Centralized energy systems “New paradigm” Distributed generation Energy market cycles Transition period 2010 www.rosatom.ru 4 ROSATOM Business Activities Uranium mining Uranium assets Front End assets Gas centrifuge technology Enrichment SWU/ LEU sales Fabrication Fuel assembles sales Machine works Energy assets VVER technology NPP construction in Russia NPP operation Electricity sales NPP engineering NPP construction outside Russia Spent Fuel treatment Radioactive wastes infrastructure Nuclear Ice breakers Back end assets www.rosatom.ru 5 5 Quick Facts about ROSATOM 24 GW installed nuclear capacity in Russia 14 reactors under construction 5,400 t U attributable production 17% of the fuel fabrication market 40% of the global enrichment market www.rosatom.ru ROSATOM Nuclear fuel cycle business Fuel Fabrication Uranium business • Mining: ~5400 t (plan for 2010) #5 Globally • Balance sheet of uranium resources: 630,000 t Enrichment • 40% of the global market • #1 Globally • HEU-LEU (plan for 2010) #1 Globally • 17% of the global market • Every 6th power reactor in the world loads ROSATOM fuel • Supplies for almost all VVER reactors Spent Nuclear Fuel Storage and Reprocessing • Storage and reprocessing of the research reactors fuel • Geological storage Nuclear fuel cycle Uranium mining projects and agreements outside Russia: • Kazakhstan • Mongolia • Namibia • South Africa • Australia www.rosatom.ru International Projects • Project of International Enrichment Center (IEC) in Angarsk, Russia R&D and production projects of new fuel types • MOX • High-Density Fuel • Fuel assemblies for PWRs Spent Nuclear Fuel Storage and Reprocessing • Closed fuel cycle • SNF dry reprocessing • Waste final disposition 7 Energy business: ROSATOM Nuclear Fleet in Russia Kola NPP: 4xVVER 440 Voronezh NPP: 4xVVER 440 + 1xVVER 1000 Balakovo NPP: 4xVVER 1000 Kalinin NPP: 3xVVER 1000 Rostov NPP: 2 xVVER 1000 Leningrad NPP: 4xRBMK Kursk NPP: 4xRBMK Smolensk NPP: 3xRBMK Beloyarsk NPP: 1xBN 600 www.rosatom.ru 8 Energy business: new NPP projects in Russia (Current Status) Sites explored, licenses for construction obtained. Actual timing and sequences of further works would depend on economic recovery in the country • Central NPP • Nizhny NPP • Seversk NPP • South Urals NPP • Tver NPP www.rosatom.ru Leningrad 2-3 Baltic 2 Leningrad 2-4 Nizhegorod 3 Baltic 1 Beloyarsk 4 2011 Rostov 4 2010 Leningrad 2-2 2009 Rostov 3 2008 Leningrad 2-1 2007 Voronezh 2-1 2006 Kalinin 4 Rostov 2 ROSTOV 2 2009 – first criticality 2010 – connected to grid, gradual increase of power -Voronezh 2-2 Total of 10 units 2012 2013 2014 2015 2016 2017 2018 2019 2020 9 Energy business: ROSATOM in Nuclear Generation, Today and Tomorrow Global Nuclear Capacity: #2 Globally GW EDF 27 31 25.2 63 ROSATOM EXELON Rise of ROSATOM Nuclear Capacity, GW 33 24 18 ROSATOM Long-Term Development Program Production: #1 in Russia, #2 in NPP Generation Globally TWh (2009) 163.3 ROSATOM RUSHYDRO 2011 2012 2014 2015 Rise of ROSATOM Production, TWh 234.4 163.3 80.1 MOSENERGO 61.7 2009 www.rosatom.ru 2015 10 10 Nuclear systems engineering: ROSATOM Nuclear Technologies in the World #1 in construction of new NPPs globally 3 new NPPs under construction outside of Russia Finland Slovakia Czech republic Hungary Bulgaria Belorussia Ukraine Каzakhstan Armenia Turkey Morocco Libya Jordan China Iran Egypt India 52 units of Russian design built outside Russia, 36 units are operational in 8 countries. Finalized in 2010 Reactors under construction www.rosatom.ru Vietnam Extended offer in Asia: India (up to 12 units on three sites) China: further units on Tianwan site (3&4 ) Vietnam: first NPP in South-East Asia Agreements and negotiations 11 Nuclear systems engineering: VVER-TOI Informatization 3D Engineering technologies 6D Construction technologies Characteristics: Diagnostics of VVER 2009 technology as businessproduct 2011 VVER 1000 TOI as technology 2012 VVER 1000 TOI as business product Technology modernization www.rosatom.ru • 60 years of operation; • Power capacity:1100-1200 MW; • 40 +6 months of construction; • Lowering time of construction and number of specialists involved; • IT platforms for continuous improvement of the core VVER design; • Supplier Relationship Management system to optimize procurement costs. 12 Nuclear systems engineering: Fast Reactors (FR) New Technology Platform Demonstration of technology of MOX-fuel processing for BN FRs Experience: 27 years of BN-600 commercial operation R&D on nitride fuel R&D on FR with heavy metal coolants Technology of wet waste storage Facility for MOX-fuel fabrication for FRs • 2014: selection of technological design for future FRs • 2014-2015: Start of BN-800 FR operation Project of commercial energy FR reactor prototype (BN-P4) R&D on dry spent nuclear fuel reprocessing; technologies of МА Pilot industrial facility for nitride fuel fabrication Construction of MBIR Materials Test Reactors Construction of NPP with SVBR-100 FR Waste final disposition and U-Th cycle transmutation www.rosatom.ru 13 Fast Reactors (FRs) can provide solutions for many hard questions of global energy markets Fast Reactors Lowering costs of generation Energy poverty and rising global energy bills www.rosatom.ru Serial Production Rise of demand Various power levels Diversification of demand • Extensive resource base; • Resource multiplication when fast reactors are used Resources Security and guarantees of supplies; Nonprolifiration Energy Security • Carbon free generation; • Easing of ecology concerns for closed nuclear fuel cycle Ecology 14 Nuclear systems engineering: Fusion technology Nuclear research: • Basic research on fusion GNC RF TRINITI Impulse Thermonuclear Facility “Angara-5-1” Fusion facility “TSP” Tokamak with strong magnetic field “Tokomak T-11M” Facility Fusion Research and experiments in support of Russian part of ITER Project” ITER Russian Participation: ~10% of obligations in form of high-tech equipment www.rosatom.ru • Detectors • Surface Strengthening • Data bases Nuclear Fusion Technologies to be developed: • Tritium System • Pellet injection system • Remote control and hot cells • Breeding blanket • Plasma technologies • Neutral beam system ITER: • 2030 - Demonstration facility (DEMO) • 2050 - Engineering and construction of Industrial Fusion Facility; Final experiments of fusion generation technologies. 15 Development of «Rosatom» Technology Platforms in Nuclear Power Generation Nuclear Fusion Technologies New Technology Platform Modernization of thermal reactors Optimization and innovation 3D and 6D technologies: reduction of costs and time of NPP construction, design optimization More efficient fuel use New Reactors Capacities Safety improvement and life-time extension New technologies of SNF reprocessing Fast reactors technologies Fuel cycle technologies Lead High density fuel МОХ fuel Lead-bismuth SNF dry reprocessing Sodium Waste final disposition Codes Materials Research in Russia ITER Fusion R&D Detectors Energy conversion Surface Strengthening Data bases New Energy Technologies Superconductivity Technologies Materials for accumulators and generation systems Smart systems Products for New Markets Niches 1 MW Reactor www.rosatom.ru VTGR High-Temperature Gas Cooled Reactors 16 New energy technologies of ROSATOM Energy Transmission High-Temperature Superconductive Cables Energy Storage SPIN Generation and Grid Projects www.rosatom.ru Superconductive Flywheels R&D on small power generation from fuel cells, plasma-dust energy conversion modules, etc. Li-Ion accumulators «Smart towns» and Smart Grid Systems Projects 17 ROSATOM Technology platforms on future markets VVER VVER-TOI • Alternative generation technologies; • Superconductivity technologies; • Smart systems • 1 MW reactor Centralized energy systems “New paradigm” Distributed generation New Technology Platform (FR and closed fuel cycle) Transition period 2010 www.rosatom.ru 18